Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Countdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Human Performance Modeling and Simulation for Launch Team Applications

This paper describes ongoing research into modeling and simulation of humans for launch team analysis, training, and evaluation. The initial research is sponsored by the National Aeronautics and Space Administration's (NASA)'s Office of Safety and Mission Assurance (OSMA) and NASA's Exploration Program and is focused on current and future launch team operations at Kennedy Space Center (KSC). The paper begins with a description of existing KSC launch team environments and procedures. It then describes the goals of new Simulation and Analysis of Launch Teams (SALT) research. The majority of this paper describes products from the SALT team's initial proof-of-concept effort. These products include a nominal case task analysis and a discrete event model and simulation of launch team performance during the final phase of a shuttle countdown; and a first proof-of-concept training demonstration of launch team communications in which the computer plays most roles, and the trainee plays a role of the trainee's choice. This paper then describes possible next steps for the research team and provides conclusions. This research is expected to have significant value to NASA's Exploration Program.

Peaden, Cary J.↗

Aquarius iPhone Application

The Office of the CIO at JPL has developed an iPhone application for the Aquarius/SAC-D mission. The application includes specific information about the science and purpose of the Aquarius satellite and also features daily mission news updates pulled from sources at Goddard Space Flight Center as well as Twitter. The application includes a media and data tab section. The media section displays images from the observatory, viewing construction up to the launch and also includes various videos and recorded diaries from the Aquarius Project Manager. The data tab highlights many of the factors that affect the Earth s ocean and the water cycle. The application leverages the iPhone s accelerometer to move the Aquarius Satellite over the Earth, revealing these factors. Lastly, this application features a countdown timer to the satellite s launch, which is currently counting the days since launch. This application was highly successful in promoting the Aquarius Mission and educating the public about how ocean salinity is paramount to understanding the Earth.

Estes, Joseph C., Jr.↗

Ice/frost/debris assessment for space shuttle Mission STS-32 (61-C)

An Ice/Frost/Debris assessment was conducted for Space Shuttle Mission STS-32 (61-C). This assessment begins with debris inspections of the flight elements and launch facilities before and after launch. Ice/Frost formations are calculated during cryogenic loading of the external tank followed by an on-pad assessment of the Shuttle vehicle and pad at T-3 hours in the countdown. High speed films are reviewed after launch to identify Ice/Frost/Debris sources and investigate potential vehicle damage. The Ice/Frost/Debris conditions and their effects on the Space Shuttle are documented.

Stevenson, Charles G.↗

Delta II Mars Pathfinder

Final preparations for lift off of the DELTA II Mars Pathfinder Rocket are shown. Activities include loading the liquid oxygen, completing the construction of the Rover, and placing the Rover into the Lander. After the countdown, important visual events include the launch of the Delta Rocket, burnout and separation of the three Solid Rocket Boosters, and the main engine cutoff. The cutoff of the main engine marks the beginning of the second stage engine. After the completion of the second stage, the third stage engine ignites and then cuts off. Once the third stage engine cuts off spacecraft separation occurs.

Source record↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

Artemis I Is the First NASA Mission to Use Wi-Fi® in Lunar Orbit

During the countdown procedure for the Artemis I launch, the flight control team at NASA’s Johnson Space Center in Houston activated a set of cameras looking back at the vehicle from the wing-tips of the solar arrays. Throughout the flight, the team used photos from these cameras to survey and assess the condition of the vehicle, monitor for micrometeorite damage, and maintain situational awareness. The ground control team was even able to watch live video as the solar array wings unfolded. The cameras continued to store imagery to internal memory as well as send photos over Wi-Fi® even as the vehicle lost communication with Earth as it flew behind the moon. Artemis I is the first NASA mission to use WiFi in lunar orbit.

Wi-Fi↗

Skylab 2 post-launch report (RCS 76-0000-00048)

The launch vehicle stages for SL-2, the CSM experiments, and their associated support equipment are reported. The performance of KSC systems in support of processing and launch of the SL-2 are described along with major processing events for each launch vehicle stage, the spacecraft, and the general experiments of the SL-2 S/V. The final countdown and hold times are noted and a summary of the launch vehicle is included. The weather conditions at launch time and the range support activities are given.

Source record↗

Simulation and Analysis of Launch Teams (SALT)

A SALT effort was initiated in late 2005 with seed funding from the Office of Safety and Mission Assurance Human Factors organization. Its objectives included demonstrating human behavior and performance modeling and simulation technologies for launch team analysis, training, and evaluation. The goal of the research is to improve future NASA operations and training. The project employed an iterative approach, with the first iteration focusing on the last 70 minutes of a nominal-case Space Shuttle countdown, the second iteration focusing on aborts and launch commit criteria violations, the third iteration focusing on Ares I-X communications, and the fourth iteration focusing on Ares I-X Firing Room configurations. SALT applied new commercial off-the-shelf technologies from industry and the Department of Defense in the spaceport domain.

