Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Los Alamos National Laboratory Impacts and Investments in Santa Fe County

Santa Fe County is home to 2,357 LANL employees and contractors. LANL's estimated economic impact in Santa Fe County in FY09 was $\$$672M (based on employee salaries and benefits, indirect and induced impacts, and retirement benefits as determined in a study conducted by the University of New Mexico's Bureau of Business and Economic Research). In FY10, LANL purchased $\$$26,448,987 in products and services from Santa Fe County businesses. Santa Fe is one of seven northern New Mexico counties identified in the Lab's maintenance and operations contract with NNSA that is targeted for education, economic development, and charitable giving programs through the LANS, LLC Community Commitment Plan.

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Fall Avian Migration Monitoring Report 2010-12

During the fall of 2012, Los Alamos National Security, LLC (LANS) biologists completed the 3rd year of monitoring fall migration passerines (songbirds) at Los Alamos National Laboratory (LANL). Songbirds were captured at a mist-netting station located in a large wetland/riparian complex in Technical Area (TA)-36 on the north side of Pajarito Road in Los Alamos County. Captured birds were identified, measured, and banded with a U.S. Fish and Wildlife Service (USFWS) migratory bird band. Banding operations took place between 7 August and 10 October 2012 with the completion of a total of ten mist-netting sessions. This project was conducted as part of implementation of the Biological Resources Management Plan (BRMP) and is in compliance with the 2006 Memorandum of Understanding (MOU) between the USFWS and the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Executive Order 13186.

Basic Biological Sciences↗

Demolition Notification for Quarter Ending June 30, 2013

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are submitting notice of demolition activities for the quarter ending June 30,2013, in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit), to the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB).

54 ENVIRONMENTAL SCIENCES↗

Expedited Demolition Notification for Structures at Technical Area 54

The National Nuclear Security Administration (NNSA) and Los Alamos National Security, LLC (LANS) (collectively the Permittees) are informing the New Mexico Environment Department Hazardous Waste Bureau (NMED-HWB) of the need to expedite the demolition of structures summarized in the enclosure. These structures have recently been identified to receive funding and be demolished. Structure TA-54-0296 will be demolished prior to December 30, 2012. The remaining structures covered by this notification will be demolished within the January 1, 2013 through March 31, 2013 quarter.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities

As a result of the Las Conchas Fire, the Department of Energy in correspondence SO:32CK 372899 (DOE 2011) requested that LANS take the following action: Evaluate the Las Conchas fire experience and other data on airborne projection of burning embers and the appropriate planning and controls for Los Alamos National Laboratory (LANL) facilities, including nuclear and high hazard facilities. This paper addresses the DOE action by evaluating 1) the meteorology at the time of the accident and implications for new wild land fires; 2) the ability of LANL facilities to withstand fires as a result of burning embers, and 3) LANL programs in place to mitigate the effects of wild land fires. The spread of fire as a result of burning embers is a known and important mechanism. Both empirical and computational studies have been performed, and it is recognized that these studies should continue (Kim 2009, Koo 2010, Sardoy 2007). Due to the locale and environs of LANL, burning brands or embers from forest fires are a credible risk at LANL. With the exception of the Area G TRU Waste Facility, LANL nuclear facilities have fire resistant exteriors with UL Class A roofs. Waste at Area G is stored in fire resistant containers. The laboratory has comprehensive Emergency Operations and Fire Protection Programs, which includes assessing wildland fire risk and mitigating the spread of fires, for example, by maintaining fire breaks and additional defensible buffer areas free of combustibles around LANL facilities and limits on combustible loading. Vegetation is cut-back to at least national consensus standards on a regular basis around nuclear facilities. Fire Department services are provided by Los Alamos County through an agreement with the Department of Energy. The interface between the Fire Department and LANL during emergencies is the Emergency Operations Division. The ability of LANL facilities to withstand a wildland fire was tested by both the Cerro Grande fire in 2000 as well as the Las Conchas fire. No nuclear or high-hazard facilities were damaged even though the Cerro Grande fire burned around a number of the facilities. Since then, the laboratory has strengthened programs to protect against wildland fires.

