Search NASA⌕ Search

SEARCH · Search NASA

Results for “Load forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Coordinated Optimal Control of Constrained DERs

In this paper, a coordinated optimal control is designed to simultaneously satisfy multiple power system objectives at the distribution network level. With high penetration of renewables, traditional generation and control may not be enough to compensate for intermittent changes in net load. Dynamic coordination of battery storage devices and demand response at aggregated distributed energy resource (DER) sites becomes necessary to maintain power system operation, however, each dynamic power component operates at different time scales. Frequency stabilization can be achieved by designing optimal controls for traditional generation, storage devices and demand response. The proposed optimal controls naturally render frequency separation of these load balancing mechanisms. Given a 24-hour net load forecast, optimal tracking control inputs are designed subject to constraints of selected system elements to ensure optimal performance of the power system. Simulation results are presented and discussed.

Harvey, Roland↗

Demand Side Management in the Smart Grid: Information Processing for the Power Switch

In this article we discuss the most recent developments in the area of load management, and consider possible interaction schemes of novel architectures with distributed energy resources (DER). In order to handle the challenges faced by tomorrow’s smart grid, which are caused by volatile load and generation profiles (from the large number of plug-in EVs and from renewable integration), the conventional grid operating principle of load-following needs to be changed into load-shaping or generation-following. Demand Side Management will be a most promising and powerful solution to the above challenges. However, many other issues such as load forecasting, pricing structure, market policy, renewable integration interface, and even the AC/DC implementation at the distribution side, need to be taken into the design in order to search for the most effective and applicable solution.

Demand Response↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part I: Short Term Faults

Power system planning is the process of forecasting load demand and ensuring sufficient generation and reserve capacities over some planning horizon. This process includes investigation of steady-state and dynamic operation of power system of interest. This paper addresses the transient stability (also known as large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability and frequency response for all fault types for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted components present and is applicable to the study of both short term and long term faults, though only short term faults are considered here (long term faults are treated sequentially in a companion paper). Furthermore, this paper considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

A Multi-Band Uncertainty Set Based Robust SCUC With Spatial and Temporal Budget Constraints

The dramatic increase of renewable energy resources in recent years, together with the long-existing load forecast errors and increasingly involved price sensitive demands, has introduced significant uncertainties into power systems operation. In order to guarantee the operational security of power systems with such uncertainties, robust optimization has been extensively studied in security-constrained unit commitment (SCUC) problems, for immunizing the system against worst uncertainty realizations. However, traditional robust SCUC models with single-band uncertainty sets may yield over-conservative solutions in most cases. This paper proposes a multi-band robust model to accurately formulate various uncertainties with higher resolution. By properly tuning band intervals and weight coefficients of individual bands, the proposed multi-band robust model can rigorously and realistically reflect spatial/temporal relationships and asymmetric characteristics of various uncertainties, and in turn could effectively leverage the tradeoff between robustness and economics of robust SCUC solutions. The proposed multi-band robust SCUC model is solved by Benders decomposition (BD) and outer approximation (OA), while taking the advantage of integral property of the proposed multi-band uncertainty set. In addition, several accelerating techniques are developed for enhancing the computational performance and the convergence speed. Numerical studies on a 6-bus system and the modified IEEE 118-bus system verify the effectiveness of the proposed robust SCUC approach for enhancing uncertainty modeling capabilities and mitigating conservativeness of the robust SCUC solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Adaptive-Importance-Sampling-Enhanced Bayesian Approach for Topology Estimation in an Unbalanced Power Distribution System

The reliable operation of a power distribution system relies on a good prior knowledge of its topology and its system state. Although crucial, due to the lack of direct monitoring devices on the switch statuses, the topology information is often unavailable or outdated for the distribution system operators for real-time applications. Apart from the limited observability of the power distribution system, other challenges are the nonlinearity of the model, the complicated, unbalanced structure of the distribution system, and the scale of the system. To overcome the above challenges, we, in this paper, propose a Bayesian-inference framework that allows us to simultaneously estimate the topology and the state of a three-phase, unbalanced power distribution system. Specifically, by using the very limited number of measurements available that are associated with the forecast load data, we efficiently recover the full Bayesian posterior distributions of the system topology under both normal and outage operation conditions. This is performed through an adaptive importance sampling procedure that greatly alleviates the computational burden of the traditional Monte-Carlo (MC)-sampling-based approach while maintaining a good estimation accuracy. The simulations conducted on the IEEE 123-bus test system and an unbalanced 1282-bus system reveal the excellent performances of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LLM-Based Adaptive Distribution Voltage Regulation Under Frequent Topology Changes: An In-Context MPC Framework

