At least 163 records · Page 9

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natrium Demonstration Reactor Support [Abstract]

TerraPower, LLC (TerraPower, Participant) and other private industry partners endeavor to design, license, construct, and operate a sodium-cooled fast-spectrum nuclear reactor technology demonstration plant called Natrium. This demonstration plant is supported by the U.S. Department of Energy (DOE) through the Advanced Reactor Demonstration Program (ARDP; DE-FOA-0002271). TerraPower, together with its technology co-developer GE Hitachi Nuclear Energy (GEH) and engineering and construction partner Bechtel, submitted a proposal under the program’s Advanced Reactor Demonstration Pathway for its Natrium reactor and energy system and recently received an award. TerraPower is partnering with Battelle Memorial Institute, the Management and Operating Contractor of Pacific Northwest National Laboratory (PNNL, Contractor) under the Natrium project to provide critical research outcomes necessary to demonstrate the reactor technology. Over the expected five-year timeframe of the project, PNNL will provide TerraPower and its partners with vital support in the areas of post-irradiation examination (PIE) of specimens irradiated in test reactors. These efforts will be combined and managed as a program titled “Natrium Demonstration Reactor Support.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2021 NIRT Mini Drill (After Action Report)

During the summer and fall of 2021, several functional area drills were held that focused on exercising Consequence Management’s (CM) ability to extract and use data from RadResponder for the purpose of answering intermediate-phase questions presented as technical inject requests for information (RFI) in Sandia National Laboratories (SNL) Consequence Management Operational System (COSMOS) software. The scenario chosen was that of Northern Lights 2016 (NL16) which was a large-scale nuclear power plant (NPP) release exercise in the state of Minnesota. The NL16 data was extracted from the Radiological Assessment and Monitoring System (RAMS) event where it was created and was reformatted for implanting to a new RadResponder event. Next, the beta-version of a laboratory sample data simulator was used to generate more sample data that was injected to the event. Five “mini-drills” were devised with each prompt defined by a data-based need. For each drill, a team of assessment and NARAC scientists worked the problem using the drill prompt and the available data in RadResponder. The teams held a kickoff meeting, had several days to work the problem, and then reported their results as well as observations in a hotwash. Several areas for improvement in both the software and process were identified during the course of these drills. This report will document the process of addressing each RFI and the discovered gaps in both software capability and methodology so that they can be considered for future development and investment by the CM and NIRT programs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Considerations for Introducing Artificial Intelligence into Nuclear Power Plants

Advanced computational tools and techniques such as artificial intelligence and machine learning (AI/ML) can transform the nuclear power industry. This is necessary given that the economic viability of the existing fleet is in jeopardy and its labor-centric approach to operations and maintenance. Currently, AI/ML research is being undertaken for reactor system design and analysis including fault and accident prognosis, nuclear risk analysis such as plant safety and security evaluation, and plant operations and maintenance including predictive maintenance. Applications include both existing and advanced reactor technologies with the aim of improving operational and business efficiencies. Most every aspect of the organization can benefit, from instrumentation and control, to work planning, to human-machine interactions and business management. AI/ML in nuclear can simplify complex problems and produce more effective decision-making. Nonetheless, careful consideration must be given to the implementation of an AI/ML initiative. The aims of this research are to 1) review barriers to AI/ML adoption within the nuclear power industry, and 2) suggest potential solutions. These barriers are organized along five distinct categories (Figure 1) that are interconnected. The first are historical barriers that track the industry’s development over the decades including worldwide nuclear events that shaped public perceptions. The resulting federal scrutiny and intense safety culture that emerged are discussed. Technical barriers to AI/ML adoption are considerable, and include data privacy concerns, data governance, and the current lack of AI/ML expert knowledge at the plants. The main business case barrier remains cost, but an absence of an industry-wide vision and wide-scale adoption also produces reluctance. Stakeholder readiness is reviewed with special attention given to regulatory readiness. The 5-year strategic plan for AI readiness recently published by the U.S. Nuclear Regulatory Commission is highlighted. Last, adoption barriers at the user level are addressed including the importance of user experience and explainable AI. The AI adoption barriers described here are inter-related and ideally should be addressed in a holistic fashion.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Practical Comparison of Data-Driven Prognostics Methods for Energy Systems

This study explores data-driven prognostics for nuclear power plant (NPP) condensers, focusing on tube fouling. We utilized the Asherah nuclear power plant simulator (ANS) to compare four methods: Random Forest (RF), Support Vector Regressor (SVR), Fully Connected Neural Network (FCNN), and Long Short-Term Memory Neural Network (LSTM). By simulating various fouling scenarios in the ANS, we generated data with different degradation rates under transient operations. The models were trained and tested on these data, with performance evaluated visually and numerically including uncertainty assessment. The LSTM model excelled, exhibiting minimal prediction noise and the most accurate remaining useful life estimates across all degradation levels. Its ability to capture long-term dependencies and produce cleaner outputs makes it a strong candidate, although accurate training data across the entire component lifespan are crucial. The RF model emerged as a robust alternative, providing reliable predictions with high confidence. The FCNN and SVR models, while less effective overall, showed potential under specific conditions. FCNN offers a less complex alternative to LSTM and might benefit from larger datasets. SVR excels in precision when the quality of the training data is high. Furthermore, this study highlights the operational benefits of advanced prognostics in the energy sector and emphasizes the need for further research in NPP condenser health management through real-life experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Calculation for T Plant Estimated PTE with Receipt of K Basin Sludge and Filter Media

