Search NASA⌕ Search

SEARCH · Search NASA

Results for “Next Steps”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Parameter Validation for Evaluation of Spaceflight Hardware Reusability

Within recent years, there has been an influx of companies around the world pursuing reusable systems for space flight. Much like NASA, many of these new entrants are learning that reusable systems are complex and difficult to acheive. For instance, in its first attempts to retrieve spaceflight hardware for future reuse, SpaceX unsuccessfully tried to land on a barge at sea, resulting in a crash-landing. As this new generation of launch developers continues to develop concepts for reusable systems, having a systematic approach for determining the most effective systems for reuse is paramount. Three factors that influence the effective implementation of reusability are cost, operability and reliability. Therefore, a method that integrates these factors into the decision-making process must be utilized to adequately determine whether hardware used in space flight should be reused or discarded. Previous research has identified seven features that contribute to the successful implementation of reusability for space flight applications, defined reusability for space flight applications, highlighted the importance of reusability, and presented areas that hinder successful implementation of reusability. The next step is to ensure that the list of reusability parameters previously identified is comprehensive, and any duplication is either removed or consolidated. The characteristics to judge the seven features as good indicators for successful reuse are identified and then assessed using multiattribute decision making. Next, discriminators in the form of metrics or descriptors are assigned to each parameter. This paper explains the approach used to evaluate these parameters, define the Measures of Effectiveness (MOE) for reusability, and quantify these parameters. Using the MOEs, each parameter is assessed for its contribution to the reusability of the hardware. Potential data sources needed to validate the approach will be identified.

Childress-Thompson, Rhonda↗

Parameter Validation for Evaluation of Spaceflight Hardware Reusability

Within recent years, there has been an influx of companies around the world pursuing reusable systems for space flight. Much like NASA, many of these new entrants are learning that reusable systems are complex and difficult to acheive. For instance, in its first attempts to retrieve spaceflight hardware for future reuse, SpaceX unsuccessfully tried to land on a barge at sea, resulting in a crash-landing. As this new generation of launch developers continues to develop concepts for reusable systems, having a systematic approach for determining the most effective systems for reuse is paramount. Three factors that influence the effective implementation of reusability are cost, operability and reliability. Therefore, a method that integrates these factors into the decision-making process must be utilized to adequately determine whether hardware used in space flight should be reused or discarded. Previous research has identified seven features that contribute to the successful implementation of reusability for space flight applications, defined reusability for space flight applications, highlighted the importance of reusability, and presented areas that hinder successful implementation of reusability. The next step is to ensure that the list of reusability parameters previously identified is comprehensive, and any duplication is either removed or consolidated. The characteristics to judge the seven features as good indicators for successful reuse are identified and then assessed using multiattribute decision making. Next, discriminators in the form of metrics or descriptors are assigned to each parameter. This paper explains the approach used to evaluate these parameters, define the Measures of Effectiveness (MOE) for reusability, and quantify these parameters. Using the MOEs, each parameter is assessed for its contribution to the reusability of the hardware. Potential data sources needed to validate the approach will be identified.

Childress-Thompson, Rhonda↗

Processing of Antarctic Meteorites at NASA/Johnson Space Center

Since the beginning of the Antarctic Search for Meteorites (ANSMET) program in 1976, over 18,000 meteorites have been processed in the Meteorite Processing Lab at Johnson Space Center in Houston, TX. The first step is to renumber the meteorites from field tag number to generic number and log all the information into the meteorite database. Initial processing involves drying the meteorites in a nitrogen glove box for 24 to 48 hours, photographing, measuring, weighing and writing an exterior description. Next step is to break the meteorite and obtain a good representative sample that will be sent to the Smithsonian institution for classification. Once all the processing is done and the meteorites have been classified, the information is published in the Antarctic meteorite newsletter. The newsletter is published twice yearly and is sent electronically to researchers around the world and is also available on line. Researchers are asked to fill out a request form. The bulk of this paper relates to the researcher's request for meteorite samples.

Satterwhite, C. E.↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Polymer Composite Material Testing for a Cryotank Application