99 GENERAL AND MISCELLANEOUS↗

FLC Nomination: The Los Alamos National Security Venture Acceleration Fund

Los Alamos National Security, LLC (LANS), the manager of Los Alamos National Laboratory (LANL or the Laboratory), invests $1 million per year in economic development through a program known as Los Alamos Connect, formerly Northern New Mexico Connect. Administered by the Santa Fe, New Mexico-based, nonprofit economic development organization Regional Development Corporation in partnership with the Laboratory’s Technology Transfer Division (TT), Los Alamos Connect offers a variety of business development services and activities to assist entrepreneurs and businesses in northern New Mexico at no cost.

99 GENERAL AND MISCELLANEOUS↗

Demolition Notification for Quarter Ending March 30, 2014

The National Nuclear Administration (NNSA) and Los Alamos National Security, LLC (LANS), (collectively the Permittees) are submitting notice of demolition activities for quarter ending March 30, 2014 in accordance with Permit Section 1.17.2 of the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit to the New Mexico Environment Department Hazardous Waste Bureau (NMED_HWB).

54 ENVIRONMENTAL SCIENCES↗

Feral Cattle in the White Rock Canyon Reserve at Los Alamos National Laboratory

At the request of the Los Alamos Field Office (the Field Office), Los Alamos National Security (LANS) biologists placed remote-triggered wildlife cameras in and around the mouth of Ancho Canyon in the White Rock Canyon Reserve (the Reserve) to monitor use by feral cattle. The cameras were placed in October 2012 and retrieved in January 2013. Two cameras were placed upstream in Ancho Canyon away from the Rio Grande along the perennial flows from Ancho Springs, two cameras were placed at the north side of the mouth to Ancho Canyon along the Rio Grande, and two cameras were placed at the south side of the mouth to Ancho Canyon along the Rio Grande. The cameras recorded three different individual feral cows using this area as well as a variety of local native wildlife. This report details our results and issues associated with feral cattle in the Reserve. Feral cattle pose significant risks to human safety, impact cultural and biological resources, and affect the environmental integrity of the Reserve. Regional stakeholders have communicated to the Field Office that they support feral cattle removal.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Permit Modification Request for Technical Area 63 Transuranic Waste Facility Hazardous Waste Container Storage Unit (Rev. 3)

This Class 3 permit modification requests the addition of a hazardous waste management unit, the Transuranic Waste Facility (TWF), to the Los Alamos National Laboratory Hazardous Waste Facility Permit (November 2010), (hereinafter referred to as “the Permit”). The Permit was issued by the New Mexico Environment Department (NMED) in November, 1989 and renewed in 2010 (NMED 2010). The Los Alamos National Laboratory (LANL) Environmental Protection Agency (EPA) Identification Number is NM0890010515. The facility is owned by the National Nuclear Security Administration (NNSA) of the Department of Energy (DOE), and is operated jointly by NNSA-DOE and by Los Alamos National Security, LLC (LANS). This permit modification request has been prepared to address requirements in the New Mexico Administrative Code, Title 20, Chapter 4, Part 1 (20.4.1 NMAC), as revised October 2009, that are specific for the proposed new hazardous waste storage operations at the TWF. The renewed Permit contains many of the conditions addressing the requirements of the New Mexico Hazardous Waste Act (NMHWA) and implementing regulations, specifically 40 CFR, that are common to all LANL hazardous waste management units. The relevant sections of the Permit are referenced throughout this document. Together, information provided in this document and in the Permit will meet the applicable requirements specified in 40 CFR Parts 264 and 270 for the proposed unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notification of General Class 1 Permit Modification for the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit). The text modifications are provided herein and have been made to the Permit by the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS), collectively the Permittees. The modifications to the text of the Permit have been identified using red text and red lines through the texts for deletions. Description: This modification includes three changes. One change includes an address change within the Attachment D, Contingency Plan, and the remaining changes correct two typographical errors in Permit Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2012 Update to the Site Discharge Pollution Prevention Plan (Rev. 1): Overview

The U.S. Department of Energy (DOE) and Los Alamos National Security, LLC (LANS), collectively the Permittees, have prepared this Update to the Site Discharge Pollution Prevention Plan, Revision 1 (hereafter, the SDPPP Update) for the Individual Storm Water Permit pursuant to the requirements of National Pollutant Discharge Elimination System (NPDES) Permit No. NM0030759 (hereafter, the Individual Permit or Permit or IP), as authorized by the U.S. Environmental Protection Agency (EPA). The Individual Permit authorizes the discharge of storm water associated with historical industrial activities at Los Alamos National Laboratory (the Laboratory) from specified solid waste management units (SWMUs) and areas of concern (AOCs), collectively referred to as Sites. The Individual Permit does not regulate storm water discharges associated with current conventional industrial activities at the Laboratory. The Permit—NPDES No. NM0030759—incorporating the latest modifications became effective on November 1, 2010.

