Search NASA⌕ Search

SEARCH · Search NASA

Results for “LUNAR TRAJECTORY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The Lunar IceCube Mission Design: Construction of Feasible Transfer Trajectories with a Constrained Departure

Lunar IceCube, a 6U CubeSat, will prospect for water and other volatiles from a low-periapsis, highly inclined elliptical lunar orbit. Injected from Exploration Mission-1, a lunar gravity assisted multi-body transfer trajectory will capture into a lunar science orbit. The constrained departure asymptote and value of trans-lunar energy limit transfer trajectory types that re-encounter the Moon with the necessary energy and flight duration. Purdue University and Goddard Space Flight Center's Adaptive Trajectory Design tool and dynamical system research is applied to uncover cislunar spatial regions permitting viable transfer arcs. Numerically integrated transfer designs applying low-thrust and a design framework are described.

Cis-lunar↗

Synchronized Lunar Pole Impact Plume Sample Return Trajectory Design

The presented trajectory design enables two maneuverable spacecraft launched onto the same trans-lunar injection trajectory to coordinate a steep impact of a lunar pole and subsequent sample return of the ejecta plume to Earth. To demonstrate this concept, the impactor is assumed to use the LCROSS missions trajectory and spacecraft architecture, thus the permanently-shadowed Cabeus crater on the lunar south pole is assumed as the impact site. The sample-return spacecraft is assumed to be a CubeSat that requires a complimentary trajectory design that avoids lunar impact after passing through the ejecta plume to enable sample-return to Earth via atmospheric entry.

impact plume↗

Double lunar swingby and Lissajous trajectory design for the WIND mission

Two alternative mission profiles are presented for the WIND mission whose baseline design includes two years in a double lunar swingby (DLS) orbit followed by one year in a Lissajous orbit about the sun-earth L1 libration point. The first alternative uses a half-month high-inclination transfer orbit between two lunar gravity assists to change the initial sunward DLS orbit to a DLS orbit in the geomagnetic tail region. The second alternative uses a direct insertion from launch into a large-amplitude Lissajous orbit followed by a sunward DLS orbit.

Sharer, P. J.↗

Lunar Orbiter II - Photographic Mission Summary

Lunar Orbiter II photography of landing sites, and spacecraft systems performance. The second of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 23:21 GMT on November 6, 1966. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena spacecraft combination was maneuvered into a 100-nautical-mile-altitude Earth orbit by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver 1 and engine-bum period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.

LUNAR ORBITER↗

Trajectory design for a lunar mapping and near-Earth-asteroid flyby mission

In August, 1994, the unusual asteroid (1620) Geographos will pass very close to the Earth. This provides one of the best opportunities for a low-cost asteroid flyby mission that can be achieved with the help of a gravity assist from the Moon during the years 1994 and 1995. A Geographos flyby mission, including a lunar orbiting phase, was recommended to the Startegic Defense Initiative (SDI) Office when they were searching for ideas for a deep-space mission to test small imaging systems and other lightweight technologies. The goals for this mission, called Clementine, were defined to consist of a comprehensive lunar mapping phase before leaving the Earth-Moon system to encounter Geographos. This paper describes how the authors calculated a trajectory that met the mission goals within a reasonable total Delta-V budget. The paper also describes some refinements of the initially computed trajectory and alternative trajectories were investigated. The paper concludes with a list of trajectories to fly by other near-Earth asteroids during the two years following the Geographos opportunity. Some of these could be used if the Geographos schedule can not be met. If the 140 deg phase angle of the Geographos encounter turns out to be too risky, a flyby of (2120) Tantalus in January, 1995, has a much more favorable approach illumination. Tantalus apparently can be reached from the same lunar orbit needed to get to Geographos. However, both the flyby speed and distance from the Earth are much larger for Tantalus than for Geographos.

