Search NASA⌕ Search

SEARCH · Search NASA

Results for “Manufactured solutions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Puncture-Healing Thermoplastic Resin Carbon-Fiber-Reinforced Composites

A composite comprising a combination of a self-healing polymer matrix and a carbon fiber reinforcement is described. In one embodiment, the matrix is a polybutadiene graft copolymer matrix, such as polybutadiene graft copolymer comprising poly(butadiene)-graft-poly(methyl acrylate-co-acrylonitrile). A method of fabricating the composite is also described, comprising the steps of manufacturing a pre-impregnated unidirectional carbon fiber preform by wetting a plurality of carbon fibers with a solution, the solution comprising a self-healing polymer and a solvent, and curing the preform. A method of repairing a structure made from the composite of the invention is described. A novel prepreg material used to manufacture the composite of the invention is described.

Gordon, Keith L.↗

Puncture-Healing Thermoplastic Resin Carbon-Fiber Reinforced Composites

A composite comprising a combination of a self-healing polymer matrix and a carbon fiber reinforcement is described. In one embodiment, the matrix is a polybutadiene graft copolymer matrix, such as polybutadiene graft copolymer comprising poly(butadiene)-graft-poly(methyl acrylate-co-acrylonitrile). A method of fabricating the composite is also described, comprising the steps of manufacturing a pre-impregnated unidirectional carbon fiber preform by wetting a plurality of carbon fibers with a solution, the solution comprising a self-healing polymer and a solvent, and curing the preform. A method of repairing a structure made from the composite of the invention is described. A novel prepreg material used to manufacture the composite of the invention is described.

Gordon, Keith L.↗

Thermal behavior spiral bevel gears

An experimental and analytical study of the thermal behavior of spiral bevel gears is presented. Experimental data were taken using thermocoupled test hardware and an infrared microscope. Many operational parameters were varied to investigate their effects on the thermal behavior. The data taken were also used to validate the boundary conditions applied to the analytical model. A finite element-based solution sequence was developed. The three-dimensional model was developed based on the manufacturing process for these gears. Contact between the meshing gears was found using tooth contact analysis to describe the location, curvatures, orientations, and surface velocities. This information was then used in a three-dimensional Hertzian contact analysis to predict contact ellipse size and maximum pressure. From these results, an estimate of the heat flux magnitude and the location on the finite element model was made. The finite element model used time-averaged boundary conditions to permit the solution to attain steady state in a computationally efficient manner.Then time- and position-varying boundary conditions were applied to the model to analyze the cyclic heating and cooling due to the gears meshing and transferring heat to the surroundings, respectively. The model was run in this mode until the temperature behavior stabilized. The transient flash temperature on the surface was therefore described. The analysis can be used to predict the overall expected thermal behavior of spiral bevel gears. The experimental and analytical results were compared for this study and also with a limited number of other studies. The experimental and analytical results attained in the current study were basically within 10% of each other for the cases compared. The experimental comparison was for bulk thermocouple locations and data taken with an infrared microscope. The results of a limited number of other studies were compared with those obtained herein and predicted the same basic behavior.

Handschuh, Robert F.↗

Waste Materials Recycling for In-Space Manufacturing

Logistics and resupply payloads for Lunar and Martian missions are significantly more cost and schedule prohibitive compared to LEO destinations. Recycling of waste and trash materials generated throughout the duration of a mission, as well as previous missions, will be critical for enabling sustained human presence beyond Earth. Currently, no solution exists for recycling waste materials back into feedstock form beyond entry-level hobbyist equipment, which is not suitable nor practical for space applications. There is already over 500,000 lbs of trash on the moon from previous missions, which will grow exponentially over the coming decade throughout the Artemis Campaign. Waste and trash materials are precious resources that, if recovered and properly processed, can be transformed back into usable feedstock form for on-demand manufacturing capabilities. Hence, it is prudent that a recycling solution be developed and infused into future missions.

