Search NASA⌕ Search

SEARCH · Search NASA

Results for “Joint Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

X-29 vortex flow control tests

A joint Air Force/NASA X-29 aircraft program to improve yaw control at high angle of attack using vortex flow control (VFC) is described. Directional VFC blowing proved to a be a powerful yaw moment generator and was very effective in overriding natural asymmetries, but was essentially ineffective in suppressing wing rock. Symmetric aft blowing also had little effect on suppressing wing rock.

Hancock, Regis↗

Optical cross beam field tests at ESSA Haswell Field site, October 1969

A series of tests with both the visible and IR optical cross beam systems was made at the Haswell, Colorado, Field Site of ESSA. This memorandum covers only the details of the test setup and runs. A joint field test program was undertaken by ESSA at a 164 meter (500 foot) meteorological tower. The tower was instrumented with wind sensors, temperature sensors, temperature sensors, fluctuating wind and temperature sensors and humidity sensors. The sensors were located at three elevations: 42, 192 and 162 meters. A movable elevator was also instrumented and could be positioned at any desired location along the tower height. The main object of the cross beam studies was to compare the visible and IR systems. The instruments were also arranged so that direct comparison with the sensors on the tower can be made.

Sandborn, V. A.↗

Space Telescope performance and verification

The verification philosophy for the Space Telescope (ST) has evolved from years of experience with multispacecraft programs modified by the new factors introduced by the Space Transportation System. At the systems level of test, the ST will undergo joint qualification/acceptance tests with environment simulation using Lockheed's large spacecraft test facilities. These tests continue the process of detecting workmanship defects and module interface incompatibilities. The test program culminates in an 'all up' ST environmental test verification program resulting in a 'ready to launch' ST.

Wright, W. F.↗

Recent Flight Test Results of the Joint CIAM-NASA Mach 6.5 Scramjet Flight Program

Under a contract with NASA, a joint Central Institute of Aviation Motors (CIAM) and NASA team recently conducted the fourth flight test of a dual-mode scramjet aboard the CIAM Hypersonic Flying Laboratory, 'Kholod'. With an aim test Mach 6.5 objective, the successful launch was conducted at the Sary Shagan test range in central Kazakstan on February 12, 1998. Ground-launch, rocket boosted by a modified Russian SA5 missile, the redesigned scramjet was accelerated to a new maximum velocity greater than Mach 6.4. This launch allowed for the measurement of the fully supersonic combustion mode under actual flight conditions. The primary program objective was the flight-to-ground correlation of measured data with preflight analysis and wind-tunnel tests in Russia and potentially in the United States. This paper describes the development and objectives of the program as well as the technical details of the scramjet and SA5 redesign to achieve the Mach 6.5 aim test condition. An overview of the launch operation is also given. Finally, preliminary flight test results are presented and discussed.

Roudakov, Alexander S.↗

Design, fabrication and test of graphite/polyimide composite joints and attachments for advanced aerospace vehicles

Bonded and bolted designs are presented for each of four major attachment types. Prepreg processing problems are discussed and quality control data are given for lots 2W4604, 2W4632 and 2W4643. Preliminary design allowables test results for tension tests and compression tests of laminates are included. The final small specimen test matrix is defined and the configuration of symmetric step-lap joint specimens are shown. Finite element modeling studies of a double lap joint were performed to evaluate the number of elements required through the adhesive thickness to assess effects of various joint parameters on stress distributions. Results of finite element analyses assessing the effect of an adhesive fillet on the stress distribution in a double lap joint are examined.

Skoumal, D. E.↗

Structural Analysis, Modeling, and Testing of Multi-nut Joint for TriTruss Structure

The Multi-nut joint, developed at NASA Langley Research Center (LaRC), was designed to assemble TriTruss modules for a doubly curved 65.6-feet telescope support structure. Axial and bending tests for a multi-nut joint in the TriTruss structure were conducted to characterize the structural performance of the multi-nut joint and to obtain the installation torque value of the attachment fastener. This paper describes the summary of the axial and bending tests of the multi-nut joint, along with the test results. The equivalent axial stiffness (EA) and equivalent bending stiffness (EI) of the multi-nut joint were characterized based on these test results and are presented in this report. Additionally, finite element models (FEMs) of the axial and bending test specimens were developed, and the predicted axial and bending responses of the multi-nut joint were compared with the test results. Test-analysis comparison results show that the predicted axial load-displacement response of the test specimen was within 5 percent of the test results, while the predicted load-bending response of the test specimen exhibited a consistent trend with the test data.

