Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Bayesian Seismoacoustic Source Location: Acoustic Approach

Seismic waves and infrasound are key technologies in the International Monitoring System (IMS) to monitor explosive events in the solid Earth and atmosphere. Energetic man-made or natural events (e.g., chemical/nuclear explosions, volcanic eruptions, and earthquakes) near the Earth’s surface produce both ground motion and atmospheric pressure disturbances which propagate as seismic waves and infrasound, respectively. Seismic waves have been generally used to detect and identify underground and near-surface events (Myers, et. al., 2007), and infrasound are sensitive to events near the surface or in the atmosphere (Modrak et. al., 2010). Due to their different sensitivities to events, they can complement to each other to improve the event detection and discrimination. The framework of joint seismoacoustic event location has recently reviewed by theoretical research (Koch and Arrowsmith, 2019). Although the early applications showed promising results to improve the accuracy of event location, their application were still limited to a small set of events selected to prove the concepts, and practical capability of the method for operational purpose is not fully evaluated with data. Our final goal is to apply the method of seismoacoustic event location to a larger set of events and evaluate its applicability for operational event location in practice. To that end, we focus on developing and verifying acoustic source location method in this study.

58 GEOSCIENCES↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

The Integration and Mapping of an Open-Source National Well Resource to Inform Geologic Carbon Storage Site Selection and Risk Prevention: The CO2-Locate Database

Geologic carbon storage (GCS) offers a way to capture and permanently store CO₂ from fossil fuel operations in underground geologic structures, aiding in the transition to a carbon-neutral energy economy. However, CO₂ injection sites can experience gas leakage through existing wells that penetrate storage reservoirs, making knowledge of well locations and characteristics crucial for permitting, infrastructure reusability, and risk assessment in GCS. Currently, public wellbore data from state, federal, and tribal entities are inconsistent and fragmented, with gaps and redundancies. To address this, the National Energy Technology Laboratory (NETL) developed CO2-Locate, an open-source, geospatial database and online application. CO2-Locate integrates over 50 data sources from federal, state, and tribal entities, creating a standardized national well database. Funded by the Bipartisan Infrastructure Law, the database is publicly available through the Energy Data eXchange (EDX) and viewable via the CO2-Locate web mapping application. This tool allows users to query, filter, and visualize well data to support GCS planning, permitting, and risk assessments. This presentation covers the methods used to create CO2-Locate, including data acquisition, processing, attribute mapping, and integration, much of which is automated for future updates. The web mapping application and its role in GCS site selection will also be discussed.

Tetteh, Daniel A.↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Spatial, Spectral, & Temporal Optical Reflectance System for Precision Occupancy & Location Sensing to Improve Building Energy Efficiency

Buildings consume approximately 35% of the electricity used in the U.S. and building owners can significantly reduce this energy use by providing services like heating, electrical power and lighting only when people are present. The ARPAe funded program titled “INTEGRATED SPATIAL, SPECTRAL, & TEMPORAL OPTICAL REFLECTANCE SYSTEM FOR PRECISION OCCUPANCY & LOCATION SENSING TO IMPROVE BUILDING ENERGY EFFICIENCY” demonstrates how a low cost sensor technology developed for measuring distances can be used to count and locate occupants with a high degree of precision with a very low error rates. This platform tells a building control system where occupants are located (but not who they are) so that energy consuming services can be provided only when the services are needed by building occupants. The original proof of concept involved using low cost, commercially available time-of-flight (TOF) sensors that measure distance, but the performance of these existing sensors was lacking, as they could not operate properly in the presence of sunlight, which blinded the simple TOF sensors and limited their utility in buildings. This project proposed a powerful new class of TOF sensors that used state-of-the-art integrated circuit (IC) fabrication processes that combined advanced photonics with conventional silicon chip circuitry for improved sensor performance. An equally important part of this project was to find ways to maximize occupant count and location accuracy while using the fewest number of sensors possible, in order to keep costs low. By using building blueprints to create digital twins of commercial building spaces, the team developed new algorithms to maximize occupant count and tracking accuracy by properly locating the minimum number of sensors at just the right spots in the building. This capability not only minimizes system costs but also simplified sensor installation and system commissioning. Our simulations of our sensor networks for a range of commercial floorplan designs demonstrated that our installed cost target of $0.08/sqft was attainable, though not fully demonstrated during the project. Finally, we noted that the TOF sensor concept could provide a valuable role in health and eldercare by tracking patients without the need for worn sensors and would be useful for fall detection and other patient safety metrics, including tracking healthcare/patient interactions. We feel that, when fully developed, this new class of sophisticated TOF sensors and support software will be a powerful new approach to improving building energy efficiency based on occupant centric control platforms and will also open new levels of patient safety in healthcare operations. To realize this potential, the team formed the Troy Sensor Company LLC to oversee licensing of the programs patents and continue to seek commercialization of this program’s activity sensing technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Interaction Location in SuperCDMS Detectors

