Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Space Launch System Vibration Analysis Support

The ultimate goal for my efforts during this internship was to help prepare for the Space Launch System (SLS) integrated modal test (IMT) with Rodney Rocha. In 2018, the Structural Engineering Loads and Dynamics Team will have 10 days to perform the IMT on the SLS Integrated Launch Vehicle. After that 10 day period, we will have about two months to analyze the test data and determine whether the integrated vehicle modes/frequencies are adequate for launching the vehicle. Because of the time constraints, NASA must have newly developed post-test analysis methods proven well and with technical confidence before testing. NASA civil servants along with help from rotational interns are working with novel techniques developed and applied external to Johnson Space Center (JSC) to uncover issues in applying this technique to much larger scales than ever before. We intend to use modal decoupling methods to separate the entangled vibrations coming from the SLS and its support structure during the IMT. This new approach is still under development. The primary goal of my internship was to learn the basics of structural dynamics and physical vibrations. I was able to accomplish this by working on two experimental test set ups, the Simple Beam and TAURUS-T, and by doing some light analytical and post-processing work. Within the Simple Beam project, my role involves changing the data acquisition system, reconfiguration of the test set up, transducer calibration, data collection, data file recovery, and post-processing analysis. Within the TAURUS-T project, my duties included cataloging and removing the 30+ triaxial accelerometers, coordinating the removal of the structure from the current rolling cart to a sturdy billet for further testing, preparing the accelerometers for remounting, accurately calibrating, mounting, and mapping of all accelerometer channels, and some testing. Hammer and shaker tests will be performed to easily visualize mode shapes at low frequencies. Short analytical projects using MATLAB were also assigned to aid in research efforts. These included integration of acceleration data for comparison to measured displacement data. Laplace and Fourier transforms were also investigated to determine viability as a method of modal decoupling. In addition to these projects, I was also able contribute work that would benefit future interns and the division as a whole. I gave a short presentation and answered questions to aid in the recruitment of subsequent interns and co-ops for the division. I also assisted in revisions and additions to Intern/Co-Op Handbook to provide incoming employees with background information on the organization they are about to work for. I further developed tutorial on Pulse software, which was used for data acquisition for both experiments and will be helpful to interns and engineers that may be unfamiliar to the software. I gained a diverse range of experience throughout my internship. I was introduced to advanced dynamics and analytical techniques. This was through new experience with both hands on experimentation and analytical post processing methods. I was exposed to the benefits of interdepartmental collaboration and developed stronger skills in time management by coordinating two different tests at once. This internship provided an excellent opportunity to see how engineering theories applied to real life scenarios, and an introduction to how NASA/JSC solves technical problems.

Johnson, Katie↗

Space Commerce 1994 Forum: The 10th National Space Symposium. Proceedings report

The theme of the 10th National Space Symposium was 'New Windows of Opportunity'. These proceedings cover the following: Business Trends in High Tech Commercialization; How to Succeed in Space Technology Business -- Making Dollars and Sense; Obstacles and Opportunities to Success in Technology Commercialization NASA's Commercial Technology Mission -- a New Way of Doing Business: Policy and Practices; Field Center Practices; Practices in Action -- A New Way: Implementation and Business Opportunities; Space Commerce Review; Windows of Opportunity; the International Space Station; Space Support Forum; Spacelift Update; Competitive Launch Capabilities; Supporting Life on Planet Earth; National Security Space Issues; NASA in the Balance; Earth and Space Observations -- Did We Have Cousins on Mars?; NASA: A New Vision for Science; and Space Technology Hall of Fame.

