SEARCH · Search NASA
Results for “MSL”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
AEGIS autonomous targeting for ChemCam on MSL: results from a year of science team use
UNKNOWN
MSL Telecom Automated Anomaly Detection
Deformation in the form of natural hazards like earthquakes, volcanic eruptions and landslides, to ecosystem disturbances, to changes in the cryosphere (measurements of polar ice caps, ice sheets and sea ice).
Commanding Curiosity from the couch: MSL remote operations, challenges, and path ahead
UNKNOWN
Commanding Curiosity from the Couch : MSL Remote Operations, Challenges, and Path Ahead
No abstract provided
The Chemistry and Mineralogy (CheMin) X-Ray Diffractometer on the MSL Curiosity Rover: A Decade of Mineralogy From Gale Crater, Mars
For more than a decade, the CheMin X-ray diffraction instrument on the Mars Science Laboratory rover Curiosity has been returning definitive and quantitative mineralogical and mineral-chemistry data from ~3.5-billion-year-old (Ga) sediments in Gale crater, Mars. To date, 40 drilled rock samples and 3 scooped soil samples have been analyzed during the rover’s 30+ km transit. These samples document the mineralogy of over 800 meters of flat-lying fluvial, lacustrine and aeolian sedimentary rocks that comprise the lower strata of the central mound of Gale crater (Aeolis Mons; informally known as Mt. Sharp) and the surrounding plains (Aeolis Palus, informally known as the Bradbury Rise). The principal mineralogy of the sedimentary rocks is basaltic, with evidence of early and late-stage diagenetic overprinting. The rocks in many cases preserve much of their primary mineralogy and sedimentary features, suggesting that they were never strongly heated or deformed. Using aeolian soil composition as a proxy for the composition of the deposited and lithified sediment, it appears that in many cases diagenetic changes observed are principally isochemical. Exceptions to this trend include secondary nodules, calcium sulfate veining, and rare Si-rich alteration halos. A surprising and yet poorly understood observation is that nearly all the ~3.5 Ga sedimentary rocks analyzed to date contain 15-70 wt.% of X-ray amorphous material. Over-all, this >800-meter section of sedimentary rock explored in lower Mt. Sharp documents a perennial shallow lake environment grading upward into alternating lacustrine/fluvial and aeolian environments, many of which would have been habitable to microbial life.
Observed Correlation Between Local Topography and Passive Neutron Measurements from the Dynamic Albedo of Neutrons (DAN) Instrument on the Mars Science Laboratory (MSL) Rover
The Dynamic Albedo of Neutrons (DAN) instrument on the Mars Science Laboratory Curiosity rover primarily measures neutrons that have undergone interactions with rocks and materials in the rover's local environment. As the rover ascends Aeolis Mons, it may encounter more extreme local topography (e.g., cliffs, gullies, canyons). We present three parts of the rover's traverse in which local topography, expressed as the average local relief relative to the rover, is moderately to strongly correlated with an increase in passive thermal neutron count rates. These increases in count rates are consistent with results from radiation transport models of the instrument's performance near simulated topographic features. Additional DAN measurements in areas of high average local relief (>0.25 m) within 5 m of the instrument could bolster this correlation. DAN's sensitivity to topography in its passive mode could be utilized as a new measurement capability and has implications for the operation of future landed missions carrying neutron spectrometers (e.g., VIPER, MoonRanger, Lunar-VISE).
Neighbors on the Red Planet: Mars Science Laboratory Relay Coordination Post InSight Arrival
The Mars Science Laboratory (MSL) strategic communications planning toolset selects orbiter relay opportunities that the rover will use for transmitting data back to Earth. The toolset was extensively reworked in preparation for the Interior Exploration using Seismic Investigations, Geodesy and Heat Transport's (InSight) arrival at Mars in November 2018 and the regular use of Mars Atmosphere and Volatile Evolution (MAVEN) and Trace Gas Orbiter (TGO) orbiters as relay assets in addition to Mars Reconnaissance Orbiter (MRO) and 2001 Mars Odyssey (ODY). Overflight selection criteria was automated in the new toolset to take into account overflight deconfliction and down-selection as well as tactical timeline planning impacts and total data return. This was done while remaining flexible and configurable for changing mission priorities. As the Curiosity rover ages, the MSL planning team must overcome issues such as reduced budgets, memory bank anomalies, and reduced power availability. These are some examples of factors that affect the strategic communications planning toolset. In addition to adapting to evolving internal mission needs, the toolset must also be flexible to changes in the relay planning interface with other landers. The concept of shared relay or “split passes” was introduced when InSight began operating on Mars just 600 kilometers away and at the same longitude as MSL. This proximity meant that orbiters could now communicate with two landers during the same relay session. Over time, this new operational use-case became common practice as InSight and MSL settled into relay planning negotiations. Today, many TGO relay sessions are shared between MSL and InSight. As more orbiters pursue integrating this capability into nominal relay operations, and more landers arrive on Mars, the strategic communications process and toolsets increases in complexity. Development of a single tool that schedules relay sessions for all orbiters and landers simultaneously may become necessary as the number of Martian spacecraft increases. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper.