Composite cryotanks will play a key role in enabling the next generation of efficient aircraft. Carbon fiber reinforced polymer (CFRP) composites have the benefits of reduced weight and potentially higher structural strength compared to traditional metallic fuel tanks. A material screening study was conducted to inform material selection for liquid hydrogen (LH2) fuel storage. Three composite materials were considered because of their aerospace grade toughness, strength, and existing data to compare against. These materials were a thermoplastic low-melt polyaryletherketone (LM-PAEK)/carbon fiber (CF), thermoset/CF, and hybrid thermoset/thermoplastic polyurethane (TPU) veil/CF composite. Mechanical screening tests included tension, compression, in-plane shear (IPS), and tensile-tensile fatigue (TTF). Each material was tested at both a baseline (no liquid nitrogen/LN2 cycling) and 100 LN2-cycled conditions to determine the knockdown factor, if any, of each material when exposed to environmental loading effects in a cryotank. Results show minimal effects of the LN2-cycling compared against baseline values. The three materials behaved similarly in tension; however, the thermoplastic/CF had the highest IPS toughness. The hybrid thermoset/TPU/CF composite had the lowest IPS strength, compressive strength, and toughness. LN2-cycling had minimal effects on tensile-tensile fatigue performance of the thermoplastic/CF material. Mechanical data was captured to guide material down selection for future commercially viable hydrogen aircraft design. In its current state, there does not exist a consolidated, publicly available database for CFRP composite material performance data at cryogenic temperatures. The next step in this work is to test the thermoplastic and thermoset CFRP composites, as well as the neat resins, at LH2 relevant temperature (20 K) to capture this crucial material property data. These results are essential to inform cryotank design and modeling efforts. The process to start this next round of testing has begun. Planned mechanical tests include toughness (single-edge notched beam), tension (unidirectional and quasi-isotropic), thermal expansion, and thermal conductivity. Some tests will also be conducted at an intermediate temperature of 111 K relevant to liquid natural gas (LNG), another attractive fuel choice. The ultimate goal is to manufacture a sub-scale cryotank part that can pass relevant burst, fatigue, permeation, and thermal cycling tests. This work is a part of NASA’s Commercially viable Hydrogen Aircraft for Robust Growth in Efficiency (CHARGE) Project under the larger NASA Subsonic Vehicle Technologies and Tools (SVTT) Project.

composites↗

Data reduction, management, and analysis software for CID

In an overview of the Data Reduction System, three major steps are examined. First, the raw data tapes were selected from the onboard recorders. These tapes should provide the best quality data for the data reduction software system. These tapes contained 352 channels of data, plus the monitor channels recorded in 8 bit Pulsed Coded Modulation (PCM) words. The next step consists of transcribing the PCM tapes from 8 bit serial digital data to 8 bit parallel digital data. This puts the data in the correct format for processing. The transcription process was accomplished here at LaRC in the Central Data Transportation Facility (CDTF). The last step in this 3 step process is to process the data through the reduction system developed for the Impact Dynamic Research Facility in the early part of 1980. Processing system criteria, system interface routines, and engineering units program that reads digitized data from tapes, and file management programs are discussed.

Davis, C. W.↗

Nanotip Carpets as Antireflection Surfaces

Carpet-like random arrays of metal-coated silicon nanotips have been shown to be effective as antireflection surfaces. Now undergoing development for incorporation into Sun sensors that would provide guidance for robotic exploratory vehicles on Mars, nanotip carpets of this type could also have many uses on Earth as antireflection surfaces in instruments that handle or detect ultraviolet, visible, or infrared light. In the original Sun-sensor application, what is required is an array of 50-micron-diameter apertures on what is otherwise an opaque, minimally reflective surface, as needed to implement a miniature multiple-pinhole camera. The process for fabrication of an antireflection nanotip carpet for this application (see Figure 1) includes, and goes somewhat beyond, the process described in A New Process for Fabricating Random Silicon Nanotips (NPO-40123), NASA Tech Briefs, Vol. 28, No. 1 (November 2004), page 62. In the first step, which is not part of the previously reported process, photolithography is performed to deposit etch masks to define the 50-micron apertures on a silicon substrate. In the second step, which is part of the previously reported process, the non-masked silicon area between the apertures is subjected to reactive ion etching (RIE) under a special combination of conditions that results in the growth of fluorine-based compounds in randomly distributed formations, known in the art as "polymer RIE grass," that have dimensions of the order of microns. The polymer RIE grass formations serve as microscopic etch masks during the next step, in which deep reactive ion etching (DRIE) is performed. What remains after DRIE is the carpet of nano - tips, which are high-aspect-ratio peaks, the tips of which have radii of the order of nanometers. Next, the nanotip array is evaporatively coated with Cr/Au to enhance the absorption of light (more specifically, infrared light in the Sun-sensor application). The photoresist etch masks protecting the apertures are then removed by dipping the substrate into acetone. Finally, for the Sun-sensor application, the back surface of the substrate is coated with a 57-nm-thick layer of Cr for attenuation of sunlight.

