Search NASA⌕ Search

SEARCH · Search NASA

Results for “National”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Use and applicability of the vegetation component of the national site classification system

Existing vegetation on a site in Sumter National Forest, South Carolina was classified using high altitude aerial optical bar color infrared photography in an effort to determine if the National Site Classification (NSC) system could be used in the heterogeneously forested southeastern United States where it had not previously been used. Results show that the revised UNESCO international classification and mapping of vegetation system, as incorporated into the NSCS, is general enough at the higher levels and specific enough at the lower levels to adequately accommodate densely forested, heterogeneous areas as well as the larger, more homogeneous regions of the Pacific Northwest. The major problem is of existing vegetation versus natural vegetation.

Clark, C. A.↗

1983 lightning, turbulence, wind shear, and Doppler radar studies at the National Severe Storms Laboratory

As part of continuing research on aviation related weather hazards, numerous experiments were incorporated into the 1983 Spring Observation Program. This year's program was an abbreviated one because of commitments made to the development of the Next Generation Radar (NEXRAD) project. The National Oceanic and Atmospheric Administration's (NOAA) P-3 Orion and the National Aeronautics and Space Administration's (NASA) RB-57B and U-2 were the main aircraft involved in the studies of lightning, wind shear, turbulence, and storm structure. A total of 14 flights were made by these aircraft during the period of May 16 through June 5, 1983. Aircraft instrumentation experiments are described, and resultant data sets available for research are detailed. Aircraft instrumentation and Doppler radar characteristics are detailed.

Lee, J. T.↗

Space industrialization: A national perspective

Space industrialization (or commercialization) has the potential to be a major player in America's space program. If this potential is to be realized, however, industrialization efforts must be considered within the context of the other major portions of the space program: shuttle, space station, and civil remote sensing. Further, development efforts must be based upon a sound scientific and technical understanding of the products and processes, and there must be a trained cadre of dedicated individuals willing to devote time and effort to this effort. There remain considerable risks and uncertainties. Given all this, the best path to follow would seem to be a long term, balanced commitment, emphasizing government, industry, and academia partnerships. Several points are addressed: (1) the place of space industrialization in the overall national space program; (2) the meaning of space industrialization with respect to the historic, national aims of space; and (3) specifically what is being industrialized.

Reis, V. H.↗

Status of the National Space Transportation System

The National Space Transportation System is a national resources serving the government, Department of Defense and commercial needs of the USA and others. Four orbital flight tests were completed July 4, 1982, and the first Operational Flight (STS-5) which placed two commercial communications into orbit was conducted November 11, 1982. February 1983 marked the first flight of the newest orbiter, Challenger. Planned firsts in 1983 include: use of higher performance main engines and solid rocket boosters, around-the-clock crew operations, a night landing, extra-vehicular activity, a dedicated DOD mission, and the first flight of a woman crew member. By the end of 1983, five commercial payloads and two tracking and data relay satellites should be deployed and thirty-seven crew members should have made flights aboard the space shuttle.

Abrahamson, J. A.↗

Computer integration of engineering design and production: A national opportunity

The National Aeronautics and Space Administration (NASA), as a purchaser of a variety of manufactured products, including complex space vehicles and systems, clearly has a stake in the advantages of computer-integrated manufacturing (CIM). Two major NASA objectives are to launch a Manned Space Station by 1992 with a budget of $8 billion, and to be a leader in the development and application of productivity-enhancing technology. At the request of NASA, a National Research Council committee visited five companies that have been leaders in using CIM. Based on these case studies, technical, organizational, and financial issues that influence computer integration are described, guidelines for its implementation in industry are offered, and the use of CIM to manage the space station program is recommended.

Source record↗

National space transportation and support study/mission requirements and architecture studies

The government approach to fulfilling the requirements of the National Space Transportation and Support Study is described. DOD and NASA were required to determine the architecture and technology that would be needed for civil and defense space transportation during the 1995-2010 time range. NASA collected data from the National Commission on Space and the DOD research focused on SDI requirements. The objectives and recommendations of the space transportation architecture, transportation and support systems, and technology assessment and planning tasks are discussed.

Durocher, C. L.↗

Report of the Committee on the Space Station of the National Research Council

The Space Station Program will be the most ambitious space project the nation has ever undertaken; will require tens of billions of dollars; and will entwine for many years the space program with those of international partners. It must have enduring stable support across administrations, and the support must be generous. The current Space Shuttle is barely adequate for the limited purpose of deploying the Space Station, and it is inadequate to meet broader national needs in space. The Committee recommends in the strongest terms that the Shuttle be upgraded with new improved solid rocket motors, that it be supplemented with expendable launch vehicles, and that a heavy lift launch vehicle be developed for use in the latter half of the 1990s. The Committee strongly recommends that NASA prepare a new Space Station Program cost estimate in conjunction with the Program Requirements Review scheduled for early next year by NASA. The exercise should address the full range of uncertainties in the current Program, some of which are discussed in the report.

Source record↗

Testing and checkout experiences in the National Transonic Facility since becoming operational

The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

Bruce, W. E., Jr.↗

National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program 1988, volume 1

The 1988 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began in 1965 at JSC and in 1964 nationally, are (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objectives of the NASA Centers.

Bannerot, Richard B.↗

National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program 1988, volume 2

The 1988 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston and JCS. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began in 1965 at JSC and in 1964 nationally, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objectives of the NASA Centers.