TriTruss↗

A Method for and Issues Associated with the Determination of Space Suit Joint Requirements

This joint mobility KC lecture included information from two papers, "A Method for and Issues Associated with the Determination of Space Suit Joint Requirements" and "Results and Analysis from Space Suit Joint Torque Testing," as presented for the International Conference on Environmental Systems in 2009 and 2010, respectively. The first paper discusses historical joint torque testing methodologies and approaches that were tested in 2008 and 2009. The second paper discusses the testing that was completed in 2009 and 2010.

Matty, Jennifer E.↗

Field joint protection system rain qualification test report

This report documents the procedures, performance, and results obtained from the Field Joint Protection System (FJPS) rain test. This test was performed to validate that the flight configuration FJPS prevents the accumulation of moisture in the redesigned solid rocket motor (RSRM) field joints when subjected to simulated prelaunch natural rain environments. The FJPS test article was exposed to rain simulation for approximately 50 minutes. During the test, water entered through the open upper end of the systems tunnel and was funneled down between the tunnel and case. A sealant void at the moisture seal butt splice allowed this water to flow underneath the FJPS. The most likely cause of voids was improper bondline preparation, particularly on the moisture seal surface. In total, water penetrated underneath approximately 60 percent of the FJPS circumference. Because the test article was substantially different from flight configuration (no systems tunnel closeout), results of this test will not affect current flight motors. Due to the omission of systems tunnel covers and systems tunnel floor plate closeout, the test assembly was not representative of flight hardware and resulted in a gross overtest. It is therefore recommended that the test be declared void. It is also recommended that the test be repeated with a complete closeout of the systems tunnel, sealed systems tunnel ends, and improved adhesive bondline preparation.

Cook, M.↗

Development flight tests of the Viking decelerator system.

Significant aspects of a low altitude flight test phase of the overall Viking decelerator system development are given. This test series included nine aircraft drop tests that were conducted at the Joint Parachute Test Facility, El Centro, California, between September 1971 and May 1972. The test technique and analytical planning method utilized to best simulate loading conditions in a low density environment are presented and some test results are shown to assess their adequacy. Performance effects relating to suspension line lengths of 1.7 D sub o with different canopy loadings are noted. System hardware developments are described, in particular the utilization of a fabric deployment mortar cover which remained attached to the parachute canopy. Finally, the contribution of this test series to the overall program is assessed.

Murrow, H. N.↗

Structural Analysis, Modeling, and Testing of Multi-nut Joint for TriTruss Structure

The Multi-nut joint, developed at NASA Langley Research Center (LaRC), was designed to assemble TriTruss modules for a doubly curved 65.6-feet telescope support structure. Axial and bending tests for a multi-nut joint in the TriTruss structure were conducted to characterize the structural performance of the multi-nut joint and to obtain the installation torque value of the attachment fastener. This paper describes the summary of the axial and bending tests of the multi-nut joint, along with the test results. The equivalent axial stiffness (EA) and equivalent bending stiffness (EI) of the multi-nut joint were characterized based on these test results and are presented in this report. Additionally, finite element models (FEMs) of the axial and bending test specimens were developed, and the predicted axial and bending responses of the multi-nut joint were compared with the test results. Test-analysis comparison results show that the predicted axial load-displacement response of the test specimen was within 5 percent of the test results, while the predicted load-bending response of the test specimen exhibited a consistent trend with the test data.

Structural analysis↗

Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process, nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations, both the Russian and U.S. sides have implemented testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement, and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November. Testing included: (1) a sit-tostand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 min while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness were collected for analysis. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Flight Set 360L006 STS-34 field joint protection system, thermal protection system, and systems tunnel components, volume 4

The performance of the thermal protection system, field joint protection system, and systems tunnel components of Flight Set 360L006, are documented, as evaluated by postflight hardware inspection. The condition of both motors was similar to previous flights. Sixteen aft edge hits were noted on the ground environment instrumentation thermal protection system. Each hit left a clean substrate, indicating that the damage was caused by nozzle severance debris and/or water impact. No National Space and Transporation System debris criteria for missing thermal protection system were violated. One 5.0 by 1.0 in. unbond was observed on the left hand center field joint K5NA closeout and was elevated to an in-flight anomaly (STS-34-M-4) by the NASA Ice/Debris team. Aft edge damage to the K5NA and an associated black streak indicate that burning debris from the nozzle severance system was the likely cause of the damage. Minor divots caused by debris were seen on previous flights, but this is the first occurrence of a K5NA unbond. Since the unbond occurred after booster separation there is no impact on flight safety and no corrective actions was taken. The right hand center field joint primary heater failed the dielectric withstanding voltage test after joint closeout. The heater was then disabled by opening the circuit breaker, and the redundant heater was used. The redundant heater performed nominally during the launch countdown. A similar condition occurred on Flight 4 when a secondary joint heater failed the dielectric withstanding voltage test.

