Search NASA⌕ Search

SEARCH · Search NASA

Results for “LIBRATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Orbit Determination Issues for Libration Point Orbits

Libration point mission designers require knowledge of orbital accuracy for a variety of analyses including station keeping control strategies, transfer trajectory design, and formation and constellation control. Past publications have detailed orbit determination (OD) results from individual notation point missions. This paper collects both published and unpublished results from four previous notation point missions (ISEE-3, SOHO, ACE and MAP) supported by Goddard Space Flight Center's Guidance, Navigation & Control Center. The results of those missions are presented along with OD issues specific to each mission. All past missions have been limited to ground based tracking through NASA ground sites using standard marine and Doppler measurement types. Advanced technology is enabling other OD options including onboard navigation using onboard attitude sensors and the use of the Very Long Baseline Interferometry (VLBI) measurement Delta Differenced One-Way Range (DDOR). Both options potentially enable missions to reduce coherent dedicated tracking passes while maintaining orbital accuracy. With the increased projected loading of the DSN, missions must find alternatives to the standard OD scenario.

Beckman, Mark↗

Formation Flying Satellite Control Around the L2 Sun-Earth Libration Point

This paper discusses the development of a linear control algorithm for formations in the vicinity of the L2 sun-Earth libration point. The development of a simplified extended Kalman filter is included as well. Simulations are created for the analysis of the stationkeeping and various formation maneuvers of the Stellar Imager mission. The simulations provide tracking error, estimation error, and control effort results. For formation maneuvering, the formation spacecraft track to within 4 meters of their desired position and within 1.5 millimeters per second of their desired zero velocity. The filter, with few exceptions, keeps the estimation errors within their three-sigma values. Without noise, the controller performs extremely well, with the formation spacecraft tracking to within several micrometers. Each spacecraft uses around 1 to 2 grams of propellant per maneuver, depending on the circumstances.

Hamilton, Nicholas H.↗

Formations Near the Libration Points: Design Strategies Using Natural and Non-Natural Arcs

Space based observatory and interferometry missions, such as Terrestrial Planet Finder (TPF), Stellar Imager, and MAXIM, have sparked great interest in multi-spacecraft formation flight in the vicinity of the Sun-Earth/Moon (SEM) libration points. The initial phase of this research considered the formation keeping problem from the perspective of continuous control as applied to non-natural formations. In the present study, closer inspection of the flow, corresponding to the stable and center manifolds near the reference orbit, reveals some interesting natural relative motions as well as some discrete control strategies for deployment. A hybrid control strategy is also employed that combines both the natural formation dynamics with non-natural motions via input feedback linearization techniques.

Howell, K. C.↗

Analysis of Capture Trajectories to the Vicinity of Libration Points

Spacecraft capture trajectories to the periodic orbits of the L1 and L2 points in the restricted Hill three-body problem are studied. The specific focus is on transfer to these vicinities from interplanetary trajectories. This application is motivated by future proposals to place "Deep Space ports" at the Earth and Mars L1 or L2 points. These spaceports are considered as candidate gateways for interplanetary transfers in the future. We utilize stable manifolds for capture trajectories to periodic orbits around the libration points. As a result, the cost of capture into a periodic orbit is also reduced relative to direct capture into a parabolic orbit. The way of linking between interplanetary transfer trajectories and the stable manifold is also discussed.

Nakamiya, M.↗

Earth to Moon Transfer: Direct vs Via Libration Points (L1, L2)

For some three decades, the Apollo-style mission has served as a proven baseline technique for transporting flight crews to the Moon and back with expendable hardware. This approach provides an optimal design for expeditionary missions, emphasizing operational flexibility in terms of safely returning the crew in the event of a hardware failure. However, its application is limited essentially to low-latitude lunar sites, and it leaves much to be desired as a model for exploratory and evolutionary programs that employ reusable space-based hardware. This study compares the performance requirements for a lunar orbit rendezvous mission type with one using the cislunar libration point (L1) as a stopover and staging point for access to arbitrary sites on the lunar surface. For selected constraints and mission objectives, it contrasts the relative uniformity of performance cost when the L1 staging point is used with the wide variation of cost for the Apollo-style lunar orbit rendezvous.

Condon, Gerald L.↗

Stationkeeping of the First Earth-Moon Libration Orbiters: The ARTEMIS Mission

Libration point orbits near collinear locations are inherently unstable and must be controlled. For Acceleration Reconnection and Turbulence and Electrodynamics of the Moon's Interaction with the Sun (ARTEMIS) Earth-Moon Lissajous orbit operations, stationkeeping is challenging because of short time scales, large orbital eccentricity of the secondary, and solar gravitational and radiation pressure perturbations. ARTEMIS is the first NASA mission continuously controlled at both Earth-Moon L1 and L2 locations and uses a balance of optimization, spacecraft implementation and constraints, and multi-body dynamics. Stationkeeping results are compared to pre-mission research including mode directions.