additive↗

NASA's Composite Overwrap Lessons Learned on 40k Thrust Chamber Assemblies

Filament wound carbon fiber/polymer composite overwraps combined with additively manufactured (AM) copper alloy combustion chambers are a critical part of NASA’s Rapid Analysis and Manufacturing Propulsion Technology (RAMPT) project. The composite overwrap is a high strength-to-weight material and allows for significant weight reduction of the high-pressure thrust chamber assembly, reduction of overall cost, and reduced fabrication time while offering structural robustness. Integrated AM/composite overwrap chamber assemblies using 2,000 lbf (2k) and 7,000 lbf (7k) thrust were successfully hot fire tested at NASA Marshall Space Flight Center (MSFC). These assemblies allowed the team to learn lessons related to the design, analysis, and manufacturing of these integrated assemblies. A final goal of the RAMPT project is to design and test a 40,000 lbf (40k) thrust chamber assembly. The40k chamber presented the team several new challenges including an integral inlet port in the main body of the composite overwrap. Through multiple iterations of manufacturing techniques, varied materials, and Non-Destructive Evaluations (NDE), many lessons were learned to obtain a final design solution that would not only allow for the interrupted port inlet but also allow for sufficient material margins for the most critically stressed part of the chamber. This paper will cover the manufacturing techniques exploring fabric designs to help subsidize the coverage in the areas left bare by the inlet port during the filament winding process and custom tooling needed for the final full chamber processing. The original material choice of bismaleimide (BMI) 5250-4 from the 7k chamber performed well for the extreme environment of hot fire testing but proved to be difficult with the increased scale and interrupted port design of the 40kchamber. Discussion in this paper will cover these changes, including evaluation of the design, comparison to the prior 2k and 7k designs, and show the final hardware that will be tested. One primary goal of this work and RAMPT project is to provide this development process and data to industry for infusion into future engine designs.

Filament Wound↗

Positive electrode processing for Hughes NiH2 cells

The basic procedures were developed for the manufacture of nickel cadmium batteries. An electrochemical impregnation in an aqueous ethanol solution is used in this process. Several additional controls were instituted for production of flight electrodes, including a Hughes controlled MCD, a solution reserved exclusively for the impregnation of Hughes positive electrodes a system of complete traceability for individual electrodes, an electrical characterization test to provide information on weight and capacity at the plaque level, and a stress test to provide data on capacity, weight, and physical parameters at the electrode level.

Bleser, C. A.↗

Automated implementation of rule-based expert systems with neural networks for time-critical applications

In fault diagnosis, control and real-time monitoring, both timing and accuracy are critical for operators or machines to reach proper solutions or appropriate actions. Expert systems are becoming more popular in the manufacturing community for dealing with such problems. In recent years, neural networks have revived and their applications have spread to many areas of science and engineering. A method of using neural networks to implement rule-based expert systems for time-critical applications is discussed here. This method can convert a given rule-based system into a neural network with fixed weights and thresholds. The rules governing the translation are presented along with some examples. We also present the results of automated machine implementation of such networks from the given rule-base. This significantly simplifies the translation process to neural network expert systems from conventional rule-based systems. Results comparing the performance of the proposed approach based on neural networks vs. the classical approach are given. The possibility of very large scale integration (VLSI) realization of such neural network expert systems is also discussed.

Ramamoorthy, P. A.↗

Analysis of In-Space Assembly of Modular Systems

Early system-level life cycle assessments facilitate cost effective optimization of system architectures to enable implementation of both modularity and in-space assembly, two key Exploration Systems Research & Technology (ESR&T) Strategic Challenges. Experiences with the International Space Station (ISS) demonstrate that the absence of this rigorous analysis can result in increased cost and operational risk. An effort is underway, called Analysis of In-Space Assembly of Modular Systems, to produce an innovative analytical methodology, including an evolved analysis toolset and proven processes in a collaborative engineering environment, to support the design and evaluation of proposed concepts. The unique aspect of this work is that it will produce the toolset, techniques and initial products to analyze and compare the detailed, life cycle costs and performance of different implementations of modularity for in-space assembly. A multi-Center team consisting of experienced personnel from the Langley Research Center, Johnson Space Center, Kennedy Space Center, and the Goddard Space Flight Center has been formed to bring their resources and experience to this development. At the end of this 30-month effort, the toolset will be ready to support the Exploration Program with an integrated assessment strategy that embodies all life-cycle aspects of the mission from design and manufacturing through operations to enable early and timely selection of an optimum solution among many competing alternatives. Already there are many different designs for crewed missions to the Moon that present competing views of modularity requiring some in-space assembly. The purpose of this paper is to highlight the approach for scoring competing designs.