The Super Cryogenic Dark Matter Search (SuperCDMS) experiment uses silicon and germanium particle detectors operated at temperatures of ∼ 30 mK to search for Weakly Interacting Massive Particles (WIMPs), which are candidate dark matter particles that interact weakly with nuclei in the detectors. In operating these detectors, it is required not only to measure the energy of the interaction between the WIMP and the nuclei, but also to reconstruct where the interaction occurred, as the location can be used to separate background interactions from signal and to correct for variations with the location of the energy response. In this project, we, as a team from the University of Minnesota, aim to address the problem of accurately reconstructing the locations of interactions in the SuperCDMS detectors using machine learning methods. The dataset we provided here includes interactions at thirteen different locations from test data taken at the University of Minnesota. For each interaction, a set of parameters was extracted from the signals from each of the five sensors. These parameters represent information known to be sensitive to interaction location, including the relative timing between pulses in different channels, and features like the pulse shape. The relative amplitudes of the pulses are also relevant but due to instabilities in amplification during the test, this data is not included. The parameters included for each interaction are described in our project document. For more details, feel free to check our Github page: https://fair-umn.github.io/FAIR-UMN-CDMS/

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Location-allocation and public transit: An update on UCL student teacher placements

Location-allocation is a key application of GIS, with many varied applications. We present further development of a location-allocation tool for a real-world case study with UCL using public transport. The location of UCL in Greater London (UK) means that the inclusion of public transport is vital for this case study. The location-allocation is implemented as a capacitated p-median location-allocation model, using spopt, a library in the Python Spatial Analysis Library (PySAL) ecosystem. The initial results of this work are promising, with calculation times reduced by up to 60%, and the majority of students allocated shorter journey times, with further testing ongoing.