54 ENVIRONMENTAL SCIENCES↗

Technical Basis for the Removal of Unremediated Nitrate Salt Sampling (UNS) to Support LANL Treatment Studies

The sampling of unremediated nitrate salts (UNS) was originally proposed by the U.S. Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) (collectively, the Permittees) as a means to ensure adequate understanding and characterization of the problematic waste stream created when the Permittees remediated these nitrate salts-bearing waste with an organic absorbent. The proposal to sample the UNS was driven by a lack of understanding with respect to the radioactive contamination release that occurred within the underground repository at the Waste Isolation Pilot Plant (WIPP) in February 14, 2014, as well as recommendations made by a Peer Review Team. As discussed, the Permittees believe that current knowledge and understanding of the waste has sufficiently matured such that this additional sampling is not required. Perhaps more importantly, the risk of both chemical and radiological exposure to the workers sampling the UNS drum material is unwarranted. This memo provides the technical justification and rationale for excluding the UNS sampling from the treatment studies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

De-Inventory Plan for Transuranic Waste Stored at Area G

This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this work and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quality New Mexico Performance Excellence Award Roadrunner Application 2016

The Human Resources (HR) Division is a critical part of Los Alamos National Laboratory, an internationally recognized science and R&D facility with a specialized workforce of more than 10,000. The Laboratory’s mission is to solve national security challenges through scientific excellence. The HR Division partners with employees and managers to support the Laboratory in hiring, retaining, and motivating an exceptional workforce. The Laboratory is owned by the U.S. Department of Energy (DOE), with oversight by the DOE’s National Nuclear Security Administration (NNSA). In 2006, NNSA awarded the contract for managing and operating the Laboratory to Los Alamos National Security, LLC (LANS), and a for-profit consortium. This report expounds on performance excellence efforts, presenting a strategic plan and operations.

99 GENERAL AND MISCELLANEOUS↗

Watchdog Project

The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control system owners have very little choice on how to protect communications on the local network. The Watchdog project reduces security risks in electric sector control system local area networks (LANs) by providing: Network access control (NAC) Multi-Layer firewall (physical through transport layer) Containment of malware or unauthorized traffic spreading across the network White list protocols and application message types filtering Configurable, proactive traffic engineering The Watchdog project achieved all of the above by developing an SDN switch.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SDN Project

The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information technology and operational technology engineers, to be the ones centrally administering the technology and responding to events; Simplifies network configuration, improving deterministic Ethernet transport times, and providing instant visualization on where the communication circuits are and how all circuits are impacted when changes (e.g., configuration changes, failures or intrusions) happen, allowing operators to minimize downtime; and Improves the ability to identify deviations in network behavior resulting in detection and analysis of potential cyber intrusions and faster response times Results: This project has forever changed the way critical infrastructure networks are designed, secured, deployed and maintained. The cybersecurity and performance advantages achieved are significant, simply put traditional networking has been obsoleted while the team maintained Ethernet interoperability avoiding any legacy concerns. The team commercially released technology that accomplished all the cybersecurity goals outlined in the SOPO and completed it by executing the project management plan approved in the initial contract. The resulting Energy sector SDN flow controller model number is SEL-5056 and can be freely downloaded from the www.SELinc.com website. This technology not only improves the cybersecurity of control systems but has measured results that it improves the performance and reliability of the control system as well. This means the system owners can confidently apply it to their systems knowing that it will, “first do no harm” but actually improve the system as well. Success of the project is best measured by the sales and deployment of the technology. System owners in industrial, electric, defense, and oil and gas only months after commercial release have approved plans for deployment.

42 ENGINEERING↗