Bannerot, Richard B.↗

Fueling the National Aero-Space Plane with slush hydrogen

The National Aerospace Plane is a horizontal take off and landing, single stage-to-orbit vehicle using hydrogen as the fuel. The first flights are planned for the mid 1990s. The high heating value, cooling capacity, and combustion properties make hydrogen the fuel of choice, but the low density results in a large vehicle. Both the fuel cooling capacity and density are increased with the use of slush hydrogen and result in significant reductions in size of the vehicle. A national program to advance this technology and to find engineering solutions to the many design issues is now underway.

Hannum, Ned P.↗

Slush Hydrogen (SLH2) technology development for application to the National Aerospace Plane (NASP)

The National Aerospace Plane (NASP) program is giving us the opportunity to reach new unique answers in a number of engineering categories. The answers are considered enhancing technology or enabling technology. Airframe materials and densified propellants are examples of enabling technology. The National Aeronautics and Space Administration's Lewis Research Center has the task of providing the technology data which will be used as the basis to decide if slush hydrogen (SLH2) will be the fuel of choice for the NASP. The objectives of this NASA Lewis program are: (1) to provide, where possible, verified numerical models of fluid production, storage, transfer, and feed systems, and (2) to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. This program is a multiyear multimillion dollar effort. The present pursuit of the above listed objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. The NASA Lewis overall program plan is summarized. The initial implementation of the plan will be unfolded and the present level of efforts in each of the resource areas will be discussed. Results already in hand will be pointed out. A description of additionally planned near-term experimental and analytical work is described.

Dewitt, Richard L.↗

National Educators' Workshop: Update 1989 Standard Experiments in Engineering Materials Science and Technology

Presented here is a collection of experiments presented and demonstrated at the National Educators' Workshop: Update 89, held October 17 to 19, 1989 at the National Aeronautics and Space Administration, Hampton, Virginia. The experiments related to the nature and properties of engineering materials and provided information to assist in teaching about materials in the education community.

Gardner, James E.↗

US Forest Service and National Park Service Wilderness Aircraft Overflight Study: Sociological background and study plans

The background and sociological aspects of the combined U.S. Forest Service and National Park Service Wilderness Aircraft Overflight Study (WACOS) are presented. The WACOS broaches a new area of research by combining aspects of outdoor recreation sociology and aircraft noise response studies. The tasks faced create new challenges and require innovative solutions. Background information on the WACOS is presented with special emphasis on sociological considerations. At the time of this writing, no data have yet been collected, so this paper will present background information, related issues, and plans for data collection. Some recent studies indicate that managers of Forest Service wildernesses and National Park Service areas consider aircraft overflights to be a problem to their users in some areas. Additional relevant background research from outdoor recreation sociology is discussed, followed by presentation of the authors' opinions of the most salient sociological issues faced by this study. The goals and desired end products are identified next, followed by a review of the methods anticipated to be used to obtain these results. Finally, a discussion and conclusion section is provided.

Harrison, Robin T.↗

National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1989, volume 1

The 1989 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by Texas A and M University and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began nationally in 1964 and at JSC in 1965, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objective of the NASA Centers.

Jones, William B., Jr.↗

National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1989, volume 2

The 1989 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by Texas A and M University and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began nationally in 1964 and at JSC in 1965, are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objective of the NASA Centers.

Jones, William B., Jr.↗

National Transonic Facility model and model support vibration problems

Vibrations of models and model support system were encountered during testing in the National Transonic Facility. Model support system yaw plane vibrations have resulted in model strain gage balance design load limits being reached. These high levels of vibrations resulted in limited aerodynamic testing for several wind tunnel models. The yaw vibration problem was the subject of an intensive experimental and analytical investigation which identified the primary source of the yaw excitation and resulted in attenuation of the yaw oscillations to acceptable levels. This paper presents the principal results of analyses and experimental investigation of the yaw plane vibration problems. Also, an overview of plans for development and installation of a permanent model system dynamic and aeroelastic response measurement and monitoring system for the National Transonic Facility is presented.

Young, Clarence P., Jr.↗

National Space Transportation System (NSTS) technology needs

The National Space Transportation System (NSTS) is one of the Nation's most valuable resources, providing manned transportation to and from space in support of payloads and scientific research. The NSTS program is currently faced with the problem of hardware obsolescence, which could result in unacceptable schedule and cost impacts to the flight program. Obsolescence problems occur because certain components are no longer being manufactured or repair turnaround time is excessive. In order to achieve a long-term, reliable transportation system that can support manned access to space through 2010 and beyond, NASA must develop a strategic plan for a phased implementation of enhancements which will satisfy this long-term goal. The NSTS program has initiated the Assured Shuttle Availability (ASA) project with the following objectives: eliminate hardware obsolescence in critical areas, increase reliability and safety of the vehicle, decrease operational costs and turnaround time, and improve operational capability. The strategy for ASA will be to first meet the mandatory needs - keep the Shuttle flying. Non-mandatory changes that will improve operational capability and enhance performance will then be considered if funding is adequate. Upgrade packages should be developed to install within designated inspection periods, grouped in a systematic approach to reduce cost and schedule impacts, and allow the capability to provide a Block 2 Shuttle (Phase 3).

Winterhalter, David L.↗