This paper proposes a large language model (LLM) based adaptive inverter control for distribution voltage regulation under frequent topology changes. We leverage the ability of the LLM to perform in-context learning and create a topology-adaptive surrogate model for power flow calculation. The surrogate model is then integrated with a long short-term memory-based load forecaster and a model predictive control (MPC) scheme to achieve the optimal inverter control that adapts to frequent topology changes. Unlike many existing works that assume fixed-topology grids or require the knowledge of all possible topologies when training a model, the proposed in-context MPC method tackles the distribution voltage control problem under various topologies and adapts to unknown topologies with limited data requirement for fine-tuning. The effectiveness of our method is demonstrated on a modified IEEE 123-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Grid Simulator For Human Factor Research

The developed code simulates real-time monitor and control for west area of IEEE 118-bus system. The 24-hour load profile for each bus is derived by scaling the system’s rated load in the PSSE sav file according to the California Independent System Operator’s Day-ahead load forecast for May 1, 2024. This simulator performs several critical functions: (1) Calculating time-series power flow every 4 seconds; (2) Updating and dispatching AGC signals every minute; (3) Conducting N-1 contingency analysis every 5 minutes. Additionally, the simulator can trip lines and subsequently update and dispatch AGC signals, running power flow analysis after each tripping event.

Huang, Jianqiao [Idaho National Laboratory (INL), ↗

Mastering Uncertainty and Risk at Multiple Time Scales in the Future Electrical Grid

Today's electrical grids enjoy a relatively clean separation of spatio-temporal scales yielding a compartmentalization of grid design, optimization, control and risk assessment allowing for the use of conventional mathematical tools within each area. In contrast, the future grid will incorporate time-intermittent renewable generation, operate via faster electrical markets, and tap the latent control capability at finer grid modeling scales; creating a fundamentally new set of couplings across spatiotemporal scales and requiring revolutionary advances in mathematics techniques to bridge these scales. One example is found in decade-scale grid expansion planning in which today's algorithms assume accurate load forecasts and well-controlled generation. Incorporating intermittent renewable generation creates fluctuating network flows at the hourly time scale, inherently linking the ability of a transmission line to deliver electrical power to hourly operational decisions. New operations-based planning algorithms are required, creating new mathematical challenges. Spatio-temporal scales are also crossed when the future grid's minute-scale fluctuations in network flows (due to intermittent generation) create a disordered state upon which second-scale transient grid dynamics propagate effectively invalidating today's on-line dynamic stability analyses. Addressing this challenge requires new on-line algorithms that use large data streams from new grid sensing technologies to physically aggregate across many spatial scales to create responsive, data-driven dynamic models. Here, we sketch the mathematical foundations of these problems and potential solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long Island Smart Energy Corridor

The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Savings Lifetimes and Persistence

This technical brief explains the concepts of energy savings lifetimes and savings persistence and discusses how program administrators use these factors to calculate savings for efficiency measures, programs and portfolios. Savings lifetime is the length of time that one or more energy efficiency measures or activities save energy, and savings persistence is the change in savings throughout the functional life of a given efficiency measure or activity. Savings lifetimes are essential for assessing the lifecycle benefits and cost effectiveness of efficiency activities and for forecasting loads in resource planning. The brief also provides estimates of savings lifetimes derived from a national collection of costs and savings for electric efficiency programs and portfolios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Time-Varying Value of Energy Efficiency in Michigan