Source record↗

Delta XTE Press Briefing

Live coverage of the pre-launch Delta X-Ray Timing Explorer (XTE) press briefing is presented. George Diller, NASA Public Affairs, introduces the panel. The panel consists of Floyd Curington, NASA Launch Manager, Kennedy Space Center; David Mitchell, Launch Vehicle Manager, NASA Goddard Space Flight Center; Dale Schulz, Mission Director, XTE Project Manager Goddard Space Flight Center; Dr. Hale Bradt, XTE Principle Investigator, Massachusetts Institute of Technology (MIT); and Joel Tumbiolo, Launch Weather Officer, Department of the Air Force. The launch of the Delta XTE spacecraft atop the Delta 230 expendable launch vehicle is discussed. Once lofted into orbit, the XTE spacecraft will embark on a two-year mission to carry out an in-depth study of x-ray sources in the universe. Floyd Curington gives the lift-off schedule, fueling, and countdown of the spacecraft. David Mitchell discusses the launch sequence and spacecraft separation. Dale Schulz presents viewcharts of the instrument side of the XTE. Dr. Hale will be studying compact stars such as light dwarfs, neutron stars and quasars. Joel Tumbiolo presents the weather forecast for the December 10, 1995 launch. The press briefing ends with a question and answer period.

Source record↗

STS-105 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glen Chin, STS-105 Mission Manager, and Ed Priselac, Shuttle Weather Officer. They give an overview of the countdown to the STS-105 Discovery Orbiter launch, including details on prelaunch tests (activate and check on-board avionics software, payload bay closeout, prepare and clear launch pad, etc.), payload bay status (Leonardo Multipurpose Logistics Module), and the weather forecast. The men then answer questions from the press.

Source record↗

ADDJUST-A View of the First 25 Years

Various technologies and innovative launch operations were developed during the 50 years of the Centaur upper stage—the first launch vehicle to use high performing liquid hydrogen fuel. One innovation was “ADDJUST”, which enabled the successful negotiation of upper level winds measured only hours before launch. Initial causes for its creation, development, and operation during countdown are detailed. Problem definition, wind measuring/monitoring process, pitch and yaw steering coefficient generation, loads analysis, angle of attack, major risks/concerns, and anecdotal recollections are provided. Launch availability improved from as low as 55 to 95 percent due to ADDJUST, which is still in use.

Upper level winds↗

STS-99 Crew with Press, TCDT Crew Emergency Egress Training, Walkdown Pad 39A

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. and led by Commander Kevin Kregel. The crew was Pilot Dominic L. Pudwill Gorie and Mission Specialists Janet L. Kavandi, Janice E. Voss, Mamoru Mohri from the National Space Development Agency (Japanese Space Agency), and Gerhard P. J. Thiele from DARA (German Space Agency). In this tape Commander Kevin Kregel introduces the crew to the assembled press at the site where they will practice emergency exit procedures as part of the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch.

Source record↗

EPS analysis of nominal STS-1 flight

The results of electrical power system (EPS) analysis of the planned Shuttle Transportation System Flight 1 mission are presented. The capability of the orbiter EPS to support the planned flight and to provide program tape information and supplementary data specifically requested by the flight operations directorate was assessed. The analysis was accomplished using the orbiter version of the spacecraft electrical power simulator program, operating from a modified version of orbiter electrical equipment utilization baseline revision four. The results indicate that the nominal flight, as analyzed, is within the capabilities of the orbiter power generation system, but that a brief, and minimal, current overload may exist between main distributor 1 and mid power controlled 1, and that inverter 9 may the overloaded for extended periods of time. A comparison of results with launch commit criteria also indicated that some of the presently existing launch redlines may be violated during the terminal countdown.

Wolfgram, D. F.↗

STS-97 Mission Highlights Resource Tape

Various clips give an overview of the STS-97 Endeavour mission. Footage includes Endeavour on the launch pad, the crew of STS-97 (Commander Brent W. Jett, Pilot Michael J. Bloomfield, and Mission Specialists Joseph R. Tanner, Carlos I. Noriega, and Marc Garneau) suiting up, replays of the nighttime launch, Launch Control Center at Kenendy Space Center during countdown, and the activities of flight days one through three. The activities of flight days four through six can be seen on 'STS-97 Mission Highlights Resource Tape, Part 2 of 3' (document ID 20010020282). The activities of flight days seven through eleven and Endeavour's landing can be found on 'STS-97 Mission Highlights Resource Tape, Part 3 of 3' (document ID 20010020283).

Source record↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗

STS-114: Discovery Mission Status Briefing

This video features mid-deck payloads being stowed at Pad 39B, a ribbon cutting ceremony at the NASA Shuttle Launch Facility (SLF) Air Traffic Control Tower and footage of the air traffic control radar constructed at Shiloh. The STS-114 Crewmembers, Commander, Eileen Collins, Pilot, James Kelly, Mission Specialist, Charles Camarda, Mission Specialist, Wendy Lawrence, Mission Specialist, Soichi Noguchi, JAXA, Mission Specialist, Stephen Robinson, and Mission Specialist Andrew Thomas are shown arriving at the Shuttle Landing Facility at Kennedy Space Center. Eileen Collins introduces each crew member and talks to the news media about their role during this mission. The astronauts are also shown during their spacesuit fit check at the Operations and Control Center (O&C) and footage of a practice flight is presented. The start of the countdown clock in the firing room 3 of the launch control center is shown

Source record↗

STS-99 Post-Launch Press Conference

Live footage shows the participants in the Post-Launch Press Conference disclosing the status of the STS-99 flight. The panelists consist of Bill Gerstenmaier, Acting Manager of Launch Integration and Dave King, Director of Shuttle Operations at KSC (Kennedy Space Center). Joel Wells, of NASA's Public Affairs Office, introduces each panelist as they discuss the mapping to the Earth, and improve safety of the shuttle. The panelists also answer questions from the audience about the countdown. Also shown are various shots of the Shuttle on the launch pad.

Source record↗