Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Cryogenic Flange and Seal Evaluation

The assembly of flanges, seals, and pipes are used to carry cryogenic fluid from a storage tank to the vehicle at launch sites. However, after a certain amount of cycles these raised face flanges with glass-filled Teflon gaskets have been found to have torque relaxation and are as a result susceptible to cryogenic fluid leakage if not re-torqued. The intent of this project is to identify alternate combinations of flanges and seals which may improve thermal cycle performance and decrease re-torque requirements. The general approach is to design a test fixture to evaluate leak characteristics between spiral and concentric serrations and to test alternate flange and seal combinations. Due to insufficient time, it was not possible to evaluate these different types of combinations for the combination that improved thermal cycle performance the most. However, the necessary drawings for the test fixture were designed and assembled along with the collection of the necessary parts.

fluid↗

Space Station Freedom delta pressure leakage rate comparison test data analysis report

Results are provided of a series of tests performed to identify the relationship between gas leakage rates across a seal at various internal to external pressure ratios. The results complement and provide insight into the analysis technique used to obtain the results presented in MSFC SSF/DEV/EL91-008, 'Space Station Freedom (S.S. Freedom) Seal Flaw Study with Delta Pressure Leak Rate Comparison Test Report.'

Sorensen, E. B.↗

Detection, Location, and Classification of Space Shuttle Main Engine Nozzle Leaks by Transient Thermographic Inspection

Leak checking and evaluation of pressure vessels by observing the slight temperature changes resulting from structural anomalies has been made possible through developments in high resolution infrared cameras and advanced image processing. These developments have made thermal nondestructive analysis a very practical and efficient method to determine material consistency and structural quality as well as monitor processes. The Space Shuttle Main Engine Nozzle has regions which can not be inspected with standard leak check methods. The Thermographic methods being developed to nondestructively test the Nozzle for leaks in inaccessible regions are reported. Also, a flash heating Thermographic investigation of the braze line bonding the cooling tubes to the outer structural jacket of the nozzle is reported.

Russell, Samuel S.↗

Review of Full-Scale Docking Seal Testing Capabilities

NASA is developing a new docking system to support future space exploration missions to low-Earth orbit, the Moon, and Mars. This mechanism, called the Low Impact Docking System (LIDS), is designed to connect pressurized space vehicles and structures including the Crew Exploration Vehicle, International Space Station, and lunar lander. NASA Glenn Research Center (GRC) is playing a key role in developing the main interface seal for this new docking system. These seals will be approximately 147 cm (58 in.) in diameter. To evaluate the performance of the seals under simulated operating conditions, NASA GRC is developing two new test rigs: a non-actuated version that will be used to measure seal leak rates and an actuated test rig that will be able to measure both seal leak rates and loads. Both test rigs will be able to evaluate the seals under seal-on-seal or seal-on-plate configurations at temperatures from -50 to 50 C (-58 to 122 F) under operational and pre-flight checkout pressure gradients in both aligned and misaligned conditions.

Dunlap, Patrick H., Jr.↗

Experimental Studies of NaK in a Simulated Space Environment

Space fission power systems are being developed at the National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) with a short term goal of building a full scale, non-nuclear, Technology Demonstration Unit (TDU) test at NASA's Glenn Research Center. Due to the geometric constraints, mass restrictions, and fairly high temperatures associated with space reactors, liquid metals are typically used as the primary coolant. A eutectic mixture of sodium (22 percent) and potassium (78 percent), or NaK, has been chosen as the coolant for the TDU with a total system capacity of approximately 55 L. NaK, like all alkali metals, is very reactive, and warrants certain safety considerations. To adequately examine the risk associated with the personnel, facility, and test hardware during a potential NaK leak in the large scale TDU test, a small scale experiment was performed in which NaK was released in a thermal vacuum chamber under controlled conditions. The study focused on detecting NaK leaks in the vacuum environment as well as the molecular flow of the NaK vapor. This paper reflects the work completed during the NaK experiment and provides results and discussion relative to the findings.

