Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH SITE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Optimal RTLS abort trajectories for an HL-20 personnel launch vehicle

The primary objective of this study was to determine whether Return To Launch Site (RTLS) abort at T seconds along the launch trajectory of the Personnel Launch System (PLS) is possible using optimal control theory. The secondary objective is to assess effects of bank angle constraint, lift coefficient constraint, free and fixed final boundary conditions, etc. of the vehicle. The PLS is a complementary system to the Space Shuttle.

Dutton, Kevin↗

International Launch Vehicle Selection for Interplanetary Travel

In developing a mission strategy for interplanetary travel, the first step is to consider launch capabilities which provide the basis for fundamental parameters of the mission. This investigation focuses on the numerous launch vehicles of various characteristics available and in development internationally with respect to upmass, launch site, payload shroud size, fuel type, cost, and launch frequency. This presentation will describe launch vehicles available and in development worldwide, then carefully detail a selection process for choosing appropriate vehicles for interplanetary missions focusing on international collaboration, risk management, and minimization of cost. The vehicles that fit the established criteria will be discussed in detail with emphasis on the specifications and limitations related to interplanetary travel. The final menu of options will include recommendations for overall mission design and strategy.

Ferrone, Kristine↗

NASA Space Technology Draft Roadmap Area 13: Ground and Launch Systems Processing

This slide presentation reviews the technology development roadmap for the area of ground and launch systems processing. The scope of this technology area includes: (1) Assembly, integration, and processing of the launch vehicle, spacecraft, and payload hardware (2) Supply chain management (3) Transportation of hardware to the launch site (4) Transportation to and operations at the launch pad (5) Launch processing infrastructure and its ability to support future operations (6) Range, personnel, and facility safety capabilities (7) Launch and landing weather (8) Environmental impact mitigations for ground and launch operations (9) Launch control center operations and infrastructure (10) Mission integration and planning (11) Mission training for both ground and flight crew personnel (12) Mission control center operations and infrastructure (13) Telemetry and command processing and archiving (14) Recovery operations for flight crews, flight hardware, and returned samples. This technology roadmap also identifies ground, launch and mission technologies that will: (1) Dramatically transform future space operations, with significant improvement in life-cycle costs (2) Improve the quality of life on earth, while exploring in co-existence with the environment (3) Increase reliability and mission availability using low/zero maintenance materials and systems, comprehensive capabilities to ascertain and forecast system health/configuration, data integration, and the use of advanced/expert software systems (4) Enhance methods to assess safety and mission risk posture, which would allow for timely and better decision making. Several key technologies are identified, with a couple of slides devoted to one of these technologies (i.e., corrosion detection and prevention). Development of these technologies can enhance life on earth and have a major impact on how we can access space, eventually making routine commercial space access and improve building and manufacturing, and weather forecasting for example for the effect of these process improvements on our daily lives.

Clements, Greg↗

Space nuclear safety from a user's viewpoint

The National Aeronautics and Space Administration (NASA) launched the Jet Propulsion Laboratory's (JPL) two Voyager spacecraft to Jupiter in 1977, each using three radioisotope thermoelectric generators (RTGs) supplied by the Department of Energy (DOE) for onboard electric power. In 1986 NASA will launch JPL's Galileo spacecraft to Jupiter equipped with two DOE supplied RTGs of an improved design. NASA and JPL are also responsible for obtaining a single RTG of this type from DOE and supplying it to the European Space Agency as part of its participation in the International Solar Polar Mission. As a result of these missions, JPL has been deeply involved in space nuclear safety as a user. This paper will give a brief review of the user contributions by JPL - and NASA in general - to the nuclear safety processes and relate them to the overall nuclear safety program necessary for the launch of an RTG. The two major safety areas requiring user support are the ground operations involving RTGs at the launch site and the failure modes and probabilities associated with launch accidents.