Bearman, Nick [University College London (UCL), UK↗

SINGLE-SHELL TANKS LEAK INTEGRITY ELEMENTS/SX FARM LEAK CAUSES AND LOCATIONS - 12127

Washington River Protection Solutions, LLC (WRPS) developed an enhanced single-shell tank (SST) integrity project in 2009. An expert panel on SST integrity was created to provide recommendations supporting the development of the project. One primary recommendation was to expand the leak assessment reports (substitute report or LD-1) to include leak causes and locations. The recommendation has been included in the M-045-9IF Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) as one of four targets relating to SST leak integrity. The 241-SX Farm (SX Farm) tanks with leak losses were addressed on an individual tank basis as part of LD-1. Currently, 8 out of 23 SSTs that have been reported to having a liner leak are located in SX Farm. This percentage was the highest compared to other tank farms which is why SX Farm was analyzed first. The SX Farm is comprised of fifteen SSTs built 1953-1954. The tanks are arranged in rows of three tanks each, forming a cascade. Each of the SX Farm tanks has a nominal I-million-gal storage capacity. Of the fifteen tanks in SX Farm, an assessment reported leak losses for the following tanks: 241-SX-107, 241-SX-108, 241-SX-109, 241-SX-111, 241-SX-112, 241-SX-113, 241-SX-114 and 241-SX-115. The method used to identify leak location consisted of reviewing in-tank and ex-tank leak detection information. This provided the basic data identifying where and when the first leaks were detected. In-tank leak detection consisted of liquid level measurement that can be augmented with photographs which can provide an indication of the vertical leak location on the sidewall. Ex-tank leak detection for the leaking tanks consisted of soil radiation data from laterals and drywells near the tank. The in-tank and ex-tank leak detection can provide an indication of the possible leak location radially around and under the tank. Potential leak causes were determined using in-tank and ex-tank information that is not directly related to leak detection. In-tank parameters can include temperature of the supernatant and sludge, types of waste, and chemical determination by either transfer or sample analysis. Ex-tank information can be assembled from many sources including design media, construction conditions, technical specifications, and other sources. Five conditions may have contributed to SX Farm tank liner failure including: tank design, thermal shock, chemistry-corrosion, liner behavior (bulging), and construction temperature. Tank design did not apparently change from tank to tank for the SX Farm tanks; however, there could be many unknown variables present in the quality of materials and quality of construction. Several significant SX Farm tank design changes occurred from previous successful tank farm designs. Tank construction occurred in winter under cold conditions which could have affected the ductile to brittle transition temperature of the tanks. The SX Farm tanks received high temperature boiling waste from REDOX which challenged the tank design with rapid heat up and high temperatures. All eight of the leaking SX Farm tanks had relatively high rate of temperature rise. Supernatant removal with subsequent nitrate leaching was conducted in all but three of the eight leaking tanks prior to leaks being detected. It is possible that no one characteristic of the SX Farm tanks could in isolation from the others have resulted in failure. However, the application of so many stressors - heat up rate, high temperature, loss of corrosion protection, and tank design - working jointly or serially resulted in their failure. Thermal shock coupled with the tank design, construction conditions, and nitrate leaching seem to be the overriding factors that can lead to tank liner failure. The distinction between leaking and sound SX Farm tanks seems to center on the waste types, thermal conditions, and nitrate leaching.

54 ENVIRONMENTAL SCIENCES↗

Device and method for the location and identification of a radiation source

A handheld device for the location and identification of a radiation source, including: a radiation transparent housing; a radiation locator device disposed within the radiation transparent housing operable for determining the location of the radiation source, wherein the radiation locator device includes a plurality of gamma detection crystals arranged in a geometric pattern and separated by a gamma shielding material, a plurality of detectors coupled to the plurality of gamma detection crystals, and a processor module coupled to the plurality of detectors; one or more of a neutron detection crystal and a gamma spectroscopy crystal disposed within the radiation transparent housing adjacent to the radiation locator device; and one or more detectors coupled to the one or more of the neutron detection crystal and the gamma spectroscopy crystal and the processor module; wherein the one or more of the neutron detection crystal and the gamma spectroscopy crystal, the one or more detectors, and the processor module are collectively operable for identifying the radiation source.

Vencelj, Matjaz↗

Power system disturbance location determination based on rate of change of frequency

A method for determining a location of a disturbance in a power system is provided. The method includes receiving data from a plurality of sensors distributed across the power system; determining, with one or more processors, for each sensor, an extremum of the data corresponding to the sensor; interpolating, with the one or more processors, the extrema; and presenting, on one or more display units, a location corresponding to a global maximum of the interpolated extrema as the location of the disturbance. The method may further include, if a difference between the largest extremum and each of remaining extremum is greater than a predetermined threshold, skipping the interpolating step and the presenting step, and presenting a location of the sensor corresponding to the largest extremum as the location of the disturbance.

