Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

SEASAT economic assessment. Volume 10: The SATIL 2 program (a program for the evaluation of the costs of an operational SEASAT system as a function of operational requirements and reliability

The SATIL 2 computer program was developed to assist with the programmatic evaluation of alternative approaches to establishing and maintaining a specified mix of operational sensors on spacecraft in an operational SEASAT system. The program computes the probability distributions of events (i.e., number of launch attempts, number of spacecraft purchased, etc.), annual recurring cost, and present value of recurring cost. This is accomplished for the specific task of placing a desired mix of sensors in orbit in an optimal fashion in order to satisfy a specified sensor demand function. Flow charts are shown, and printouts of the programs are given.

Source record↗

Flight operations payload training for crew and support personnel. Task 3: Inflight operations and training for payloads

Various degrees of Commander/Pilot involvement in on-orbit operation of payloads are examined. Constraints and limitations resulting from their participation or affecting their ability to participate are identified. Four options, each representing a different set of involvement depths and concepts are analyzed. Options identified are boundaries around extremes in Commander/Pilot payload involvement. Real world choices may fall somewhere in between, but for the purposes of this study the options as represented provide a matrix from which logical and practical decisions can be made about crew participation in payload operations.

Beardslee, R. F.↗

Tug ground operations - An approach to early identification of operational impacts

An approach to early identification of operational requirements is discussed together with an assessment of the impact of these requirements on the development and acquisition phase of a program. The approach is applied to the Space Tug program. Some of the more salient results of the Tug Fleet and Ground Operations Schedules and Controls study performed under a NASA/Marshall Space Flight Center contract are provided. Ground-processing requirements and flows are presented, including a summary of facility requirements, timelines, activities and options/contingency-provision recommendations. Programmatic recommendations resulting from the study are presented in areas of payload integration, activation requirements, fleet utilization, fleet sizing, costs, and WTR delta requirement for the Tug.

Best, J. L.↗

The operational performance of hydrogen masers in the deep space network: The performance of laboratory reference frequency standards in an operational environment

Hydrogen masers used as aids in meeting the routine frequency and time operational requirements within the 64 m antenna Deep Space Network. Both the operational syntonation (frequency synchronization) and the the clock (epoch) synchronization requirements were established through the use of specifically calibrated H-P E215061A flying clock. The sync/synt to UTC was maintained using LORAN and TV in simultaneous reception mode. The sync/synt within the 64 m net was maintained through the use of very long base interferometry. Results indicate that the hydrogen masers perform well within the required specifications.

Ward, S. C.↗

Analysis of remote operating systems for space-based servicing operations. Volume 2: Study results

The developments in automation and robotics have increased the importance of applications for space based servicing using remotely operated systems. A study on three basic remote operating systems (teleoperation, telepresence and robotics) was performed in two phases. In phase one, requirements development, which consisted of one three-month task, a group of ten missions were selected. These included the servicing of user equipment on the station and the servicing of the station itself. In phase two, concepts development, which consisted of three tasks, overall system concepts were developed for the selected missions. These concepts, which include worksite servicing equipment, a carrier system, and payload handling equipment, were evaluated relative to the configurations of the overall worksite. It is found that the robotic/teleoperator concepts are appropriate for relatively simple structured tasks, while the telepresence/teleoperator concepts are applicable for missions that are complex, unstructured tasks.

Source record↗

Shuttle Ground Operations Efficiencies/Technologies (SGOE/T) study. Volume 2: Ground Operations evaluation

The Ground Operations Evaluation describes the breath and depth of the various study elements selected as a result of an operational analysis conducted during the early part of the study. Analysis techniques used for the evaluation are described in detail. Elements selected for further evaluation are identified; the results of the analysis documented; and a follow-on course of action recommended. The background and rationale for developing recommendations for the current Shuttle or for future programs is presented.

Scholz, A. L.↗

The real-time operations of the Space Shuttle Orbiter during rendezvous and proximity operations

The Space Shuttle Orbiter is the only U.S. spacecraft in operation today that routinely performs an orbital rendezvous with another spacecraft. The trajectory planning and training of both flight crews and ground operations personnel required to achieve a 100 percent success rate is considerable. The preflight planning and training can be reduced through very simple design considerations of a new space vehicle.

Dougherty, Andrew↗

In-Space Assembly and Construction Technology Project Summary: Infrastructure Operations Area of the Operations Technology Program

Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.