Quantifying the time-varying value of energy efficiency is necessary to properly account for all of its benefits and costs and to identify and implement efficiency resources that contribute to a low-cost, reliable electric system. Historically, most quantification of the benefits of efficiency has focused largely on the economic value of annual energy reduction. Due to the lack of statistically representative metered end-use load shape data in Michigan (i.e., the hourly or seasonal timing of electricity savings), the ability to confidently characterize the time-varying value of energy efficiency savings in the state, especially for weather-sensitive measures such as central air conditioning, is limited. Still, electric utilities in Michigan can take advantage of opportunities to incorporate the time-varying value of efficiency into their planning. For example, end-use load research and hourly valuation of efficiency savings can be used for a variety of electricity planning functions, including load forecasting, demand-side management and evaluation, capacity planning, long-term resource planning, renewable energy integration, assessing potential grid modernization investments, establishing rates and pricing, and customer service (KEMA 2012). In addition, accurately calculating the time-varying value of efficiency may help energy efficiency program administrators prioritize existing offerings, set incentive or rebate levels that reflect the full value of efficiency, and design new programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A GENERIC MICROGRID CONTROLLER

The main objective of this project was to develop and test a Generic Microgrid Controller (GMC) that provides (1) seamless islanding and reconnection of the microgrid, (2) efficient, reliable, and resilient operation of the microgrid with the required power quality, whether islanded or grid-connected, (3) existing and future ancillary services to the larger grid, (4) the capability for the microgrid to serve the resiliency needs of participating communities, (5) communication with the electric grid utility as a single controllable entity, and (6) increased reliability, efficiency and reduced emissions. The GMC developed under this project was designed to facilitate the deployment of microgrids, to be easily adapted to various microgrid configurations, and reduce up-front engineering costs associated with the design and development of microgrid controllers. Specifically, the GMC: 1. Provides a control structure amenable to accommodating an array of microgrid configurations and a portfolio of functional requirements; 2. Possesses a high level architecture that can readily be adopted by commercial suppliers; 3. Supports unlimited nesting of conforming microgrid control schemes; 4. Integrates into a full-featured Energy Management System (EMS) as a module. A select set of microgrids, operating a variety of microgrid configurations, served as “collaborating microgrid partners” in the project and assured thereby that the GMC developed under this program can readily be applied to microgrids of different sizes, and equipped with various resources, attributes, and equipment. Collaborating microgrid partners included the UCI Medical Center), the Port of Los Angeles, Port of Long Beach, and the Irvine Ranch Water District. The objectives of the project were achieved in two phases: (Phase I) Research, Development and Design (“Design”), and (Phase II) Testing, Evaluation, and Verification (“TEV”). In Phase I, specifications were developed for the GMC and a detailed test plan was established to test the functional requirements of the GMC. The GMC addresses two core functions, transition and dispatch, as well as several optional higher level functions such as economic dispatch, and renewable and load forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Offshore Wind Project Study (Final Technical Report)

Within the Long Island electric service territory and throughout New York State there is increasing interest in and mandate for increasing clean energy technologies and renewable energy generation while reducing dependency on fossil fuels for electric production with goal of a carbon free system by 2040. This report discusses the implications of the reduction of forecasted load in the Long Island electric service territory and the impact of energy efficiency; increasing reliance of wind and other renewable resources on the transmission system; opportunities for interconnecting these resources; and reductions on the reliance of baseload fossil fueled power facilities over the coming years.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing changes in peak demand from building and transportation electrification with energy efficiency [Slides]

The Department of Energy funded Berkeley Lab to provide technical assistance to two municipal utilities on how energy efficiency and demand flexibility can mitigate the peak demand impacts of building and transportation electrification. Berkeley Lab worked with these utilities, Sacramento Municipal Utility District (SMUD) and Fort Collins Utilities, to identify research questions that supported their planning needs. For both utilities, Berkeley Lab developed scenario-based load forecasts that considered baseline and high-efficiency building electrification. For SMUD, the forecast also explored the sensitivity of peak demand to extreme weather (a winter cold snap) at the system-level. For Fort Collins Utilities, the forecast addressed the impacts of low, medium, and high levels of building and transportation technology adoption on select distribution feeders. Berkeley Lab is also developing a guidance document for utilities that will draw on lessons learned from the technical assistance and provide a framework for conducting similar analyses.

24 POWER TRANSMISSION AND DISTRIBUTION↗