Gibons, Marc↗

Passive Orbital Disconnect Strut (PODS 3), structural and thermal test program

A test program is undertaken to verify that the lifetime of a shuttle launchable dewar can be increased by using passive orbital disconnect struts (PODS). A detailed design is performed on the cold end (PODS-III) portion of the strut. Structural analysis of the thin-wall fiberglass tube allows selection of the optimum winding angle and tube dimensions. Structural tests on the thin-wall fiberglass tube measure both the tension and compression modulus at ambient and LN2 temperatures, the radial deflection versus side load, and the ultimate compression strength of the tube at LN2 temperature. The thermal expansion of the fiberglass tube plus Invar is also measured down to 78 K. The axial gap at the wedge portion of the stem is set based on these data. The PODS-III test article parts are fabricated and assembled using a detailed assembly procedure. The thermal conductants in the orbital configuration was measured for body temperatures between 5 and 40 K. This temperature range covers the predicted ground hold and orbit temperatures for vapor-cooled supports. The test results are then compared with heat leak values predicted before the test began. Side load, axial compression load, and tension load tests conclude the test program.

Parmley, R. T.↗

Leak Rate Quantification Method for Gas Pressure Seals with Controlled Pressure Differential

An enhancement to the pressure decay leak rate method with mass point analysis solved deficiencies in the standard method. By adding a control system, a constant gas pressure differential across the test article was maintained. As a result, the desired pressure condition was met at the onset of the test, and the mass leak rate and measurement uncertainty were computed in real-time. The data acquisition and control system were programmed to automatically stop when specified criteria were met. Typically, the test was stopped when a specified level of measurement uncertainty was attained. Using silicone O-ring test articles, the new method was compared with the standard method that permitted the downstream pressure to be non-constant atmospheric pressure. The two methods recorded comparable leak rates, but the new method recorded leak rates with significantly lower measurement uncertainty, statistical variance, and test duration. Utilizing this new method in leak rate quantification, projects will reduce cost and schedule, improve test results, and ease interpretation between data sets.

seal↗

Analysis of pressure test results of tube fittings for the potential application in cryo systems for helium leak rate reduction

Due to the nature of Helium, it is notoriously difficult to maintain a closed system without experiencing helium inventory loss through leakage in large tubing and piping runs. There are two standard fitting options readily available for piping and tubing assemblies, welded fittings or Swagelok ® . Welding is the best option for leak rate reduction, but more costly than Swagelok ® . A new style of fitting has come to the attention of BNL C-AD Cryo group, and a pressure test and leak rate analysis were performed to evaluate the viability of incorporating this new style fitting into current engineering design of warm helium tubing runs for the purpose of leak rate reduction.

43 PARTICLE ACCELERATORS↗

Quantifying Leak Rates and Vacuum Impact on Granular Soil Column Pneumatic Seal

Introduction: All In-Situ Resource Utilization (ISRU) regolith reactor systems that aim to extract gases or vapors must maintain a seal along the flow path of the regolith from the inlet hopper to where extracted gases or vapors are generated. Using a column of regolith at the inlet has been proposed as an alternative to systems using series of mechanical valves to reduce mass and complexity. Preliminary investigations into the use of regolith itself as a barrier to escaping fluids have been conducted, which this research seeks to expand upon. Different vertical regolith simulant plug diameters and heights were tested under vacuum with dry nitrogen to observe leak rates and approximate steady state pressure gradient equilibria. The effect of absolute ambient pressure was also studied by repeating tests at incremental pressures ranging from 10e-5 Torr up to 1 atm to corroborate ambient bench tests from previous work. The impact of regolith dynamics was addressed to emulate continuous-feed regolith reaction processes by measuring leak rates through continuously draining simulant columns. OB-1 lunar highlands regolith simulant was used. Experimental Setup: Regolith simulant columns were constructed using a motorized butterfly valve separating upper acrylic tubes of various diameters from a larger, lower aluminum pipe plenum (See Figure 1). The butterfly valve was cracked open such that gas could freely pass through whereas regolith would bridge and stay suspended as a cohesive plug above in the acrylic portion. These assemblies were loaded into a vacuum chamber, and a compressed dry nitrogen line was routed into the lower plenum. Pressure transducers measured the absolute pressure of the lower plenum, which was compared to absolute chamber pressure to monitor the pressure gradient across the regolith simulant. A precision mass flow controller enabled fine control of plenum pressure. The plenum pressure was quasi-statically increased to set points informed by previous work [1] before shutting off the gas supply to allow the now pressurized gas volume to dissipate through the simulant into the chamber in what was referred to as a ‘leak test.’ In a separate set of tests, the pressure was allowed to quasi-statically build until visual disturbances in the soil were observed via remote camera feeds. Initial leak rate tests were repeated on the disturbed soil to observe changes in leak rates between initial as-poured and post-bubbling soil conditions. This test schedule was applied to simulant columns of three different diameters (approximately 2, 4, and 6 inches) as well as two different heights (around 8 and 16 inches) and was repeated at least three times for each configuration. Plenums were also pressurized while the butterfly valves were opened slightly further to facilitate slow, controlled, constant flowrate draining of the simulant to observe the impact that continuous-feed systems might have on leak rate through the regolith column. Finally, the regolith columns were reset and refilled and static leak rate tests were repeated approximately every decade in ambient pressure from 10e-5 Torr up to ambient conditions to observe the impact of transitioning out of the molecular flow regime on regolith column seal performance. Analysis: Trends with respect to each factor examined were constructed and reported alongside commentary on the most likely responsible physical phenomena. Confidence intervals were applied to the predictive findings of the data by quantifying instrumentation error and accounting for probabilistic impacts of curve fitting the generic exponential function onto pressure decay data. The leak rate is assumed directly proportional to the exponential term coefficient, while the steady-state static pressure gradient is assumed to be the asymptotic limit of each curve fit. Finally, a generic model developed by Ogino et al. [2] and later tuned for ambient testing was re-tuned using vacuum data to estimate leak rates on the lunar surface. Results: Pressure decay rates decreased up to 27-fold under vacuum when compared to ambient pressure, as shown in Figure 2. Simulant column diameter was found to exponentially correlate to both regolith column leak rate and steady-state equilibrium pressure delta. Height was found to be linearly related to leak rate –doubling the regolith column height consistently yielded around a 40% reduction in leak rate. Dynamic regolith draining was found to slightly increase leak rate, although to a lower degree than expected. Conclusion: Because of the transition into molecular gas flow through regolith, vacuum testing is required to properly estimate performance. Regolith columns should be designed as narrow as possible to avoid bridging and minimize leak rate, and as tall as is feasible to both further reduce leak rate and to help prevent bubbling, which has been shown to degrade the quality of the regolith seal. Disrupted soil was found to exhibit higher leak rates than pristine, as-poured soil, indicating the need to consider the impact of recovery from depressurization events. Regolith columns appear equally feasible for both dosed and continuous-feed reactors.

