Approach to Startup Inventory for Viable Commercial Power Plant
Summary • FPP realization within the next 10-15 years will require dedicated efforts to improve DIR, burn fraction, fueling efficiency, and/or processing times. • Modest improvements from either the fuel cycle side or plasma physics side should be possible with considered allocation of R&D funding. • Current gaps in particular include blanket extraction at scale, improved efficiency in isotope separation and detritiation, and maximizing DIR efficiency. • Total costs for FPP construction and commissioning depend heavily on site regulation, so decreases in required SI and OI can lead to large decreases in capital outlay. • Some subsystems in the fuel cycle are required from a environmental management perspective but are both energetically expensive and time consuming, particularly water detritiation. • Low inventories but high capital and operational costs mean a centralized water detritiation plant could greatly improve likelihood of deployment of multiple FPPs on the same time scale.