You, Shutang↗

Detection, monitoring, and determination of location of changes in metallic structures using multimode acoustic signals

Methods for detection, monitoring, and determination of location of changes in rigid structures with arbitrarily complex geometries are described. Implementations include locating acoustic transducers that generate and receive acoustic signals at multiple locations along a surface of the rigid structure, wherein longitudinal spacing between the transducer locations define measurement zones. Acoustic signals with chosen amplitude-time-frequency characteristics excite multiple vibration modes in the structure within each zone. Small mechanical changes in the inspection zones lead to scattering and attenuation of broadband acoustic signals, which are detectable as changes in received signal characteristics as part of a through-transmission technique. Additional use of short, narrowband pulse acoustic signals as part of a pulse-echo technique allows determination of the relative location of the mechanical change within each zone based on the differential delay profiles.

42 ENGINEERING↗

A Commercial Building Plug Load Management System that Uses Internet of Things Technology to Automatically Identify Plugged-In Devices and Their Locations

Plug and process loads (PPLs) account for a large portion of U.S. commercial building energy use. There is a huge potential to reduce whole building consumption by targeting PPLs for energy savings measures or implementing some form of plug load management (PLM). Despite this potential, there has yet to be a widely adopted commercial PLM technology. This paper describes the Automatic Type and Location Identification System (ATLIS), a PLM system framework with automatic and dynamic load detection (ADLD). ADLD gives PLM systems the ability to automatically identify devices as they are plugged into the outlets of a building. The ATLIS framework takes advantage of smart, connected devices to identify device locations in a building, meter and control their power, and communicate this information to a central database. ATLIS includes five primary capabilities: location identification, communication, control, energy metering, and data storage. A laboratory proof of concept (PoC) demonstrated all but the energy metering capability, and these capabilities were validated using a series of system tests. The PoC was able to identify when a device was plugged into an outlet and the location of the device in the building. When a device was moved, the PoC's dashboard and database were automatically updated with the new location. The PoC implemented controls to devices from the system dashboard so that devices maintained correct schedules regardless of where they were plugged in within the building. ATLIS's primary technology application is improved PLM, but other applications include asset management, energy audits, and interoperability for grid-interactive efficient buildings. An ATLIS-based system could also be used to direct power to critical devices, such as ventilators, during a brownout or blackout. Such a framework is an opportunity to make PLM more widespread and reduce the amount of energy consumed by PPLs in current and future commercial buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Single-Shell Tanks Leak Integrity Elements/ SX Farm Leak Causes and Locations - 12127

Washington River Protection Solutions, LLC (WRPS) developed an enhanced single-shell tank (SST) integrity project in 2009. An expert panel on SST integrity was created to provide recommendations supporting the development of the project. One primary recommendation was to expand the leak assessment reports (substitute report or LD-1) to include leak causes and locations. The recommendation has been included in the M-045-91F Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) as one of four targets relating to SST leak integrity. The 241-SX Farm (SX Farm) tanks with leak losses were addressed on an individual tank basis as part of LD-1. Currently, 8 out of 23 SSTs that have been reported to having a liner leak are located in SX Farm. This percentage was the highest compared to other tank farms which is why SX Farm was analyzed first. The SX Farm is comprised of fifteen SSTs built 1953-1954. The tanks are arranged in rows of three tanks each, forming a cascade. Each of the SX Farm tanks has a nominal 1-million-gal storage capacity. Of the fifteen tanks in SX Farm, an assessment reported leak losses for the following tanks: 241-SX-107, 241-SX-108, 241-SX-109, 241-SX- 111, 241-SX-112, 241-SX-113, 241-SX-114 and 241-SX-115. The method used to identify leak location consisted of reviewing in-tank and ex-tank leak detection information. This provided the basic data identifying where and when the first leaks were detected. In-tank leak detection consisted of liquid level measurement that can be augmented with photographs which can provide an indication of the vertical leak location on the sidewall. Ex-tank leak detection for the leaking tanks consisted of soil radiation data from laterals and dry-wells near the tank. The in-tank and ex-tank leak detection can provide an indication of the possible leak location radially around and under the tank. Potential leak causes were determined using in-tank and ex-tank information that is not directly related to leak detection. In-tank parameters can include temperature of the supernatant and sludge, types of waste, and chemical determination by either transfer or sample analysis. Ex-tank information can be assembled from many sources including design media, construction conditions, technical specifications, and other sources. Five conditions may have contributed to SX Farm tank liner failure including: tank design, thermal shock, chemistry-corrosion, liner behavior (bulging), and construction temperature. Tank design did not apparently change from tank to tank for the SX Farm tanks; however, there could be many unknown variables present in the quality of materials and quality of construction. Several significant SX Farm tank design changes occurred from previous successful tank farm designs. Tank construction occurred in winter under cold conditions which could have affected the ductile to brittle transition temperature of the tanks. The SX Farm tanks received high temperature boiling waste from REDOX which challenged the tank design with rapid heat up and high temperatures. All eight of the leaking SX Farm tanks had relatively high rate of temperature rise. Supernatant removal with subsequent nitrate leaching was conducted in all but three of the eight leaking tanks prior to leaks being detected. It is possible that no one characteristic of the SX Farm tanks could in isolation from the others have resulted in failure. However, the application of so many stressors - heat up rate, high temperature, loss of corrosion protection, and tank design working jointly or serially resulted in their failure. Thermal shock coupled with the tank design, construction conditions, and nitrate leaching seem to be the overriding factors that can lead to tank liner failure. The distinction between leaking and sound SX Farm tanks seems to center on the waste types, thermal conditions, and nitrate leaching. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford single-shell tanks leak causes and locations - 15509