ISRU↗

Performance tests on the Kohmyr ECC ozone sonde

The reliability and accuracy of the Kohmyr ECC ozone sonde are determined. Emphasis is placed on establishing and testing for leak-free connections and stable pump flow rates as well as properly adjusting the pumping pressure. Calibration of the Kohmyr ECC ozone sondes and Dasibi monitors is described. Raw ordinate data and ozone connection data are presented in tabular form. The results of a linear regression treatment of the sonde-indicated ozone concentration vs. Dasibi readings for each switch position are included along with averages of the regression parameters over the six sequencing switch positions. It is suggested that sondes and Dasibi monitors be individually calibrated before flight.

Bandy, A. R.↗

ES61 – Mechanical Components Test Facility Capabilities

The Mechanical Components Test Facility (MCTF), also known as "Leak Lab" at MSFC is a multi-capability lab that facilitates payload evolution from proof-of-concept to on-orbit operations. We also have the capability to bring our equipment to various location for off-site testing.

Jamboree↗

Optical Detection Of Cryogenic Leaks

Conceptual system identifies leakage without requiring shutdown for testing. Proposed device detects and indicates leaks of cryogenic liquids automatically. Detector makes it unnecessary to shut equipment down so it can be checked for leakage by soap-bubble or helium-detection methods. Not necessary to mix special gases or other materials with cryogenic liquid flowing through equipment.

Wyett, Lynn M.↗

QM-8 final performance evaluation report: SEALS, volume 4

The Space Shuttle Redesigned Solid Rocket Motor (RSRM) static test of Qualification Motor-8 (QM-8) was conducted. The QM-8 test article was the fifth full-scale, full-duration test, and the third qualification motor to incorporate the redesigned case field joint and nozzle-to-case joint. This was the second static test conducted in the T-97 test facility, which is equipped with actuators for inducing external side loads to a 360 degree external tank (ET) attach ring during test motor operation, and permits heating/cooling of an entire motor. The QM-8 motor was cooled to a temperature which ensured that the maximum propellant mean bulk temperature (PMBT) of 40 F was achieved at firing. All test results are not included, but rather, the performance of the metal case, field joints, and nozzle-to-case joint is addressed. The involvement is studied of the Structural Applications and Structural Design Groups with the QM-8 test which includes: assembly procedures of the field and nozzle-to-case joints, joint leak check results, structural test results, and post-test inspection evaluations.