Lipskin, Beth Ann↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Earth Observing System (EOS) Aqua Launch and Early Mission Attitude Support Experiences

The Earth Observing System (EOS) Aqua satellite was successfully launched on May 4,2002. Aqua is the second in the series of EOS satellites. EOS is part of NASA s Earth Science Enterprise Program, whose goals are to advance the scientific understanding of the Earth system. Aqua is a three-axis stabilized, Earth-pointing spacecraft in a nearly circular, sun-synchronous orbit at an altitude of 705 km. The Goddard Space Flight Center (GSFC) Flight Dynamics attitude team supported all phases of the launch and early mission. This paper presents the main results and lessons learned during this period, including: real-time attitude mode transition support, sensor calibration, onboard computer attitude validation, response to spacecraft emergencies, postlaunch attitude analyses, and anomaly resolution. In particular, Flight Dynamics support proved to be invaluable for successful Earth acquisition, fine-point mode transition, and recognition and correction of several anomalies, including support for the resolution of problems observed with the MODIS instrument.

Tracewell, D.↗

Stage Separation Wind Tunnel Tests of a Generic Two-Stage-to-Orbit Launch Vehicle

In support of NASA s Space Launch Initiative Program, stage separation wind tunnel tests of a generic two-stage-to-orbit (TSTO) launch vehicle were conducted to determine the interference aerodynamic forces and moments and to determine the proximity flow environment. The tests were conducted in the NASA Marshall Space Flight Center s Aerodynamic Research Facility using a manual separation fixture for a Mach number range of 2.74 to 4.96 and separation distances up to 80 percent and 35 percent of the body length in the vehicle X and Z coordinates, respectively. For the TSTO bimese, winged-body vehicle configuration, both wing-to-wing and wing-to-fuselage configurations were tested. Individual-body force and moment, schlieren, and surface pressure data were acquired. The results showed that the proximity aerodynamics were dominated by complex bow shock interactions, and that he booster was statically unstable at several separation positions. As compared to the isolated body, the proximity normal force change with pitch angle was found to be nearly the same, and the proximity axial force increased, in general, by 3% for both bodies.

Bordelon, Wayne J., Jr.↗

Geostationary Meteorological Satellite-5 (GMS-5)

The Geostationary Meteorological Satellite (GMS-5), which is being developed by the National Space Development Agency of Japan (NASDA), is the fifth geostationary, spin stabilized, weather satellite. Its purposes are to observe cataclysmic events such as hurricanes, typhoons, and regional weather phenomena; to relay meteorological data from surface collection points to the Data Processing Center in Japan; and to transmit processing imaging data for facsimile reproduction. The satellite will be launched from the Tanegashima Space Center (TaSC) in Japan by a type H-II launch vehicle. The Deep Space Network (DSN) will support the transfer and drift orbit mission phases. The coverage will consist of the 26-m antennas as prime and the 34-m antenna at Madrid as backup support for launch through drift orbit. Maximum support will consist of two 8-hour tracks per station for a seven day period, plus 23 days of contingency support from all complexes. Information is given in tabular form for DSN support, frequency assignments, telemetry, command and tracking station responsibility.

Horii, M.↗

Recent Activities of the Marshall Space Flight Center Natural Environments Branch Terrestrial & Planetary Environments Team

- The Natural Environments (NE) Branch is within the MSFC Engineering Directorate’s Spacecraft and Vehicle System (S&VS) Department - S&VS plans, performs and directs the technical Design, Analysis, Test, Evaluation, Verification, Integration, and Applied Research and Development of future Spacecraft and Launch Vehicle Systems - Current programs we support - Space Launch System, Human Landing System, Mars Ascent Vehicle, Orion, Gateway - NE maintains expertise in terrestrial, space, and planetary natural environments definition, characterization, and analysis - Responsibility to disseminate this expertise to Agency programs and projects in support of environment definition, requirements development, vehicle development, operations, and sustaining engineering through program’s life cycle - Branch has two teams; Terrestrial and Planetary Environments (T&PE) and Space Environments (SE) - T&PE has extensive expertise characterizing terrestrial surface and atmospheric (aloft) environments - Winds, temperature, humidity, pressure, lightning, density, precipitation, radiant energy, aerosols, sea state, sea surface temperature - Maintains climatological databases for engineering analyses

Ryan K. Decker↗

Application of information technology to the National Launch System

The approach to the development of the Unified Information System (UNIS) to provide in a timely manner all the information required to manage, design, manufacture, integrate, test, launch, operate, and support the Advanced Launch System (NLS), as well as the current and planned capabilities are described. STESYM, the Space Transportation Main Engine (STME) development program, is comprised of a collection of data models which can be grouped into two primary models: the Engine Infrastructure Model (ENGIM) and the Engine Integrated Cast Model (ENGICOM). ENGIM is an end-to-end model of the infrastructure needed to perform the fabrication, assembly, and testing of the STEM program and its components. Together, UNIS and STESYM are to provide NLS managers and engineers with the ability to access various types and files of data quickly and use that data to assess the capabilities of the STEM program.

