Search NASA⌕ Search

SEARCH · Search NASA

Results for “Large missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Greatly enhanced deep space mission data return using verv large DSN arrays

The purposes of the Array System are: To fulfill the mission needs for higher data rates in the post-2010 era - Reduce the cost per data bit by two orders of magnitude. Specific Goal: Achieve a factor of 10 increase in DSN reception capability per decade from 2012 through 2027 (an average of 1 dB per year).

array↗

Possible LISA Technology Applications for Other Missions

The Laser Interferometer Space Antenna (LISA) has been selected as the third large class mission launch opportunity of the Cosmic Visions Program by the European Space Agency (ESA). LISA science will explore a rich spectrum of astrophysical gravitational-wave sources expected at frequencies between 0.0001 and 0.1 Hz and complement the work of other observatories and missions, both space and ground-based, electromagnetic and non-electromagnetic. Similarly, LISA technology may find applications for other missions. This paper will describe the capabilities of some of the key technologies and discuss possible contributions to other missions.

Livas, Jeffrey↗

Scouts: Using Numbers to Explore Mars In Situ

Mars is a planet with a complex geologic history involving fluvial, volcanic, aeolian, atmospheric, and impact processes. Many critical questions about Mars are still heatedly debated within the scientific community and we still have much to discover. The current Mars exploration philosophy involves remote observation of the planet from orbit and intensive in situ study of a few sites on the surface. Orbital data provides a global picture while in situ investigations provide detailed knowledge at a single location. Mars Scouts are proposed to provide access to multiple locations on Mars. They address the emerging program needs of exploring the diversity of the planet globally in ways that cannot be achieved from orbit. The goal of the Scout is to find a way to investigate many locations on the surface of Mars in an affordable and efficient manner. We have only visited three locations on the surface of Mars, which have very similar characteristics. Increased numbers allows more types of locations to be investigated. The hallmarks of Scouts are numbers and access. Thus the capability of a single Scout will be limited. The science return from a single Scout will be significantly less than from a large science lander or an orbiting spacecraft. Scouts rely on their numbers to collectively provide a substantial increase in our knowledge of Mars. Scouts potentially serve two purposes in the Mars exploration architecture. First, Scouts are a science exploration tool. They provide access to places on Mars we currently can't explore because program focus, surface roughness, elevation, or latitude that we know are scientifically interesting. Scouts can react to new discoveries and evolving ideas about Mars. They can be used to test theories which until proven would not warrant the investment of a large lander. Second, Scouts enable better large scale missions by providing ground truth of remote sensing data and allowing us to "know" sites in advance before sending large landers and sample return missions. This increases the probability of success for these expensive missions both from safety and science return stand-points.

Blaney, D. L.↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Shortly after JPL’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission launches, separates, and commences its cruise phase, two CubeSats will deploy from the launch vehicle’s upper stage and begin independent flight to Mars (Fig. 1). During InSight’s entry, descent, and landing (EDL) sequence, these twin Mars Cube One (MarCO) spacecraft will fly 3,500 km above the Martian surface, recording and relaying InSight UHF radio data to the Deep Space Network (DSN) on Earth1. MarCO is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration. Originally slated to launch and reach Mars in 2016, the InSight mission schedule subsequently slipped to 2018. During the original landing of InSight, Earth would not be in view, and no orbiter around Mars would have been in position to both receive UHF EDL data and simultaneously relay it back to Earth. It was from this obstacle that MarCO was conceived. Regardless of any changes to InSight’s 2018 EDL configuration geometry, MarCO is still expected to fly and serve in the same capacity as originally designed: the first CubeSat mission to Mars. CubeSats have historically been firmly in the domain of universities and small companies. As first conceived, they served as a platform upon which to teach all aspects of the space mission lifecycle. JPL took on this mission type with Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment2 (INSPIRE), moving the concept into a new domain: deep space. Building from the INSPIRE platform and lessons learned, MarCO addressed new challenges in the domain of planetary missions: independent interplanetary flight and navigation, integration with a large-scale mission, long-distance and long-delay communication, short development time, and a small development team. Of these, the greatest constraint was schedule: only 18 months passed from conception of mission concept until delivery of fully assembled and tested flight hardware. Careful selection of mission team, along with extensive use of off-the-shelf equipment, and streamlining automated processes, was essential. This achievement represents the next step in the evolution of CubeSats beyond low-Earth orbit.