Mars Science Laboratory: Entry, Descent, and Landing System Performance
In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.
Mars Science Laboratory: Entry, Descent, and Landing System Performance
In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.
Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System
In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.
Entry Abort Determination Using Non-Adaptive Neural Networks for Mars Precision Landers
The 2009 Mars Science Laboratory (MSL) will attempt the first precision landing on Mars using a modified version of the Apollo Earth entry guidance program. The guidance routine, Entry Terminal Point Controller (ETPC), commands the deployment of a supersonic parachute after converging the range to the landing target. For very dispersed cases, ETPC may not converge the range to the target and safely command parachute deployment within Mach number and dynamic pressure constraints. A full-lift up abort can save 85% of these failed trajectories while abandoning the precision landing objective. Though current MSL requirements do not call for an abort capability, an autonomous abort capability may be desired, for this mission or future Mars precision landers, to make the vehicle more robust. The application of artificial neural networks (NNs) as an abort determination technique was evaluated by personnel at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC). In order to implement an abort, a failed trajectory needs to be recognized in real time. Abort determination is dependent upon several trajectory parameters whose relationships to vehicle survival are not well understood, and yet the lander must be trained to recognize unsafe situations. Artificial neural networks (NNs) provide a way to model these parameters and can provide MSL with the artificial intelligence necessary to independently declare an abort. Using the 2009 Mars Science Laboratory (MSL) mission as a case study, a non-adaptive NN was designed, trained and tested using Monte Carlo simulations of MSL descent and incorporated into ETPC. Neural network theory, the development history of the MSL NN, and initial testing with severe dust storm entry trajectory cases are discussed in Reference 1 and will not be repeated here. That analysis demonstrated that NNs are capable of recognizing failed descent trajectories and can significantly increase the survivability of MSL for very dispersed cases. NN testing was then broadened to evaluate fully dispersed entry trajectories. The NN correctly classified 99.7% of descent trajectories as abort or nonabort and reduced the probability of an unsafe parachute deployment by 83%. This second, broader testing phase is discussed in this paper.
Application of Stereo PIV on a Supersonic Parachute Model
The Mars Science Laboratory (MSL) is the next step in NASA's Mars Exploration Program, currently scheduled for 2011. The spacecraft's descent into the Martian atmosphere will be slowed from Mach 2 to subsonic speeds via a large parachute system with final landing under propulsive control. A Disk-Band-Gap (DBG) parachute will be used on MSL similar to the designs that have been used on previous missions, however; the DBG parachute used by MSL will be larger (21.5 m) than in any of the previous missions due to the weight of the payload and landing site requirements. The MSL parachute will also deploy at higher Mach number (M 2) than previous parachutes, which can lead to instabilities in canopy performance. Both the increased size of the DBG above previous demonstrated configurations and deployment at higher Mach numbers add uncertainty to the deployment, structural integrity and performance of the parachute. In order to verify the performance of the DBG on MSL, experimental testing, including acquisition of Stereo Particle Imaging Velocimetry (PIV) measurements were required for validating CFD predictions of the parachute performance. A rigid model of the DBG parachute was tested in the 10x10 foot wind tunnel at GRC. Prior to the MSL tests, a PIV system had never been used in the 10x10 wind tunnel. In this paper we discuss some of the technical challenges overcome in implementing a Stereo PIV system with a 750x400 mm field-of-view in the 10x10 wind tunnel facility and results from the MSL hardshell canopy tests.