Bae, Youngsam↗

Determination of Total Magnetic Anomalies and Their Vertical Gradients of Swarm-A Satellite over Central Europe and Pannonian Basin

Our paper discusses the determination of total magnetic field anomalies derived from the Swarm–A satellite data; one of two low orbiting satellites of the three Swarm formations. This procedure requires several modifications. The first step is the conversion of the measured CDF data to the ASCII format. This step is followed by the selection of the data with K(sub p) index ≤ 1(sub +). The anomalies are determined by the removal of the IGRF from the resulting satellite data. There are two Swarm–A data sets: descending (6000) orbits and ascending (5688) orbits. For our study the descending orbits were used. The next step of calculations is to determine the difference of the two-dimensional linear field fitted to the Swarm–A anomalies and the anomalies given. These anomalies are filtered by Gaussian low-pass filter. The last step of the corrections is the removal of the direct component, zero spatial frequency, from the descending anomalies. The anomalies and their vertical gradients are qualitatively interpreted over Central Europe and the Pannonian Basin.

Kis, K.↗

Analytic methods for design of wave cycles for wave rotor core engines

A procedure to design a preliminary wave rotor cycle for any application is presented. To complete a cycle with heat addition there are two separate but related design steps that must be followed. The 'wave' boundary conditions determine the allowable amount of heat added in any case and the ensuing wave pattern requires certain pressure discharge conditions to allow the process to be made cyclic. This procedure, when applied, gives a first estimate of the cycle performance and the necessary information for the next step in the design process, namely the application of a characteristic based or other appropriate detailed one dimensional wave calculation that locates the proper porting around the periphery of the wave rotor. Four examples of the design procedure are given to demonstrate its utility and generality. These examples also illustrate the large gains in performance that could be realized with the use of wave rotor enhanced propulsion cycles.

Resler, Edwin L., Jr.↗

Shuttle Derived In-Line Heavy Lift Vehicle

This paper introduces an evolvable Space Shuttle derived family of launch vehicles. It details the steps in the evolution of the vehicle family, noting how the evolving lift capability compares with the evolving lift requirements. A system description is given for each vehicle. The cost of each development stage is described. Also discussed are demonstration programs, the merits of the SSME vs. an expendable rocket engine (RS-68), and finally, the next steps needed to refine this concept.

Greenwood, Terry↗

The Ares Project: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Project, which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. Ares is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. Ares has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, Ares is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Cook, Stephan A.↗

The Ares Projects Office: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Projects Office (APO), which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. APO is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. APO has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, APO is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that Went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Leahy, Bartholomew↗

Study of Pairwise Deconfliction Metrics to Analyze Air Traffic Complexity in Upper Class E Airspace

Upper Class E Traffic Management (ETM) is envisioned to cooperatively facilitate operations of a diverse set of aerial vehicles, such as high-altitude long-endurance fixed-wing unmanned aircraft (low-speed and high-speed), high-altitude platforms, airships, stratospheric balloons, supersonic unmanned and commercial aircraft, etc., with a wide variety of mission types, performance characteristics, communication, navigation and surveillance capabilities, maneuverability, and on-board avionics in the National Airspace System (NAS) ’above’ 60,000 feet above mean sea level, without an active and direct control from human air traffic controllers. A diverse mixture of aerial vehicle types creates significant challenges in understanding air traffic complexity, which may not correlate strongly with air traffic density. One key step for determining air traffic complexity in upper class E airspace is to first understand pairwise deconfliction metrics such as reachability, reserve area, and reserve flight time for each pair of unique aerial vehicle types under potential conflict. Therefore, pairwise deconfliction metrics are first defined, and analytical equations are derived for conflict resolution using the heading change maneuver. Next, case studies are performed to analyze deconfliction metrics to avoid secondary conflicts in upper class E airspace. The study shows that pairwise deconfliction metrics are functions of maneuverability, performance characteristics, uncertainty in position and velocity, heading angle change, and conflict angle of aerial vehicles. The next step for this research is to build a mathematical model for air traffic complexity using pairwise deconfliction metrics and validate it in an upper Class E simulation environment.

Airspace Complexity↗

Study of Pairwise Deconfliction Metrics to Analyze Air Traffic Complexity in Upper Class E Airspace

Upper Class E Traffic Management (ETM) is envisioned to cooperatively facilitate operations of a diverse set of aerial vehicles, such as high-altitude long-endurance fixed-wing unmanned aircraft (low-speed and high-speed), high-altitude platforms, airships, stratospheric balloons, supersonic unmanned and commercial aircraft, etc., with a wide variety of mission types, performance characteristics, communication, navigation and surveillance capabilities, maneuverability, and on-board avionics in the National Airspace System (NAS) ’above’ 60,000 feet above mean sea level, without an active and direct control from human air traffic controllers. A diverse mixture of aerial vehicle types creates significant challenges in understanding air traffic complexity, which may not correlate strongly with air traffic density. One key step for determining air traffic complexity in upper class E airspace is to first understand pairwise deconfliction metrics such as reachability, reserve area, and reserve flight time for each pair of unique aerial vehicle types under potential conflict. Therefore, pairwise deconfliction metrics are first defined, and analytical equations are derived for conflict resolution using the heading change maneuver. Next, case studies are performed to analyze deconfliction metrics to avoid secondary conflicts in upper class E airspace. The study shows that pairwise deconfliction metrics are functions of maneuverability, performance characteristics, uncertainty in position and velocity, heading angle change, and conflict angle of aerial vehicles. The next step for this research is to build a mathematical model for air traffic complexity using pairwise deconfliction metrics and validate it in an upper Class E simulation environment.

