Search NASA⌕ Search

SEARCH · Search NASA

Results for “ORBITAL LAUNCH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Orbital Verification of the CXO High-Resolution Mirror Assembly Alignment and Vignetting

Prior to launch, the High Resolution Mirror Assembly (HRMA) of the Chandra X-ray Observatory underwent extensive ground testing at the X-ray Calibration Facility (XRCF) at the Marshall Space Flight Center in Huntsville. Observations made during the post-launch Orbital Activation and Calibration period, allow the on-orbit condition of the X-ray optics to be assessed. Based on these ground-based and on-orbit data, we examine the alignment of the x-ray optics based on the PSF, and the boresight and alignment of the optical axis alignment relative to the detectors. We examine the vignetting and the single reflection ghost suppression properties of the telescope. Slight imperfections in alignment lead to a small azimuthal dependence of the off-axis area; the morphology of off-axis images also shows an additional small azimuthal dependence varying as 1/2 the off-axis azimuth angle.

Gaetz, T. J.↗

Abatement of gaseous and particulate contamination in a space instrument application to a solar telescope

Methods to prevent the ingestion of external contaminants into the instrument and to limit the effect of the self-generated contaminants during ground, launch, orbiting and landing phases of flight were investigated. It is proposed that a positive pressure and purging flow of clean gas inside the instrument be maintained while on the ground, during launch, and for a period of time in orbit. The pressure to be maintained and the required purging flow are examined in terms of the effectiveness in preventing gaseous and particulate contaminants ingestion and the abatement of the self-generated contaminants. Considerations have been given to the venting requirements for the structural integrity of the instrument during launch, the limitations on the volume and the pressure of the purging gas to be carried along in orbit, and the required venting area is established based on the internal volume of the instrument, the allowable pressure differential, and the rate of external pressure change during launch.

Scialdone, J. J.↗

Abatement of gaseous and particulate contamination in a space instrument

Methods to prevent the ingestion of external contaminants into the instrument and to limit the effect of the self-generated contaminants during ground, launch, orbiting and landing phases of flight were investigated. It is proposed that a positive pressure and purging flow of clean gas inside the instrument be maintained while on the ground, during launch, and for a period of time in orbit. The pressure to be maintained and the required purging flow are examined in terms of the effectiveness in preventing gaseous and particulate contaminants ingestion and the abatement of the self-generated contaminants. Considerations have been given to the venting requirements for the structural integrity of the instrument during launch, the limitations on the volume and the pressure of the purging gas to be carried along in orbit, and the required venting area is established based on the internal volume of the instrument, the allowable pressure differential, and the rate of external pressure change during launch. Previously announced in STAR as N83-23350

Scialdone, J. J.↗

Nuclear reactor power as applied to a space-based radar mission

A space-based radar mission and spacecraft are examined to determine system requirements for a 300 kWe space nuclear reactor power system. The spacecraft configuration and its orbit, launch vehicle, and propulsion are described. Mission profiles are addressed, and storage in assembly orbit is considered. Dynamics and attitude control and the problems of nuclear and thermal radiation are examined.

Jaffe, L.↗

STS-45 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Admiral Richard Truly, who makes a brief statement about the STS-45 Atlantis Orbiter launch and answers questions from the press.

Source record↗

NASA 2nd Generation RLV Program Introduction, Status and Future Plans

The Space Launch Initiative (SLI), managed by the Second Generation Reusable Launch Vehicle (2ndGen RLV) Program, was established to examine the possibility of revolutionizing space launch capabilities, define conceptual architectures, and concurrently identify the advanced technologies required to support a next-generation system. Initial Program funds have been allocated to design, evaluate, and formulate realistic plans leading to a 2nd Gen RLV full-scale development (FSD) decision by 2006. Program goals are to reduce both risk and cost for accessing the limitless opportunities afforded outside Earth's atmosphere fo civil, defense, and commercial enterprises. A 2nd Gen RLV architecture includes a reusable Earth-to-orbit launch vehicle, an on-orbit transport and return vehicle, ground and flight operations, mission planning, and both on-orbit and on-the-ground support infrastructures All segments of the architecture must advance in step with development of the RLV if a next-generation system is to be fully operational early next decade. However, experience shows that propulsion is the single largest contributor to unreliability during ascent, requires the largest expenditure of time for maintenance, and takes a long time to develop; therefore, propulsion is the key to meeting safety, reliability, and cost goals. For these reasons, propulsion is SLI's top technology investment area.