Nelsen, L. V.↗

Evaluation of Cleaning Methods for Dust Mitigation of Lunar Docking and Hatch Seals

Low-leakage seals are an enabling technology for future lunar surface systems, and they must be kept clean to ensure that crews have sufficient breathable air for extended lunar surface missions. Previous testing on representative state-of-the-art seals showed that while seals can tolerate some level of lunar simulant dust contamination, dust can degrade seal performance to a point at which seal leak rates exceed maximum allowable values. The ability to clean simulant from seals had not been thoroughly studied, and the effectiveness and potential complications of using different cleaning methods for lunar seals were not well understood. To address this knowledge gap, researchers at the NASA Glenn Research Center executed a multiphase study to better understand and mitigate seal dust-exposure risks. The focus of this report is on the second phase of that study, in which tests were conducted to evaluate the viability of seal cleaning methods for use in the lunar environment. Multiple methods for cleaning seals contaminated with lunar simulant were assessed for cleaning effectiveness and viability for use in the lunar environment. Leak tests were performed on seals after they were cleaned to determine whether leak rates could be brought back to acceptable levels, and cleaned seals were examined to determine whether their surfaces had been damaged by the cleaning processes. This phase of the study also investigated changes in the seals’ adhesion forces as a result of contamination and cleaning.

Dust Mitigation↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Green Applications for Space Power Project

Spacecraft propulsion and power for many decades has relied on Hydrazine monopropellant technology for auxiliary power units (APU), orbital circularization, orbit raising/lowering and attitude control. However, Hydrazine is toxic and therefore requires special ground handling procedures to ensure launch crew safety. The Swedish Company ECAPS has developed a technology based upon the propellant Ammonium Dinitramide (ADN) that offers higher performance, higher density and reduced ground handling support than Hydrazine. This blended propellant is called LMP-103S. Currently, the United States Air Force (USAF) is pursuing a technology based on Hydroxyl Ammonium Nitrate (HAN, otherwise known as AF-M315E) with industry partners Aerojet and Moog. Based on the advantages offered by these propellants, MSFC should explore powering APU's with these propellants. Due to the availability of space hardware, the principal investigator has found a collection of USAF hardware, that will act as a surrogate, which operates on a Hydrazine derivative. The F-16 fighter jet uses H-70 or 30% diluted Hydrazine for an Emergency Power Unit (EPU) which supplies power to the plane. The PI has acquired two EPU's from planes slated for destruction at the Davis Monthan AFB. This CIF will include a partnership with 2 other NASA Centers who are individually seeking seed funds from their respective organizations: Kennedy Space Center (KSC) and Dryden Flight Research Center (DFRC). KSC is preparing for future flights from their launch pads that will utilize green propellants and desire a low-cost testbed in which to test and calibrate new leak detection sensors. DFRC has access to F-16's which can be used by MSFC & KSC to perform a ground test that demonstrates emergency power supplied to the jet. Neither of the green propellant alternatives have been considered nor evaluated for an APU application. Work has already been accomplished to characterize and obtain the properties of these 2 propellants. However, the spacecraft are using existing leak detection sensors that are typically used for Hydrazine. Using these green propellants for the APU application requires decrementing their TRL down to 3. This task would aim to establish a TRL of 4 at conclusion by showing a proof of concept with a KSC-instrumented EPU asset at the MSFC Component Development Area (CDA). The task to accomplish this is called Green Application for Space Power or GRASP.

Robinson, Joel↗

Polymer Matrix Composite Lines and Ducts

Since composite laminates are beginning to be identified for use in reusable launch vehicle propulsion systems, a task was undertaken to assess the feasibility of making cryogenic feedlines with integral flanges from polymer matrix composite materials. An additional level of complexity was added by having the feedlines be elbow shaped. Four materials, each with a unique manufacturing method, were chosen for this program. Feedlines were to be made by hand layup (HLU) with standard autoclave cure, HLU with electron beam cure, solvent-assisted resin transfer molding (SARTM), and thermoplastic tape laying (TTL). A test matrix of fill and drain cycles with both liquid nitrogen and liquid helium, along with a heat up to 250 F, was planned for each of the feedlines. A pressurization to failure was performed on any feedlines that passed the cryogenic cycling testing. A damage tolerance subtask was also undertaken in this study. The effects of foreign object impact to the materials used was assessed by cross-sectional examination and by permeability after impact testing. At the end of the program, the manufacture of the electron beam-cured feedlines never came to fruition. All of the TTL feedlines leaked heavily before any cryogenic testing, all of the SARTM feedlines leaked heavily after one cryogenic cycle. Thus, only the HLU with autoclave cure feedlines underwent the complete test matrix. They passed the cyclic testing and were pressurized to failure.

Nettles, A. T.↗