Mauldin, W. T.↗

Lightning Launch Commit Criteria for America's Space Program

The danger of natural and triggered lightning significantly impacts space launch operations supported by the USAF. The lightning Launch Commit Criteria (LCC) are used by the USAF to avoid these lightning threats to space launches. This paper presents a brief overview of the LCC.

Roeder, W. P.↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Much Lower Launch Costs Make Resupply Cheaper than Recycling for Space Life Support

The development of commercial launch vehicles by SpaceX has greatly reduced the cost of launching mass to Low Earth Orbit (LEO). Reusable launch vehicles may further reduce the launch cost per kilogram. The new low launch cost makes open loop life support much cheaper than before. Open loop systems resupply water and oxygen in tanks for crew use and provide disposable lithium hydroxide (LiOH) in canisters to remove carbon dioxide. Short human space missions such as Apollo and shuttle have used open loop life support, but the long duration International Space Station (ISS) recycles water and oxygen and removes carbon dioxide with a regenerative molecular sieve. These ISS regenerative and recycling life support systems have significantly reduced the total launch mass needed for life support. But, since the development cost of recycling systems is much higher than the cost of tanks and canisters, the relative cost savings have been much less than the launch mass savings. The Life Cycle Cost (LCC) includes development, launch, and operations. If another space station was built in LEO, resupply life support would be much cheaper than the current recycling systems. The mission most favorable to recycling would be a long term lunar base, since the resupply mass would be large, the proximity to Earth would reduce the need for recycling reliability and spares, and the launch cost would be much higher than for LEO due to the need for lunar transit and descent propulsion systems. For a ten-year lunar base, the new low launch costs make resupply cheaper than recycling systems similar to ISS life support.

launch costs↗

Energy impact assessment of NASA's past, present, and future space launch vehicles

An approach to analyze the total energy required for overall support of space launch vehicles is outlined along with some of the basic data required for such analyses. Selected results obtained by using this approach are presented for various past (some are already phased out), present, and future NASA launch vehicles, including an estimate of the total annual energy required to support one projected NASA launch vehicle traffic model. The material presented is expected to give a better insight into the details of an energy impact analysis. Major conclusions are that: (1) for expendable launch vehicle systems, the energy required to manufacture hardware and support launch operations is most significant; (2) for totally reusable systems, the energy required to process/manufacture propellants and fluids is by far the most significant contributor; and (3) up to 1991, the projected highest annual energy requirement for the NASA launch vehicles does not constitute a significant energy impact relative to the nation's total energy needs.

Rice, E. E.↗

Artificial intelligent decision support for low-cost launch vehicle integrated mission operations

The feasibility, benefits, and risks associated with Artificial Intelligence (AI) Expert Systems applied to low cost space expendable launch vehicle systems are reviewed. This study is in support of the joint USAF/NASA effort to define the next generation of a heavy-lift Advanced Launch System (ALS) which will provide economical and routine access to space. The significant technical goals of the ALS program include: a 10 fold reduction in cost per pound to orbit, launch processing in under 3 weeks, and higher reliability and safety standards than current expendables. Knowledge-based system techniques are being explored for the purpose of automating decision support processes in onboard and ground systems for pre-launch checkout and in-flight operations. Issues such as: satisfying real-time requirements, providing safety validation, hardware and Data Base Management System (DBMS) interfacing, system synergistic effects, human interfaces, and ease of maintainability, have an effect on the viability of expert systems as a useful tool.

Szatkowski, Gerard P.↗