Dunham, David W.↗

Autonomous Navigation of a Lunar Relay Using GNSS and Other Measurements

Many of the highest priority destinations at the Moon lack a continuous view of Earth, such as the lunar poles or lunar far side. Exploration of these sites will require spacecraft in cislunar space to relay communications and provide position, navigation, and timing (PNT) services. Accurate knowledge of relay position, velocity, and time is essential to these services. This paper describes a concept for a PNT Instrument being developed for the Lunar Communications Relay and Navigation Systems (LCRNS) Project. The instrument is intended as a payload that would enable autonomous, on-board, real-time navigation and timing using Global Navigation Satellite System (GNSS), optical navigation, and one-way measurements from Earth-based ground stations. Hardware-in-the-loop simulations using flight software are used to realistically characterize performance on hardware platforms with a path to flight. These results provide preliminary validation of the proposed PNT Instrument, demonstrate the benefits of augmenting GNSS with other measurements, and serve as an insightful reference for the design of future lunar missions, including those that will operate within the LunaNet framework of standards. This instrument concept relies on several technologies developed at NASA Goddard Space Flight Center (GSFC). For GNSS observables, the instrument relies on the high-altitude NavCube 3 mini (NC3m) GNSS receiver specifically designed for cislunar applications. The autoNGC system, which consists of flight software and a hardware platform, is responsible for fusing the observables using its extended Kalman filter, the Goddard Enhanced Onboard Navigation System (GEONS). Optical navigation observables are processed within autoNGC (“autonomous Navigation, Guidance, and Control”) using the Goddard Image Analysis & Navigation Tool (GIANT) which is also responsible for simulating high-fidelity images for test and analysis. In addition to describing the PNT Instrument and its components, the paper will present predicted performance based on simulation results. As a baseline, it will present GNSS-only hardware-in-the loop results using a NC3m test unit to process Spirent-simulated GPS signals in a potential lunar relay trajectory: a 12-hour elliptical frozen lunar orbit (ELFO). GEONS then processes the GPS pseudorange and time differenced carrier phase measurements to estimate and propagate the relay state (position, velocity, and time). These results extend previously published work that showed preliminary ELFO performance. Previous work has shown the importance of other measurement types, so additional simulations are performed which augment GNSS with ground station observables and several methods of optical navigation, including celestial navigation, limb-finding (e.g., observations of the lunar horizon), and terrain relative navigation (TRN). TRN involves correlating simulated predicted images of the lunar surface with actual imagery; misalignments of landmarks identified in each image are translated into relay state updates. TRN is valuable as a measurement of the relay’s state relative to the Moon, especially during GNSS outages or after maneuvers. One-way Pseudorange and Doppler measurements from Earth-based ground stations are also simulated. The full set of observables is processed using autoNGC. These simulations make use of autoNGC and NC3m test units, a lab atomic clock, and a pulse-per-second (PPS) generation and distribution system. This combination of subsystems, and the hardware platforms used in this analysis, represents a PNT Instrument that could be flown on a lunar relay. Results from the hardware-in-the-loop simulations presented in this paper provide a preliminary assessment of the achievable navigation performance of this instrument concept. PNT Instrument performance is compared to the GPS-only performance, and a discussion is provided on the apparent merits and challenges of each measurement type.

Ben Ashman↗

CEV Trajectory Design Considerations for Lunar Missions

The Crew Exploration Vehicle (CEV) translational maneuver Delta-V budget must support both the successful completion of a nominal lunar mission and an "anytime" emergency crew return with the potential for much more demanding orbital maneuvers. This translational Delta-V budget accounts for Earth-based LEO rendezvous with the lunar surface access module (LSAM)/Earth departure stage (EDS) stack, orbit maintenance during the lunar surface stay, an on-orbit plane change to align the CEV orbit for an in-plane LSAM ascent, and the Moon-to-Earth trans-Earth injection (TEI) maneuver sequence as well as post-TEI TCMs. Additionally, the CEV will have to execute TEI maneuver sequences while observing Earth atmospheric entry interface objectives for lunar high-latitude to equatorial sortie missions as well as near-polar sortie and long duration missions. The combination of these objectives places a premium on appropriately designed trajectories both to and from the Moon to accurately size the translational V and associated propellant mass in the CEV reference configuration and to demonstrate the feasibility of anytime Earth return for all lunar missions. This report examines the design of the primary CEV translational maneuvers (or maneuver sequences) including associated mission design philosophy, associated assumptions, and methodology for lunar sortie missions with up to a 7-day surface stay and with global lunar landing site access as well as for long duration (outpost) missions with up to a 210-day surface stay at or near the polar regions. The analyses presented in this report supports the Constellation Program and CEV project requirement for nominal and anytime abort (early return) by providing for minimum wedge angles, lunar orbit maintenance maneuvers, phasing orbit inclination changes, and lunar departure maneuvers for a CEV supporting an LSAM launch and subsequent CEV TEI to Earth return, anytime during the lunar surface stay.