Airspace Complexity↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

Quartz/fused silica chip carriers

The primary objective of this research and development effort was to develop monolithic microwave integrated circuit (MMIC) packaging which will operate efficiently at millimeter-wave frequencies. The packages incorporated fused silica as the substrate material which was selected due to its favorable electrical properties and potential performance improvement over more conventional materials for Ka-band operation. The first step towards meeting this objective is to develop a package that meets standard mechanical and thermal requirements using fused silica and to be compatible with semiconductor devices operating up to at least 44 GHz. The second step is to modify the package design and add multilayer and multicavity capacity to allow for application specific integrated circuits (ASIC's) to control multiple phase shifters. The final step is to adapt the package design to a phased array module with integral radiating elements. The first task was a continuation of the SBIR Phase 1 work. Phase 1 identified fused silica as a viable substrate material by demonstrating various plating, machining, and adhesion properties. In Phase 2 Task 1, a package was designed and fabricated to validate these findings. Task 2 was to take the next step in packaging and fabricate a multilayer, multichip module (MCM). This package is the predecessor to the phased array module and demonstrates the ability to via fill, circuit print, laminate, and to form vertical interconnects. The final task was to build a phased array module. The radiating elements were to be incorporated into the package instead of connecting to it with wire or ribbon bonds.

Source record↗

Global Observations and Understanding of the General Circulation of the Oceans

The workshop was organized to: (1) assess the ability to obtain ocean data on a global scale that could profoundly change our understanding of the circulation; (2) identify the primary and secondary elements needed to conduct a World Ocean Circulation Experiment (WOCE); (3) if the ability is achievable, to determine what the U.S. role in such an experiment should be; and (4) outline the steps necessary to assure that an appropriate program is conducted. The consensus of the workshop was that a World Ocean Circulation Experiment appears feasible, worthwhile, and timely. Participants did agree that such a program should have the overall goal of understanding the general circulation of the global ocean well enough to be able to predict ocean response and feedback to long-term changes in the atmosphere. The overall goal, specific objectives, and recommendations for next steps in planning such an experiment are included.

Source record↗

NASA Exploration Launch Projects Overview: The Crew Launch Vehicle and the Cargo Launch Vehicle Systems

The U.S. Vision for Space Exploration (January 2004) serves as the foundation for the National Aeronautics and Space Administration's (NASA) strategic goals and objectives. As the NASA Administrator outlined during his confirmation hearing in April 2005, these include: 1) Flying the Space Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human space flight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. In spring 2005, the Agency commissioned a team of aerospace subject matter experts to perform the Exploration Systems Architecture Study (ESAS). The ESAS team performed in-depth evaluations of a number of space transportation architectures and provided recommendations based on their findings? The ESAS analysis focused on a human-rated Crew Launch Vehicle (CLV) for astronaut transport and a heavy lift Cargo Launch Vehicle (CaLV) to carry equipment, materials, and supplies for lunar missions and, later, the first human journeys to Mars. After several months of intense study utilizing safety and reliability, technical performance, budget, and schedule figures of merit in relation to design reference missions, the ESAS design options were unveiled in summer 2005. As part of NASA's systems engineering approach, these point of departure architectures have been refined through trade studies during the ongoing design phase leading to the development phase that begins in 2008. Comprehensive reviews of engineering data and business assessments by both internal and independent reviewers serve as decision gates to ensure that systems can fully meet customer and stakeholder requirements. This paper provides the current CLV and CaLV configuration designs and gives examples of the progress being made during the first year of this significant effort. Safe, reliable, cost-effective space transportation systems are a foundational piece of America s future in space and the next step in realizing the plan for revitalizing lunar capabilities on the passageway to the human exploration of Mars. While building on legacy knowledge and heritage hardware for risk reduction, NASA will apply lessons learned from developing these new launch vehicles to the growth path for future missions. The elements for mission success and continued U.S. leadership in space have been assembled over the past year. As NASA designs and develops these two new systems over the next dozen years, visible progress, such as that reported in this paper, may sustain the national will to stay the course across political administrations and weather the inevitable trials that will be experienced during this challenging endeavor.

Snoddy, Jimmy R.↗