Campbell, R. W.↗

Investigation of Atmospheric Boundary-Layer Effects on Launch-Vehicle Ground Wind Loads

A launch vehicle ground-wind-loads program is underway at the NASA Langley Transonic Dynamics Tunnel. The objectives are to quantify key aerodynamic and structural characteristics that impact the occurrence of large wind-induced oscillations of a launch vehicle when exposed to ground winds prior to launch. Of particular interest is the dynamic response of a launch vehicle when a von Kármán vortex street forms in the wake of the vehicle resulting in quasiperiodic lift and drag forces. Vehicle response to these quasiperiodic forces can become quite large when the frequency of vortex shedding nears that of a lowly-damped structural mode thereby exciting a resonant response. Wind approaching the vehicle can be characterized by a varying speed with height and turbulence content. The combination of both the varying speed and turbulence content is referred to herein as the atmospheric boundary-layer. The importance of the atmospheric boundary-layer upon launch vehicle wind-induced oscillation response has long been questioned, and its effects are not well understood. Although there are several facilities around the world dedicated to replicating atmospheric boundary layers, the development of such a boundary layer in a wind tunnel capable of producing flight-representative Reynolds numbers for aeroelastically-scaled launch vehicle models has only recently been accomplished. The NASA Langley Transonic Dynamics Tunnel is capable of simulating flight-representative Reynolds numbers of launch vehicles on the pad and is uniquely capable of replicating many fluid-structure scaling parameters typical of aeroelastic tests. Recent test efforts successfully developed representative atmospheric boundary-layers for three launch sites in the Transonic Dynamics Tunnel, thereby allowing all known aerodynamic and fluid-structure coupling parameters to be simultaneously simulated for those sites. Dynamic aeroelastically-scaled models representative of typical large launch vehicles were constructed for testing. Aeroelastic scaling includes matching geometry, mode shapes, reduced frequencies, damping, running mass ratios, and running stiffness ratios. The models were tested in smooth uniform flow and then immersed in the atmospheric boundary-layer for comparison of these effects. Dynamic data were acquired measuring unsteady pressure, acceleration, and base bending moment. It was discovered that peak dynamic loads resulting from resonant wind-induced oscillation response are similar when acquired in either smooth uniform flow or an atmospheric boundary-layer. This indicates that resonant lock-in events are minimally impacted by representative turbulence and/or wind profile. Alternately, nonresonant wind-induced oscillation response events are stronger when acquired in an atmospheric boundary-layer. This indicates that a lowly-damped structural response will increase when exposed to an increased magnitude of random excitation, which is consistent with historical comparisons. Loads created by the resonant response events were substantially stronger than those from the nonresonant response events. Therefore, if testing is done to simply identify worst-case conditions and load magnitude, then smooth uniform flow is likely an adequate test technique. However, if nonresonant response loads are of primary interest, then atmospheric boundary-layer simulation is required.

Thomas G Ivanco↗

Electrochemical Impedance Spectroscopy of Alloys in a Simulated Space Shuttle Launch Environment