Historically 67 assumed and known leaking tanks in the single-shell tank (SST) system were identified at the Hanford Site. The US DOE, Washington River Protection Solutions LLC., and the State of Washington, Department of Ecology identified 25 of the 67 tanks as likely having had liner leaks by a comprehensive review of current and historical data. The remaining tanks are those with potential leaks from sources other than liner failures such as overfilling the tanks or the failure of process lines connecting SSTs. The location of the leaks was determined, based largely on logging radiological data from dry wells installed around the tank and/or radiological data from laterals installed under select tanks. The dry wells and laterals provide the best indication of the vicinity of the leak location, but not necessarily the exact location of the leak. Twenty of the 25 liner leaks appear to have occurred at or near the bottom of the tanks. Many of the tanks appeared to have multiple leak locations. Leak locations could not be determined for all tanks with the available data. Three of the tanks showed apparent sidewall leaks. Potential causes for liner leaks that were evaluated included tank design features, tank construction conditions, waste temperature, tank waste chemistry conducive to different types of corrosion (uniform corrosion, nitrate induced stress corrosion cracking, pitting, crevice, and liquid-air interface corrosion), and bulges in the tank bottom. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Developing a Consistent Travel-Time Framework for Comparing Three-Dimensional Velocity Models for Seismic Location Accuracy

Abstract Location algorithms have historically relied on simple, one-dimensional (1D) velocity models for fast seismic event locations. 1D models are generally used as travel-time lookup tables, one for each seismic phase, with travel-times pre-calculated for event distance and depth. These travel-time lookup tables are extremely fast to use and this fast computational speed makes them the preferred type of velocity model for operational needs. Higher-dimensional (i.e., three-dimensional—3D) seismic velocity models are becoming readily available and provide more accurate event locations over 1D models. The computational requirements of these 3D models tend to make their operational use prohibitive. Additionally, comparing location accuracy for 3D seismic velocity models tends to be problematic, as each model is determined using different ray-tracing algorithms. Attempting to use a different algorithm than the one used to develop a model usually results in poor travel-time prediction. We demonstrate and test a framework to create first-P and first-S 3D travel-time correction surfaces using an open-source framework ( PCalc + GeoTess , https://www.sandia.gov/salsa3d/software/geotess ) that easily stores 3D travel-time and uncertainty data. This framework produces fast travel-time and uncertainty predictions and overcomes the ray-tracing algorithm hurdle because the lookup tables can be generated using the exact ray-tracing algorithm that is preferred for a model.

3D velocity models↗