Moses, Robert W.↗

Bacteria Provide Cleanup of Oil Spills, Wastewater

Through Small Business Innovation Research (SBIR) contracts with Marshall Space Flight Center, Micro-Bac International Inc., of Round Rock, Texas, developed a phototrophic cell for water purification in space. Inside the cell: millions of photosynthetic bacteria. Micro-Bac proceeded to commercialize the bacterial formulation it developed for the SBIR project. The formulation is now used for the remediation of wastewater systems and waste from livestock farms and food manufacturers. Strains of the SBIR-derived bacteria also feature in microbial solutions that treat environmentally damaging oil spills, such as that resulting from the catastrophic 2010 Deepwater Horizon oil rig explosion in the Gulf of Mexico.

Source record↗

Validation of Minimum Display Requirements for a UAS Detect and Avoid System

The full integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS), a prerequisite for enabling a broad range of public and commercial UAS operations, presents several technical challenges to UAS developers, operators and regulators. A primary barrier is the inability for UAS pilots (situated at a ground control station, or GCS) to comply with Title 14 Code of Federal Regulations sections 91.111 and 91.113, which require pilots to “see and avoid” other aircraft in order to maintain well clear. UAS pilots’ removal from the flight deck of the aircraft necessitates the development of a UAS-specific system for detecting nearby traffic and displaying traffic information to the pilot to support their ability to maintain an objectively defined “DAA well clear” threshold from other aircraft. This new UAS-specific function of remaining DAA well clear is called traffic avoidance. The resulting Detect and Avoid (DAA) system, however, will be subject to a collection of requirements that manufacturers will be obligated to meet in order to certify their equipment. RTCA Special Committee 228 (SC-228), a consortium of representatives from government, industry and academia, is responsible for developing and documenting the Minimum Operational Performance Standards (MOPS) for UAS DAA systems. The present study is the final in a series of human-in-the-loop (HITL) experiments designed to explore and test the various display and alerting requirements being incorporated into the DAA MOPS. Whereas the prior DAA HITLs examined a wide variety of DAA display features and concepts, the current experiment aims to validate the latest minimum display requirements for Phase 1 of the DAA MOPS. Rather than test different display concepts, this study tests two configurations of a MOPS-compatible DAA display: a version that is integrated into the primary navigation and control display of the GCS and a version that is physically separated from the primary display. This manipulation tests the draft minimum requirement that allows the DAA traffic display to be a separate, or standalone, configuration. This type of configuration is a more achievable near-term technology solution since it does not stipulate additional certification or integration requirements on UAS manufacturers. However, a standalone display configuration has the potential to result in pilot performance issues resulting from the cognitive costs of switching between the primary DAA display and the primary navigation and control display. This configuration is also particularly susceptible to errors if the displays are in different orientations (e.g., north-up versus track-up). Both the integrated and standalone display configurations were presented to 16 active UAS pilots in a medium-fidelity simulation, which included confederate air traffic controllers and pseudo pilots operating simulated manned traffic. Pilots were tasked with navigating two different mission routes while maintaining DAA well clear with scripted conflicts. Pilot response times (i.e., measured response) and ability to remain DAA well clear are reported. Primary results indicate that both display configurations resulted in favorable response times and well clear rates. While there were clear trends of pilots objectively performing better in the integrated display condition, with several measured response metrics reaching statistical significance, the differences between the two displays were typically moderate. While the primary variable of DAA display location did not have an especially large impact on pilot performance on its own, when examined alongside the type of DAA threat the pilot was facing (a caution-level versus a warning-level alert), the response time benefits associated with the integrated display were amplified. The implications of these American Institute of Aeronautics and Astronautics 2 results on the Phase 1 DAA MOPS and the connection of this data to previous studies is also discussed.

detect and avoid↗

Manufacturing Process Development of a Carbon Fiber Reinforced Polymer Composite Shaft for Electric Motors