Werne, Thomas↗

Large space systems auxiliary propulsion requirements

To meet the needs of a variety of civilian and military missions objectives large space systems (LSS) will become a greater percentage of our orbiting hardware. These LSS's will be transported to low Earth orbit (LEO) by the space transportation system (STS Shuttle). Concurrently, for LSS missions to orbit higher than LEO, the predominant mission scenario is that the LSS will be deployed or assembled in LEO and then transferred to a higher orbit. In support of the LSS concepts, the Office of Aeronautics and Space Technology (OAST) has sponsored studies to determine LSS mission propulsion requirements. Since the fall of 1979, the Boeing Aerospace Company, under contract to NASA and Lewis Research Center, has been studying the disturbance forces and torques that will be experienced by LSS, and they have identified some of the associated auxiliary propulsion systems (APS) requirements. This presentation provides an insight into the results of some of the APS studies, focusing primarily on the APS requirements of single Shuttle launchable LSS's.

Maloy, J. E.↗

Induction Heating Model of Cermet Fuel Element Environmental Test (CFEET)

Deep space missions with large payloads require high specific impulse and relatively high thrust to achieve mission goals in reasonable time frames. Nuclear Thermal Rockets (NTR) are capable of producing a high specific impulse by employing heat produced by a fission reactor to heat and therefore accelerate hydrogen through a rocket nozzle providing thrust. Fuel element temperatures are very high (up to 3000 K) and hydrogen is highly reactive with most materials at high temperatures. Data covering the effects of high‐temperature hydrogen exposure on fuel elements are limited. The primary concern is the mechanical failure of fuel elements due to large thermal gradients; therefore, high‐melting‐point ceramics‐metallic matrix composites (cermets) are one of the fuels under consideration as part of the Nuclear Cryogenic Propulsion Stage (NCPS) Advance Exploration System (AES) technology project at the Marshall Space Flight Center. The purpose of testing and analytical modeling is to determine their ability to survive and maintain thermal performance in a prototypical NTR reactor environment of exposure to hydrogen at very high temperatures and obtain data to assess the properties of the non‐nuclear support materials. The fission process and the resulting heating performance are well known and do not require that active fissile material to be integrated in this testing. A small‐scale test bed; Compact Fuel Element Environmental Tester (CFEET), designed to heat fuel element samples via induction heating and expose samples to hydrogen is being developed at MSFC to assist in optimal material and manufacturing process selection without utilizing fissile material. This paper details the analytical approach to help design and optimize the test bed using COMSOL Multiphysics for predicting thermal gradients induced by electromagnetic heating (Induction heating) and Thermal Desktop for radiation calculations.

Gomez, C. F.↗

Induction Heating Model of Cermet Fuel Element Environmental Test (CFEET)

Deep space missions with large payloads require high specific impulse and relatively high thrust to achieve mission goals in reasonable time frames. Nuclear Thermal Rockets (NTR) are capable of producing a high specific impulse by employing heat produced by a fission reactor to heat and therefore accelerate hydrogen through a rocket nozzle providing thrust. Fuel element temperatures are very high (up to 3000 K) and hydrogen is highly reactive with most materials at high temperatures. Data covering the effects of high‐temperature hydrogen exposure on fuel elements are limited. The primary concern is the mechanical failure of fuel elements due to large thermal gradients; therefore, high‐melting‐point ceramics‐metallic matrix composites (cermets) are one of the fuels under consideration as part of the Nuclear Cryogenic Propulsion Stage (NCPS) Advance Exploration System (AES) technology project at the Marshall Space Flight Center. The purpose of testing and analytical modeling is to determine their ability to survive and maintain thermal performance in a prototypical NTR reactor environment of exposure to hydrogen at very high temperatures and obtain data to assess the properties of the non‐nuclear support materials. The fission process and the resulting heating performance are well known and do not require that active fissile material to be integrated in this testing. A small‐scale test bed; Compact Fuel Element Environmental Tester (CFEET), designed to heat fuel element samples via induction heating and expose samples to hydrogen is being developed at MSFC to assist in optimal material and manufacturing process selection without utilizing fissile material. This paper details the analytical approach to help design and optimize the test bed using COMSOL Multiphysics for predicting thermal gradients induced by electromagnetic heating (Induction heating) and Thermal Desktop for radiation calculations.

Gomez, Carlos F.↗

Mariner Mars 1971 adaptive mission planning.

A formal mission-planning process was developed for the Mariner Mars 1971 missions to allow large-scale mission-plan changes based upon flight experience. A modular approach was taken to the definition of requirements and constraints for elements of the mission. A set of rules for combining these modules was established. The concept of a standard mission day was developed in order to provide a consistent time framework for operations. The resulting process allowed for major mission revisions after the failure of Mariner 8 and again after a dust storm had obscured Mars. It allowed adaptive science planning on a short-term turnaround basis throughout the mission.

Haynes, N. R.↗

Definition of technology development missions for early space stations: Large space structures

The objectives studied are the definition of the tested role of an early Space Station for the construction of large space structures. This is accomplished by defining the LSS technology development missions (TDMs) identified in phase 1. Design and operations trade studies are used to identify the best structural concepts and procedures for each TDMs. Details of the TDM designs are then developed along with their operational requirements. Space Station resources required for each mission, both human and physical, are identified. The costs and development schedules for the TDMs provide an indication of the programs needed to develop these missions.