The purpose of this environmental calculation is to: (1) show compliance with the WAC 173-400-110, New Source Review (NSR) for Sources and Portable Sources requirements and (2) provide the methodology, assumptions and calculation used to estimate the potential to emit (PTE) and Total Effective Dose Equivalent to the Maximally Exposed Individual (TEDE to the MEI) radionuclide airborne emissions associated with the receipt of K Basin sludge and filter media for storage at T Plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Stellarators as a fast path to fusion

Herein this paper is focused on three points: (1) overcoming obstacles to tokamak power plants may require a configuration modification as large as that of a stellarator. (2) The demonstrated reliability of the computational design of stellarators should change fusion strategy. (3) Deployment of carbon-free energy sources is mandated by the thirty-year doubling of carbon dioxide emissions. Carbon-free energy options must be developed and fully deployed within a few doubling times. Unit size and cost of electricity are only relevant in comparison to alternative worldwide energy solutions. Intermittency, site specificity, waste management, and nuclear proliferation make fusion attractive as the basis for a carbon-free energy system compared to the alternatives. Nonetheless, fusion is not an option for deployment until a power plant has successfully operated. A critical element in a minimal time and risk program is the use of computational design as opposed to just extrapolation. Only the stellarator has an empirical demonstration of the reliable computational design through large changes in configuration properties and scale. The computational design of stellarators should proceed while the inventions necessary for a more tokamak-like power plant are sought. The cost of computational design is extremely small, but adequate time is required for the development of ideas that maximize attractiveness and minimize risk. Rapid power-plant construction without many intermediate steps may seem risky, but the price is small compared to the cost of trillions of dollars for each year's delay in addressing carbon-dioxide emissions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Verification and Validation of the Stakeholder Tool for Assessing Radioactive Transportation (START) – 22323

The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.

START, DOE, Transporation, dose, GIS↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing spent nuclear from 16 (NPP) sites. The material to be removed from the NPP sites includes both the spent nuclear fuel (SNF) and the greater-than-Class C low level radioactive waste (GTCC waste) that is stored, or will be stored, at the sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

Evaluation of conventional power systems

The technical, economic, and environmental characteristics of (thermal, nonsolar) electric power plants are reviewed. The fuel cycle, from extraction of new fuel to final waste management, is included. Emphasis is placed on the fossil fuel and nuclear technologies.

Smith, K. R.↗

Risks and Benefits of Pressurized Water Reactor Coupling to Energy Storage and Water Desalination

This research explored potential options to improve nuclear pressurized water reactors’ (PWRs) operational flexibility through integration with thermal energy storage (TES) and water desalination technologies. Benefits and challenges of TES technologies were reviewed, which includes sensible heat storage systems, latent heat storage systems, and thermochemical storage systems. Water desalination technologies were reviewed and compared, which includes multi-stage flash, reverse osmosis, and multi-effect distillation. The multi-effect distillation technology was selected to be coupled with a generic PWR. Risk of this cogeneration was quantified using the probabilistic risk assessment (PRA) methodology. Results suggest that nuclear-desalination cogeneration can be done safely because the additional risk to the PWR is trivial, and even in certain cases the PWR risk is decreased. This cogeneration operation is expected to improve efficiency of thermal utilization and the nuclear plant’s revenues. In summary, this study supports the potential of nuclear-desalination cogeneration systems to address water scarcity while optimizing nuclear energy use and managing safety.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Treatment of uncertainties for security-related design aspects of advanced reactors when using a risk-informed licensing approach

Sabotage of nuclear plants and theft of special nuclear material are different from many other issues potentially affecting public health and safety, and some of those differences drive the content of the present report. A high-level indication of these differences is provided in the US Nuclear Regulatory Commission’s Safety Goal Policy. Promulgated in the mid-1980’s, when it had become reasonably clear that risk analysis had improved to the point where it was possible to understand the risks associated with plant operation, the Safety Goal Policy articulates qualitative safety goals and quantitative health objectives that are meant to guide regulatory and risk management activities, with the following key exceptions noted in the original policy statement: The possible effects of sabotage or diversion of nuclear material are also not presently included in the safety goals. At present there is no basis on which to provide a measure of risk on these matters. It is the Commission’s intention that everything that is needed will be done to keep these types of risks at their present very low level; and it is the Commission’s expectation that efforts on this point will continue to be successful. With these exceptions, it is the Commission’s intent that the risks from all the various initiating mechanisms be considered to the best of the capability of current evaluation techniques. The present report discusses extensions of classical risk management to address some of the special issues that arise in the context of security. Although the present emphasis is on physical security, some attention will be paid to cyber security. A particular focus of the report is on quantitative framework to manage and address uncertainties. This framework is demonstrated via a couple of hypothetical examples.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