Electric aircraft applications require electric motors with increased specific power and efficiency. Composite structural components in motors are a potential solution for reducing motor mass, reducing magnetic losses, and limiting undesired conduction paths for fault, electromagnetic interference, or common-mode currents. In this report, manufacturing trials for a high-speed carbon fiber reinforced polymer composite motor shaft are presented. Four prototype shafts were produced using a hybrid biaxial/triaxial fabric that was circumferentially wrapped onto an additively manufactured high-temperature washout mandrel. An additional traditional overbraid approach was also evaluated and shows promise for high-rate, high-performance parts using automated manufacturing. This paper discusses the shaft design, manufacturing methods explored, material selection, the manufacturing trials, and the lessons learned. The results of this manufacturing investigation show feasibility for manufacturing composite shafts for electric motors.

Electric moto shaft↗

Inverse kinematic solution for near-simple robots and its application to robot calibration

This paper provides an inverse kinematic solution for a class of robot manipulators called near-simple manipulators. The kinematics of these manipulators differ from those of simple-robots by small parameter variations. Although most robots are by design simple, in practice, due to manufacturing tolerances, every robot is near-simple. The method in this paper gives an approximate inverse kinematics solution for real time applications based on the nominal solution for these robots. The validity of the results are tested both by a simulation study and by applying the algorithm to a PUMA robot.

Hayati, Samad A.↗

Overview of MSFC Additive Electronics Capabilities

Focus: Marshall seeks to support the Agency in the development of next generation printed electronics technologies for living and working in space, with emphasis on enhanced electronics manufacturing processes and capabilities development on the ground and in-space. Near-Term: Human Habitation Elements and Life Support Systems - pursuing integrated flexible wearable air, water, vital monitoring solutions for next generation printed technologies; Complete startup printing technology demonstrations which prove basic processes and establish ISM (In-Space Manufacturing) infrastructure needed for future applications including metals based manufacturing. Medium Term: Target low-cost research and demonstration activities that support multi-material additive manufacturing, more sophisticated parts production, printed electronics and ISM; Maturation and flight demonstration of printed propulsion system components, with emphasis on infusion into small-spacecraft-based missions. Long-Term: Evolve systems capabilities to be supportive of destination (lunar or Mars) resources and requirements, increase autonomy in systems and utilize in-situ resources towards manufacturing; Support development of self-replicable systems and their infusion into future spacecraft and missions.

MacLeod, Todd C.↗

Minimizing distortion in truss structures - A Hopfield network solution

Distortions in truss structures can result from random errors in element lengths that are typical of a manufacturing process. These distortions may be minimized by an optimal selection of elements from those available for placement between the prescribed nodes - a combinatorial optimization problem requiring significant investment of computational resource for all but the smallest problems. The present paper describes a formulation in which near-optimal element assignments are obtained as minimum-energy stable states, of an analogous Hopfield neural network. This requires mapping of the optimization problem into an energy function of the appropriate Liapunov form. The computational architecture is ideally suited to a parallel processor implementation and offers significant savings in computational effort. A numerical implementation of the approach is discussed with reference to planar truss problems.

Fu, B.↗

Minimizing distortion in truss structures -- a Hopfield network solution

Distortions in truss structures can result from random errors in elemental lengths that are typical of a manufacturing process. These distortions may be minimized by an optimal selection of elements from those available for placement between the prescribed nodes -- a combinatorial optimization problem requiring significant investment of computational resource for all but the smallest problems. The present paper describes a formulation in which near-optimal element assignments are obtained as minimum energy, stable states, of an analogous Hopfield neural network. This requires mapping of the optimization problem into an energy function of the appropriate Lyapunov form. The computational architecture is ideally suited to a parallel processor implementation and offers significant savings in computational effort. A numerical implementation of the approach is discussed with reference to planar truss problems.