Dumbacher, Dan L.↗

History of San Marco

A brief history is reported of the first San Marco project, a joint program of the United States and Italy. The Project was a three phase effort to investigate upper air density and associated ionosphere phenomena. The initial phase included the design and development of the spacecraft, the experiments, the launch complex, and a series of suborbital flights, from Wallops Island. The second phase, consisting of designing, fabricating, and testing a spacecraft for the first orbital mission, culminated in an orbital launch also from Wallops Island. The third phase consisted of further refining the experiments and spacecraft instrumentation and of establishing a full-bore scout complex in Kenya. The launch of San Marco B, in April 1967, from this complex into an equatorial orbit, concluded the initial San Marco effort.

Caporale, A. J.↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented for each primary mission capability. These profiles are the basis for propellant loads, numbers of vehicles/stages and launches for each mission capability. Data includes the number of launches required for each mission utilizing current expendable launch vehicle systems, and concluding remarks include ideas for reducing the number of launches through incorporation of heavy-lift launch vehicles, solar electric propulsion, and other transportation support concepts.

Smitherman, David↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depot servicing platforms to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicle (ELV) systems such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support a new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid and Mars Missions. New vehicle design concepts are presented that can be launched on current 5 meter diameter ELV systems. These new reusable vehicle concepts include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot, L1 Depot and missions beyond L1; a new reusable lunar lander for crew transportation between the L1 Depot and the lunar surface; and Mars orbital Depot are based on International Space Station (ISS) heritage hardware. Data provided includes the number of launches required for each mission utilizing current ELV systems (Delta IV Heavy or equivalent) and the approximate vehicle masses and propellant requirements. Also included is a discussion on affordability with ideas on technologies that could reduce the number of launches required and thoughts on how this infrastructure include competitive bidding for ELV flights and propellant services, developments of new reusable in-space vehicles and development of a multiuse infrastructure that can support many government and commercial missions simultaneously.

Smitherman, David↗

A shuttle development flight test vehicle study

A study is presented that identifies the potential performance capability of the production shuttle orbiter for powered flight tests using several propulsion systems following vertical takeoff and using J-2 rocket engines following air launch. Of the approaches considered, the air-launched orbiter equipped with J-2 rocket engines appeared to have the highest potential for early shuttle development flights. With this approach, mach 4 appeared attainable using 45.5K kg (100K lb) of internal propellant. Several issues were identified that require resolution to prove feasibility.

Rainey, R. W.↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

First results from the Solar Orbiter Heavy Ion Sensor

Aims . Solar Orbiter launched in February 2020 with the goal of revealing the connections between the Sun’s interior, atmosphere, and the heliosphere. The Solar Orbiter Heavy Ion Sensor (HIS) is a time-of-flight ion mass spectrometer dedicated to measuring heavy ions in the solar wind. Methods . We present an overview of the first measurements of heavy ion composition from HIS, reviewing the methods used to transform the spectra obtained on board into scientific data products and examining two solar wind case studies as well as the statistical properties of the heavy ion composition observed by HIS. We also carried out a comparison with prior measurements of heavy ions at L1. Results . The HIS data set provides the first mass- and charge-resolved heavy ion measurements in the inner heliosphere. Conclusions . These high temporal resolution data have the potential to transform our understanding of the connections between the solar wind and its origin at the Sun, as well as the interaction between the solar wind and the environment around planets, comets, and in the interstellar medium.

solar wind↗

ELV payload environment; Proceedings of the NASA-Industry Conference on Launch Environments of ELV Payloads, Elkridge, MD, June 4-6, 1990

Various papers on the ELV payload environment are presented. Individual topics addressed include: EnviroNET: the Space Environment Information Service, ELV Payload Environments Study, perspective of GSFC Orbital Launch Services Office, Cosmic Background Explorer, the Standard Booster Interface, MLV Standard Interface Study, future payload requirements, General Dynamics Atlas family, Delta II Launch Vehicle environments, Titan vibroacoustics, Titan IV, the Scout Launch Vehicle, Pegasus.