Wilkinson, J. P.↗

Evaluation of the fuselage lap joint fatigue and terminating action repair

Terminating action is a remedial repair which entails the replacement of shear head countersunk rivets with universal head rivets which have a larger shank diameter. The procedure was developed to eliminate the risk of widespread fatigue damage (WFD) in the upper rivet row of a fuselage lap joint. A test and evaluation program has been conducted by Foster-Miller, Inc. (FMI) to evaluate the terminating action repair of the upper rivet row of a commercial aircraft fuselage lap splice. Two full scale fatigue tests were conducted on fuselage panels using the growth of fatigue cracks in the lap joint. The second test was performed to evaluate the effectiveness of the terminating action repair. In both tests, cyclic pressurization loading was applied to the panels while crack propagation was recorded at all rivet locations at regular intervals to generate detailed data on conditions of fatigue crack initiation, ligament link-up, and fuselage fracture. This program demonstrated that the terminating action repair substantially increases the fatigue life of a fuselage panel structure and effectively eliminates the occurrence of cracking in the upper rivet row of the lap joint. While high cycle crack growth was recorded in the middle rivet row during the second test, failure was not imminent when the test was terminated after cycling to well beyond the service life. The program also demonstrated that the initiation, propagation, and linkup of WFD in full-scale fuselage structures can be simulated and quantitatively studied in the laboratory. This paper presents an overview of the testing program and provides a detailed discussion of the data analysis and results. Crack distribution and propagation rates and directions as well as frequency of cracking are presented for both tests. The progression of damage to linkup of adjacent cracks and to eventual overall panel failure is discussed. In addition, an assessment of the effectiveness of the terminating action repair and the occurrence of cracking in the middle rivet row is provided, and conclusions of practical interest are drawn.

Samavedam, Gopal↗

Results of uniaxial and biaxial tests on riveted fuselage lap joint specimens

As part of an FAA-NLR collaborative program on structural integrity of aging aircraft, NLR carried out uniaxial and biaxial fatigue tests on riveted lap joint specimens being representative for application in a fuselage. All tests were constant amplitude tests with maximum stresses being representative for fuselage pressurization cycles and R-values of 0.1. The parameters selected in the testing program were the stress level (sigma(sub max) = 14 and 16 ksi) and the rivet spacing (0.75 and 1.0 inch). All specimens contained 3 rows of countersunk rivets, the rivet row spacing was 1 inch and the rivet orientation continuous.

Vlieger, H.↗

Thermal-mechanical fatigue test apparatus for metal matrix composites and joint attachments

Two thermal-mechanical fatigue (TMF) test facilities were designed and developed, one to test tungsten fiber reinforced metal matrix composite specimens at temperature up to 1430C (2600F) and another to test composite/metal attachment bond joints at temperatures up to 760F (1400F). The TMF facility designed for testing tungsten fiber reinforced metal matrix composites permits test specimen temperature excursions from room temperature to 1430C (2600F) with controlled heating and loading rates. A strain-measuring device measures the strain in the test section of the specimen during each heating and cooling cycle with superimposed loads. Data is collected and recorded by a computer. The second facility is designed to test composite/metal attachment bond joints and to permit heating to a maximum temperature of 760C (1400F) within 10 min and cooling to 150C (300F) within 3 min. A computer controls specimen temperature and load cycling.

Westfall, Leonard J.↗

Thermal-mechanical fatigue test apparatus for metal matrix composites and joint attachments

Two thermal-mechanical fatigue (TMF) test facilities were designed and developed, one to test tungsten fiber reinforced metal matrix composite specimens at temperature up to 1430C (2600F) and another to test composite/metal attachment bond joints at temperatures up to 760C (1400 F). The TMF facility designed for testing tungsten fiber reinforced metal matrix composites permits test specimen temperature excursions from room temperature to 1430C (2600F) with controlled heating and loading rates. A strain-measuring device measures the strain in the test section of the specimen during each heating and cooling cycle with superimposed loads. Data is collected and recorded by a computer. The second facility is designed to test composite/metal attachment bond joints and to permit heating to a maximum temperature of 760C (1400F) within 10 min and cooling to 150C (300F) within 3 min. A computer controls specimen temperature and load cycling.

Westfall, L. J.↗