Gates, R. M.↗

An investigation of the use of temporal decomposition in space mission scheduling

This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.

Bullington, Stanley E.↗

Science Planning for the NASA Mars Reconnaissance Orbiter Mission

The Mars Reconnaissance Orbiter (MRO), launched on August 12, 2005, carries six science instruments, each with unique requirements for repetitive global monitoring, regional or global survey mapping, and/or targeted observations of Mars. Some prefer nadir-only observations, while other instruments require many off-nadir observations (especially for stereo viewing). Because the operations requirements are often incompatible, an interactive science planning process has been developed. This process is more complex than in some recent NASA Mars missions, but less complex (and more repetitive) than processes used by many large planetary missions. It takes full advantage of MRO's novel onboard processing capabilities, and uses simple electronic interactions between geographically distributed teams. This paper describes the process used during MRO's Primary Science Phase (PSP) to plan both interactive and non-interactive observations of Mars, and what has already been learned in the tests and rehearsals preparing for PSP.

planning↗

Low Cost Nuclear Thermal Rocket Cermet Fuel Element Environment Testing

Deep space missions with large payloads require high specific impulse and relatively high thrust to achieve mission goals in reasonable time frames.1,2 Conventional storable propellants produce average specific impulse. Nuclear thermal rockets capable of producing high specific impulse are proposed. Nuclear thermal rockets employ heat produced by fission reaction to heat and therefore accelerate hydrogen, which is then forced through a rocket nozzle providing thrust. Fuel element temperatures are very high (up to 3000 K), and hydrogen is highly reactive with most materials at high temperatures. Data covering the effects of high-temperature hydrogen exposure on fuel elements are limited.3 The primary concern is the mechanical failure of fuel elements that employ high-melting-point metals, ceramics, or a combination (cermet) as a structural matrix into which the nuclear fuel is distributed. The purpose of the testing is to obtain data to assess the properties of the non-nuclear support materials, as-fabricated, and determine their ability to survive and maintain thermal performance in a prototypical NTR reactor environment of exposure to hydrogen at very high temperatures. The fission process of the planned fissile material and the resulting heating performance is well known and does not therefore require that active fissile material be integrated in this testing. A small-scale test bed designed to heat fuel element samples via non-contact radio frequency heating and expose samples to hydrogen is being developed to assist in optimal material and manufacturing process selection without employing fissile material. This paper details the test bed design and results of testing conducted to date.

Bradley, D. E.↗

Nuclear-electric power in space

Prospective missions requiring large power supplies that might be satisfied with space nuclear reactors (SNR) are discussed, along with design concepts and problems and other potential high-power space systems. Having a minimum economic output of 10 kWe, SNR seem well-suited as the power sources for DBS systems, space-based ATC systems manned planetary missions, an expanding Space Station, materials processing, and outer planets missions. SNR avoid the large area problems of solar cell arrays, short lifetimes of thermionic converters, and vibration and heat control in Stirling engines. Design problems exist for SNR in the heat transfer and rejection systems, radioactive emissions and degradation of reactor materials, and size. The latter is a function of Shuttle payload constaints and raises the possibility of having to load the fuel while in orbit. The earliest operational date of SNRs is projected for the early 1990s, if progress is good in the current SP-100 program.

Truscello, V. C.↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

Technology assessment and outlook

The development of large space structures (LSS) for the 1980s is surveyed. Consideration is given to LSS mission requirements, large space antenna technology, several steps towards LSS development (1985-1995), structures technology needs (e.g., structural design criteria, assembly concepts, and practical joint and member concepts), structural dynamics/controls technology needs, and materials technology needs (e.g., accelerated test techniques and life prediction techniques).

Card, M. F.↗

Large Space Antenna Systems Technology, 1984

Mission applications for large space antenna systems; large space antenna structural systems; materials and structures technology; structural dynamics and control technology, electromagnetics technology, large space antenna systems and the Space Station; and flight test and evaluation were examined.

Boyer, W. J.↗

Large Space Antenna Systems Technology, part 1

This publication is a compilation of the unclassified papers presented at the NASA Conference on Large Space Antenna Systems Technology, which was held at the Langley Research Center, Hampton, Virginia, November 30 - December 3, 1982. The conference, which was sponsored jointly by the NASA Office of Aeronautics and Space Technology (OAST) and the NASA Langley Research Center, was organized into five sessions: Systems, Structures Technology, Control Technology, electromagnetics, and Space Flight Test and Evaluation. All speakers and topics were selected by the session cochairmen and included representation from industry, universities, and government. The program was organized to provide a comprehensive review of space missions requiring large antenna systems and of the status of key technologies required to enable these missions.

Large space systems↗