Folta, David↗

Exploration Platform in the Earth-Moon Libration System Based on ISS

International Space Station (ISS) industry partners have been working for the past two years on concepts using ISS development methods and residual assets to support a broad range of exploration missions. These concepts have matured along with planning details for NASA's Space Launch System (SLS) and Multi-Purpose Crew Vehicle (MPCV) to allow serious consideration for a platform located in the Earth-Moon Libration (EML) system. This platform would provide a flexible basis for future exploration missions and would significantly reduce costs because it will enable re-use of expensive spacecraft and reduce the total number of launches needed to accomplish these missions. ISS provides a robust set of methods which can be used to test systems and capabilities needed for missions to the Moon, Mars, asteroids and other potential destinations. We will show how ISS can be used to reduce risk and improve operational flexibility for missions beyond low earth orbit through the development of a new Exploration Platform based in the EML system. The benefits of using the EML system as a gateway will be presented along with additional details of a lunar exploration mission concept. International cooperation is a critical enabler and ISS has already demonstrated successful management of a large multi-national technical endeavor. We will show how technology developed for ISS can be evolved and adapted to the new exploration challenge. New technology, such as electric propulsion and advanced life support systems can be tested and proven at ISS as part of an incremental development program. Finally, we will describe how the EML Platform could be built and deployed and how International access for crew and cargo could be provided.

Raftery, Michael↗

Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

OPERATIONS↗

Investigations of Spacecraft Orbits Around the L(2) Sun-Earth Libration Point

Space agencies are planning missions to the vicinity of the Sun-Earth L sub 2 point, some involving a distributed system of telescope spacecraft, configured in a plane about a hub. An improved understanding is developed of their relative motion. First, the telescope equations of motion are written relative to L sub 2 in the context of the classical circular restricted three-body problem, and expanded in terms of the distance from L sub 2. A basic examination is presented of the spacecraft configuration requirements and effects of small orbit insertion errors. Next, the telescope equations of motion relative to the hub are written and further expanded in terms of the hub-L sub 2 and hub-telescope distances. An analytical solution is developed and a halo telescope orbit investigated, with appropriate initial conditions. Then, the force model is extended to include perturbations to an accuracy of 10 to 20 m, east as additive contributions to the circular restricted problem. Perturbations include Earth's orbital eccentricity, lunar motion, solar radiation pressure, and small thrusting forces. Simulations are presented, along with solution sensitivity to errors in hub position knowledge.

RELATIVE MOTION↗

End of Life Disposal for Three Libration Point Missions through Manipulation of the Jacobi Constant and Zero Velocity Curves

The aim of this investigation is to determine the feasibility of mission disposal by inserting the spacecraft into a heliocentric orbit along the unstable manifold and then manipulating the Jacobi constant to prevent the spacecraft from returning to the Earth-Moon system. This investigation focuses around L1 orbits representative of ACE, WIND, and SOHO. It will model the impulsive delta-V necessary to close the zero velocity curves after escape through the L1 gateway in the circular restricted three body model and also include full ephemeris force models and higher fidelity finite maneuver models for the three spacecraft.

Wind↗

End of Life Disposal for Three Libration Point Missions through Manipulation of the Jacobi Constant and Zero Velocity Curves

Flight Dynamics Facility (FDF) located at NASA Goddard Space Flight Center (GSFC) provides the flight dynamics expertise for three Sun-Earth Moon L1 missions. Advanced Composition Explorer (ACE) launched August 1997 Solar and Heliospheric Observatory (SOHO) launched December 1995 Global Geospace Science WIND satellite launched November 1994 entered Lagrange point orbit in 2004.

Ace↗

Mitigating the Impact of Momentum Unloads on Station Keeping Around Libration Point Orbits

The Space Weather Follow On (SWFO) observatory will observe the Sun from L1, collecting solar wind data and coronal imagery, while providing early warning for space weather events. SWFO is a ride-share mission on SpaceX Falcon9 that is carrying IMAP. The spacecraft will be operated by NOAA and is expected to launch in February 2025. In order to meet NOAA’s operational requirements SWFO must maintain a Sun-Earth-Vehicle (SEV) angle between 4 and 13 degrees for at least 5 years. This constraint drives the size of the Lissajous orbit. SWFO is required keep a Sun pointing attitude in order to perform the Sun observations. Frequent Momentum Unloads are required to desaturate its reaction wheals. Station-keeping maneuvers are required to stay in orbit around L1, they are planned to be performed every 30 days.

Libration Point Orbits↗