Type 304L stainless steel (304L SS) tubing is currently used in various supply lines that service the Orbiter at NASA's John F. Kennedy Space Center Launch Pads in Florida (USA). The atmosphere at the Space Shuffle launch site is very corrosive due to a combination of factors, such as the proximity of the Atlantic Ocean and the concentrated hydrochloric acid produced by the fuel combustion reaction in the solid rocket boosters. The acidic chloride environment is aggressive to most metals and causes severe pitting in many of the common stainless steel alloys such as 304L SS. Stainless steel tubing is susceptible to pitting corrosion that can cause cracking and rupture of both high-pressure gas and fluid systems. Outages in the systems where failures occur can impact the normal operation of the shuttle and launch schedules. The use of a more corrosion resistant tubing alloy for launch pad applications would greatly reduce the probability of failure, improve safety, lessen maintenance costs, and reduce downtime. A study which included ten alloys was undertaken to find a more corrosion resistant material to replace the existing 304L SS tubing. The study included atmospheric exposure at NASA's John F. Kennedy Space Center outdoor corrosion test site near the launch pads and electrochemical measurements in the laboratory which included DC techniques and electrochemical impedance spectroscopy (EIS). This paper presents the results from EIS measurements on three of the alloys: AL6XN (UN N08367), 254SMO (UNS S32l54), and 304L SS (UNS S30403). Type 304L SS was included in the study as a control. The alloys were tested in three electrolyte solutions which consisted of neutral 3.55% NaC1, 3.55% NaCl in O.1N HC1, and 3.55% NaCl in 1.ON HC1. The solutions were chosen to simulate environments that were expected to be less, similar, and more aggressive, respectively, than those present at the Space Shuttle launch pads. The results from the EIS measurements were analyzed to evaluate the corrosion susceptibility of the alloys and to predict the long-term corrosion performance of the subject materials. The results from the EIS measurements for the three alloys indicated that the higher-alloyed 254SMO and AL6XN exhibited a significantly improved resistance to corrosion than the 304L SS as the concentration of hydrochloric acid in the 3.55% NaC1 solution was increased. The polarization resistance values obtained from the EIS measurements were consistent with those from linear polarization measurements, and were indicative of the actual long-term corrosion performance of the alloys during a two-year atmospheric exposure study.

Calle, L. M.↗

Launch Summary for 1979

Spacecraft launching for 1979 are identified and listed under the categories of (1) sounding rockets, and (2) artificial Earth satellites and space probes. The sounding rockets section includes a listing of the experiments, index of launch sites and tables of the meanings and codes used in the launch listing.

Vostreys, R. W.↗

Ulysses mission design after Challenger

The delay of the Ulysses launch from May 1986 to October 1990, because of the Challenger disaster, has altered both the constraints under which the mission must be designed and the timing of several mission critical events. Safety and launch reliability concerns from the Shuttle have increased the effective launch window to durations greater than one hour. Fortuitously high declinations of the launch asymptote (DLA), of the order of the launch site latitude, ameliorate the impact of the new constraints on the launch window. Target overlays in the first hour of the launch window provide higher departure energies that improve mission performance and avoid a science schedule conflict at second opposition near the time of closest Jupiter approach. The mission design starts with the maximum earth departure energy that the upper stage can deliver within the launch constraints. The Jupiter arrival asymptotes are chosen from the optimal point of mission performance in the mission space defined in the Jupiter B-plane by contours mapped by the science and spacecraft constraints. More than half the orbital energy of the earth-to-Jupiter transfer orbit is lost in the Jupiter flyby, and the Jupiter gravitational assist rotates the orbit plane out of the ecliptic to an inclination of about 80 degrees.

Luthey, Joe L.↗

Pre-Launch Mission Operation Report: San Marco B

On or about April 23, 1967, the Italian Space Commission of the National Council of Research (I.S.C.) will launch the San Marco B satellite from the I.S.C. launch range located off the coast of Kenya, Africa. It is planned that the spacecraft will be placed into an equatorial orbit by the four-stage Scout vehicle, number S-153. The San Marco program is a joint NASA-I.S.C. effort being carried out in accordance with a Memorandum of Understanding dated 31 May 1962. Under this agreement the I .S.C. has established the equatorial launch site, has designed and fabricated the satellite, and will conduct the launch operation. The NASA has provided the Scout launch vehicle, training for I.S.C. personnel, technical consultation,and tracking and data acquisition for the operational satellite.