Fu, B.↗

Making & Breaking the Rules for DED Design

Design for Additive Manufacturing (DfAM) is widely used to describe design activities and guidelines employed in the creation of Additively Manufactured (AM) parts. Basic design rules for widely adopted processes like Powder Bed Fusion (PBF) are relatively understood including material performance, part size constraints, self-supporting angles, overhangs, wall thicknesses, and feature resolution. Complexity is often inherent with PBF using organically inspired solutions through generative design and topology optimization software to create designs that often cannot be realized via traditional manufacturing processes. The design rules for Directed Energy Deposition (DED) are less well known, and, in some cases, the lack of understanding is likely inhibiting broader application of the various DED processes. This presentation covers key design rules for DED fusion processes and elucidates opportunities like multi-material deposition and build approaches ranging from basic features to complex large-scale parts. Complementary to the opportunistic characteristics of DfAM for DED, Manufacture for AM (MfAM) encompasses the restrictive aspects of the manufacturing lifecycle with limitations due to bead width and wall thickness, self-supporting angles, surface texture, microstructural evolution, and residual stresses. AM enabled part design must always consider the entire value chain starting with incoming feedstock (e.g. plate, wire, or powder) and progressing through the printing process, post-processing (e.g. machining, inspection), and final system assembly. Key considerations, like the tradeoffs between feature resolution and build rate, for process and part selection and economic assessments will be discussed as DED is often traded against other AM processes. After highlighting typical DED design rules, we will also show how some of those rules can be broken via use cases and part designs that span the full spectrum of DED processes with examples of various DED part designs.

Additive Manufacturing↗

Concept of Operations Visualization for Ares I Production

Establishing Computer Aided Design models of the Ares I production facility, tooling and vehicle components and integrating them into manufacturing visualizations/simulations allows Boeing and NASA to collaborate real time early in the design/development cycle. This collaboration identifies cost effective and lean solutions that can be easily shared with Ares stakeholders (e.g., other NASA Centers and potential science users). These Ares I production visualizations and analyses by their nature serve as early manufacturing improvement precursors for other Constellation elements to be built at the Michoud Assembly Facility such as Ares V and the Altair Lander. Key to this Boeing and Marshall Space Flight Center collaboration has been the use of advanced virtual manufacturing tools to understand the existing Shuttle era infrastructure and trade potential modifications to support Ares I production. These approaches are then used to determine an optimal manufacturing configuration in terms of labor efficiency, safety and facility enhancements. These same models and tools can be used in an interactive simulation of Ares I and V flight to the Space Station or moon to educate the human space constituency (e.g., government, academia, media and the public) in order to increase national and international understanding of Constellation goals and benefits.

Chilton, Jim↗

Ares V: Progress Toward Unprecedented Heavy Lift

Ares V represents the vehicle that will again make possible human exploration beyond low Earth orbit. The Ares V is part of NASA s Constellation Program architecture developed to support the International Space Station (ISS), establish a permanent human presence on the Moon, and explore it to an extent far greater than was possible with the Apollo Program. Ares V will carry the lunar lander to orbit where it will join the Orion crew spacecraft, launched by the smaller Ares I launch vehicle. Then the Ares V upper stage will send the Orion and lander to the Moon. Ares V is also intended to launch automated cargo landers to the Moon. The Ares vehicles are designed to employ the proven technologies and experience from the Space Shuttle, Delta IV, and earlier U.S. programs, as well as sharing common components where feasible. The Ares V is in an early stage of concept development. However, commonality allows it to benefit from development work already under way on the Ares I, including the first stage booster, and upper stage, J-2X upper stage engine. This paper will discuss progress to date on the Ares V and its potential for freeing payload designers from current mass and volume constraints. Progress includes development progress on Ares I elements that will be shared by the two launch vehicles. The Ares I first stage recently completed a successful test firing of Development Motor 1 (DM-1). The J-2X engine is proceeding with manufacturing of components for the first development engines that will be used for testing. Several component-level tests have been completed or are under way that will help verify designs and confirm solutions to design challenges. The Ares V Earth departure stage will benefit from the Ares I upper stage development, including design, manufacturing, and materials testing. NASA is also working with government and industry to collect data on flights and testing of the operational RS-68 engine and potential upgrades. The Ares V team continues to evaluate technical options, vehicle configurations, and operations concepts for the Ares V. The team recently completed a Fall Face-to-Face meeting that served as a stepping-stone to the Systems Requirements Review (SRR). This four-day meeting served as an information exchange for the various teams at several NASA field centers and supporting contractors.

Sumrall, Phil↗