Lauriente, Michael↗

Simple, Robust Cryogenic Propellant Depot for Near Term Applications

The ability to refuel cryogenic propulsion stages on-orbit provides an innovative paradigm shift for space transportation supporting National Aeronautics and Space Administration s (NASA) Exploration program as well as deep space robotic, national security and commercial missions. Refueling enables large beyond low Earth orbit (LEO) missions without requiring super heavy lift vehicles that must continuously grow to support increasing mission demands as America s exploration transitions from early Lagrange point missions to near Earth objects (NEO), the lunar surface and eventually Mars. Earth-to-orbit launch can be optimized to provide competitive, cost-effective solutions that allow sustained exploration. This paper describes an experimental platform developed to demonstrate the major technologies required for fuel depot technology. This test bed is capable of transferring residual liquid hydrogen (LH2) or liquid oxygen (LO2) from a Centaur upper stage, and storage in a secondary tank for up to one year on-orbit. A dedicated, flight heritage spacecraft bus is attached to an Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA) ring supporting experiments and data collection. This platform can be deployed as early as Q1 2013. The propellant depot design described in this paper can be deployed affordably this decade supporting missions to Earth-Moon Lagrange points and lunar fly by. The same depot concept can be scaled up to support more demanding missions and launch capabilities. The enabling depot design features, technologies and concept of operations are described.

McLean, Christopher↗

Space Vehicle Deployment from Space Station Orbit

When launching a spacecraft from Earth parking orbit to deep space, it is highly desirable to have the hyperbolic excess velocity vector (v-infinity) contained in the parking orbit plane. Ground launches can force the parking orbit plane to contain the v-infinity vector by using launch azimuth and lift-off time as independent variables. When launching from the Space Station, a new set of variables comes into play. The Station orbit is of fixed inclination but precessing due to the Earth's oblateness. Its plane will seldom (and may never) contain the desired v-infinity vector. Consequently, the departure strategy will usually require multiple burns and include a plane change. Also, the concept of "launch period" will be somewhat different from Earth surface launches. An analysis of the deployment of interplanetary spacecraft from Space Station is described, with emphasis on the effect of the trajectory characteristics on station operations. Several planetary mission types are analyzed for manned Mars missions. In addition, high declination departures of spacecraft on unmanned missions to an asteroid are examined. The constraint of Station orbit nodal position is quantified and the operational implications for station reboost strategy are examined.

Henry, Paul K.↗

Manned space flight nuclear system safety. Volume 1: base nuclear system safety

The mission and terrestrial nuclear safety aspects of future long duration manned space missions in low earth orbit are discussed. Nuclear hazards of a typical low earth orbit Space Base mission (from natural sources and on-board nuclear hardware) have been identified and evaluated. Some of the principal nuclear safety design and procedural considerations involved in launch, orbital, and end of mission operations are presented. Areas of investigation include radiation interactions with the crew, subsystems, facilities, experiments, film, interfacing vehicles, nuclear hardware and the terrestrial populace. Results of the analysis indicate: (1) the natural space environment can be the dominant radiation source in a low earth orbit where reactors are effectively shielded, (2) with implementation of safety guidelines the reactor can present a low risk to the crew, support personnel, the terrestrial populace, flight hardware and the mission, (3) ten year missions are feasible without exceeding integrated radiation limits assigned to flight hardware, and (4) crew stay-times up to one year are feasible without storm shelter provisions.

Source record↗