Source record↗

Radar Evaluation of Optical Cloud Constraints to Space Launch Operations

Weather constraints to launching space vehicles are designed to prevent loss of the vehicle or mission due to weather hazards (See, e.g., Ref 1). Constraints include Lightning Launch Commit Criteria (LLCC) designed to avoid natural and triggered lightning. The LLCC currently in use at most American launch sites including the Eastern Range and Kennedy Space Center require the Launch Weather Officer to determine the height of cloud bases and tops, the location of cloud edges, and cloud transparency. The preferred method of making these determinations is visual observation, but when that isn't possible due to darkness or obscured vision, it is permissible to use radar. This note examines the relationship between visual and radar observations in three ways: A theoretical consideration of the relationship between radar reflectivity and optical transparency. An observational study relating radar reflectivity to cloud edge determined from in-situ measurements of cloud particle concentrations that determine the visible cloud edge. An observational study relating standard radar products to anvil cloud transparency. It is shown that these three approaches yield results consistent with each other and with the radar threshold specified in Reference 2 for LLCC evaluation.

Merceret, Francis J.↗

The Launch Processing System for Space Shuttle.

In order to reduce costs and accelerate vehicle turnaround, a single automated system will be developed to support shuttle launch site operations, replacing a multiplicity of systems used in previous programs. The Launch Processing System will provide real-time control, data analysis, and information display for the checkout, servicing, launch, landing, and refurbishment of the launch vehicles, payloads, and all ground support systems. It will also provide real-time and historical data retrieval for management and sustaining engineering (test records and procedures, logistics, configuration control, scheduling, etc.).

Springer, D. A.↗

Final Environmental Impact Statement for National Aeronautics and Space Administration Office of Space Science: Sounding Rocket Program

The NASA OSS Sounding Rocket Program is responsible for the launch of approximately 80 science and applications payloads per year. These launches are for NASA programs and those of other U.S. government agencies private industry, universities, foreign countries, and international organizations. NASA launches occur or have occurred from 34 launch sites located throughout the world. Nine of these receive substantial use. Payloads launched by this program contribute in a variety of ways to the control and betterment of the environment (e.g., solar studies). Environmental effects caused by the research vehicles are limited in extent, duration, and intensity and are considered insignificant. There are no short-term alternatives to the current family of sounding rocket vehicles. The possibilities for changes in the family including new stage and sounding rocket developments, are continuously reviewed. Although measurements using high-altitude aircraft and balloons are possible at lower altitudes and using satellites at much higher altitudes, the specific region of the atmosphere between about 40 and 200 km cannot be reached in any other way. Sounding rockets can be launched simultaneously from several points and can be used in response to time-related phenomena.

Source record↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Spaceport Performance Measures

Spaceports have traditionally been characterized by performance measures associated with their site characteristics. Measures such as "Latitude" (proximity to the equator), "Azimuth" (range of available launch azimuths) and "Weather" (days of favorable weather) are commonly used to characterize a particular spaceport. However, other spaceport performance measures may now be of greater value. These measures can provide insight into areas of operational differences between competing spaceports and identify areas for improving the performance of spaceports. This paper suggests Figures of Merit (FOMs) for spaceport "Capacity" (number of potential launch opportunities per year and / or potential mass' to low earth orbit (LEO) per year); "Throughput" (actual mass to orbit per year compared to capacity); "Productivity" (labor effort hours per unit mass to orbit); "Energy Efficiency" (joules expended at spaceport per unit mass to orbit); "Carbon Footprint" tons CO2 per unit mass to orbit). Additional FOMS are investigated with regards to those areas of special interest to commercial launch operators, such as "Assignment Schedule" (days required for a binding assignment of a launch site from the spaceport); "Approval Schedule" (days to complete a range safety assessment leading to an approval or disapproval of a launch vehicle); "Affordability" (cost for a spaceport to assess a new launch vehicle); "Launch Affordability" (fixed range costs per launch); "Reconfigure Time" (hours to reconfigure the range from one vehicle's launch ready configuration to another vehicle's configuration); "Turn,Around Time" (minimum range hours required between launches of an identical type launch vehicle). Available or notional data is analyzed for the KSC/CCAFS area and other spaceports. Observations regarding progress over the past few decades are made. Areas where improvement are needed or indicated are suggested.