Condon, Gerald L.↗

Numerical analysis of the asymptotic two-point boundary value solution for N-body trajectories.

Previously published asymptotic solutions for lunar and interplanetary trajectories have been modified and combined to formulate a general analytical boundary value solution applicable to a broad class of trajectory problems. In addition, the earlier first-order solutions have been extended to second-order to determine if improved accuracy is possible. Comparisons between the asymptotic solution and numerical integration for several lunar and interplanetary trajectories show that the asymptotic solution is generally quite accurate. Also, since no iterations are required, a solution to the boundary value problem is obtained in a fraction of the time required for numerically integrated solutions.

Lancaster, J. E.↗

Postflight Evaluation of Atlas-Centaur AC-6 (Launched August 11, 1965)

The sixth Atlas Centaur vehicle (AC-6) was successfully launched from the Eastern T e s t Range, Complex 36B, on August 11, 1965, at 0931:04.430 EST. A 2084-pound dynamic model of the Surveyor payload was placed in a simulated lunar transfer trajectory. Vehicle systems operated satisfactorily and all the flight objectives were accomplished. Lift-off within 4 seconds of the window opening demonstrated the launch-on-time capability of the vehicle were accurately compensated for by the Centaur guidance system. the Surveyor model into a near-perfect lunar transfer trajectory would have resulted in an impact of the moon without a midcourse correction. To hit the precise target area on the lunar surface, the required correction would have been 4.25 meters per second, which is well within the spacecraft capability. Normal thrust and impulse levels were obtained with both the A t l a s and Centaur propulsion systems. However, a sizeable thrust overshoot on startup of the Centaur engines has not been resolved. A propellant-utilization system used for the first time on the Centaur, accurately controlled the fuel and oxidant consumption. The turnaround and retrothrust maneuver were performed without incident. Relatively high longitudinal modal excitations and lateral payload excitations were obtained at lift-off; these high perturbations are believed t o be related t o the launcher holddown arms. Nominal temperatures were recorded for both the external vehicle skin and the payload compartment; however, abnormally low temperatures were measured in the forward equipment area, which may have resulted from leakage of cold helium purge gas. All vehicle electrical systems performed satisfactorily; the only difficulty with the RF systems was obtained with the C-band transponder. of the vehicle instrumentation yielded valid data. The AC-6 vehicle was constructed with several new lightweight designs including the forward bulkhead, thrust barrel, interstage adapter and tank skin thickness reduction from 0.016 t o 0.014 inch. No deficiencies were observed in any of these new structural elements.

Source record↗

Halo-orbit and lunar-swingby missions of the 1990's

A significant number of spacecraft are planning to use halo orbits and lunar-swingby trajectories in the next decade. Four spacecraft will be placed into halo orbits around the earth's sunward libration point, while two others will be stationed near the sun-earth L2 libration point in the distant geomagnetic tail. Six spacecraft, including two of the aforementioned halo orbiters, will make use of lunar-swingby maneuvers to fulfill their mission objectives. Thus, a total of ten spacecraft, five from the Soviet Union, two from Japan, two from the United States, and one from the European Space Agency, will employ halo orbits and/or lunar-swingby trajectories in the 1990's. Pertinent facts are presented for each of these missions.

Farquhar, Robert W.↗

Velocity Requirements for Abort From the Boost Trajectory of a Manned Lunar Mission

An investigation is made of the abort velocity requirements associated with failure of a propulsion system for a manned lunar mission. Two cases are considered: abort at less than satellite speed, which results in maximum decelerations in the following entry, and abort at greater than satellite speed with immediate return to earth. The velocity requirements associated with the latter problem are found to be substantial (several thousand feet per second) and are found to be even more severe if boost trajectories which lead to burnout at high altitudes or large flight-path angles are used. The velocity requirements associated with abort at less than satellite speed are found to be less severe than those for abort at greater than satellite speed except for nonlifting vehicles. It is found that abort rockets sufficient for abort at greater than satellite speed can be used to reduce maximum decelerations in entries following an abort at lower speeds. This reduction is accomplished by use of the abort rockets to decrease entry angle immediately prior to entry into the atmosphere.

Slye, Robert E.↗