Finger, G. Wayne↗

The Orbiting Carbon Observatory: NASA's First Dedicated Carbon Dioxide Mission

The Orbiting Carbon Observatory is scheduled for launch from Vandenberg Air Force Base in California in January 2009. This Earth System Science Pathfinder (ESSP) mission carries and points a single instrument that incorporates 3 high-resolution grating spectrometers designed to measure the absorption of reflected sunlight by near-infrared carbon dioxide (CO2) and molecular oxygen bands. These spectra will be analyzed to retrieve estimates of the column-averaged CO2 dry air mole fraction, X(sub CO2). Pre-flight qualification and calibration tests completed in early 2008 indicate that the instrument will provide high quality X(sub CO2) data. The instrument was integrated into the spacecraft, and the completed Observatory was qualified and tested during the spring and summer of 2008, in preparation for delivery to the launch site in the fall of this year. The Observatory will initially be launched into a 635 km altitude, near-polar orbit. The on-board propulsion system will then raise the orbit to 705 km and insert OCO into the Earth Observing System Afternoon Constellation (A-Train). The first routine science observations are expected about 45 days after launch. Calibrated spectral radiances will be archived starting about 6 months later. An exploratory X(sub CO2) product will be validated and then archived starting about 3 months after that.

Carbon Cycle↗

Profiling the SO2 Plume from Volcan Turrialba: Ticosonde Balloon Measurements Compared with OMI and OMPS Retrievals

The summit of Volcan Turrialba (elev. 3340 m) lies less than 50 km upstream in the prevailing easterlies from the Ticosonde balloon launch site at San Jose, Costa Rica, where ECC ozone sondes have been launched regularly since 2005. In 2006 we began to see telltale notches in the ozone profiles in the altitude range between 2 and 6 km. Given the proximity of Turrialba, it seemed likely that SO2 in the volcano's plume was interfering in the chemical reaction in the ECC ozone sonde used to detect ozone. In early 2010, fumarolic activity in the Turrialba crater increased strongly, and the profile notches in our soundings increased in frequency as well, consistent with this hypothesis. In February 2012 we tested a dual ECC sonde system, where an additional sonde is flown on the same payload using a selective SO2 filter. The difference of the measurements in the dual sonde is a direct measure of the amount of SO2 encountered. This first dual sonde passed through the plume, and the data indicated a tropospheric SO2 column of 1.4 DU, comparing favorably with a total column of 1.7 DU in the OMI 3-km linear fit (LF) product at the sonde profile location and at nearly the same time. We are now launching dual sondes on a regular basis with 18 launches in the first 12 months through July 2014; 11 of these have detectable SO2 signals. These soundings have great potential for validation of the Aura OMI and the Suomi-NPP OMPS retrievals of SO2. Here we present the sonde measurements and compare them with two satellite datasets: the Aura OMI Linear Fit (LF) product and the Suomi-NPP OMPS Principal Components Analysis (PCA) boundary layer product. The PCA algorithm reduces retrieval noise and artifacts by more accurately accounting for various interferences in SO2 retrievals such as O3 absorption and rotational Raman scattering. The comparisons with the in situ observations indicate a significant improvement of the PCA algorithm in capturing relatively weak volcanic SO2 signals.

sondes↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

Meteorological assessment of SRM exhaust products' environmental impact

The environmental impact of solid rocket motor (SRM) exhaust products discharged into the free air stream upon the launching of space vehicles that depend upon SRM boosters to obtain large thrust was assessed. The emission of Al2O3 to the troposphere from the SRMs in each Shuttle launch is considered. The Al2O3 appears as particles suitable for heterogeneous nucleation of hydrochloric acid which under frequently occurring atmospheric conditions may form a highly acidic rain capable of damaging property and crops and of impacting upon the health of human and animal populations. The cloud processes leading to the formation of acid rain and the concentration of the acid that then reaches the ground, and the atmospheric situations that lead to the production of cloud and rain at and near a launch site, and the prediction of weather conditions that may permit or prohibit a launch operation are studied.

Dingle, A. N.↗