Bush, Harold↗

A Study of Normal Accelerations and Operating Conditions Experienced by Helicopters in Commercial and Military Operations

An analysis is presented of the normal accelerations and operating conditions encountered by two different airmail helicopters and a military pilot-training helicopter. The results, based on 4,325 flights (618 hours of flying time), indicate that maneuvers are usually responsible for the relatively large accelerations encountered, whereas gusts contribute primarily to the large number of smaller accelerations and the corresponding increase in the amount of time spent in the accelerated state. The largest maneuver loads recorded to date are increments (measured from the 1 g normal-flight condition) of 1.40g and -1.25g, whereas the largest gust-acceleration increment was 0.90g. The percentages of total flight time spent in the various flight conditions and speed ranges, as well as the acceleration time histories, are very similar for the two airmail helicopters and appear to follow a definite pattern as contrasted to the varied operating conditions of the military pilot-training helicopter.

Marlin E Hazen↗

Some Operating Experience and Problems Encountered During Operation of a Free-jet Facility

During a free-jet investigation of a 28-inch ram-jet engine at a Mach number of 2.35, flow pulsation at the engine inlet were discovered which proved to have an effect on the engine performance and operational characteristics, particularly the engine rich blowout limits. This report discusses the finding of the flow pulsations, their elimination, and effect. Other facility characteristics, such as the establishment of flow simulation and the degree of subcritical operation of the diffuser, are also explained.

Mcaulay, John E↗

Alpha: A real-time decentralized operating system for mission-oriented system integration and operation

Alpha is a new kind of operating system that is unique in two highly significant ways. First, it is decentralized transparently providing reliable resource management across physically dispersed nodes, so that distributed applications programming can be done largely as though it were centralized. And second, it provides comprehensive, high technology support for real-time system integration and operation, an application area which consists predominately of aperiodic activities having critical time constraints such as deadlines. Alpha is extremely adaptable so that it can be easily optimized for a wide range of problem-specific functionality, performance, and cost. Alpha is the first systems effort of the Archons Project, and the prototype was created at Carnegie-Mellon University directly on modified Sun multiprocessor workstation hardware. It has been demonstrated with a real-time C(sup 2) application. Continuing research is leading to a series of enhanced follow-ons to Alpha; these are portable but initially hosted on Concurrent's MASSCOMP line of multiprocessor products.

Jensen, E. Douglas↗

Mission operations and command assurance: Instilling quality into flight operations

Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous process improvement to reduce the probability of radiating incorrect commands to a spacecraft. The MO&CA task has evolved from participating as a member of the spacecraft team to an independent team reporting directly to flight project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

Welz, Linda L.↗

Crew factors in flight operations 9: Effects of planned cockpit rest on crew performance and alertness in long-haul operations

This study examined the effectiveness of a planned cockpit rest period to improve alertness and performance in long-haul flight operations. The Rest Group (12 crew members) was allowed a planned 40 minute rest period during the low workload, cruise portion of the flight, while the No-Rest Group (9 crew members) had a 40 minute planned control period when they maintained usual flight activities. Measures used in the study included continuous ambulatory recordings of brain wave and eye movement activity, a reaction time/vigilance task, a wrist activity monitor, in-flight fatigue and alertness ratings, a daily log for noting sleep periods, meals, exercise, flight and duty periods, and the NASA Background Questionnaire. The Rest Group pilots slept on 93 percent of the opportunities, falling asleep in 5.6 minutes and sleeping for 25.8 minutes. This nap was associated with improved physiological alertness and performance compared to the No-Rest Group. The benefits of the nap were observed through the critical descent and landing phases of flight. The nap did not affect layover sleep or the cumulative sleep debt. The nap procedures were implemented with minimal disruption to usual flight operations and there were no reported or identified concerns regarding safety.

Rosekind, Mark R.↗

Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

Greenberg, Ed↗

Flight Validation of On-Demand Operations: The Deep Space One Beacon Monitor Operations Experiment

After a brief overview of the operational concept, this paper will provide a detailed description of the _as-flown_ flight software components, the DS1 experiment plan, and experiment results to date. Special emphasis will be given to experiment results and lessons learned since the basic system design has been previously reported. Mission scenarios where beacon operations is highly applicable will be described. Detailed cost savings estimates for a sample science mission will be provided as will cumulative savings that are possible over the next fifteen years of NASA missions.

Wyatt, Jay↗

Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

Abbott, Terence S.↗

Secure, Network-Centric Operations of a Space-Based Asset: Cisco Router in Low Earth Orbit (CLEO) and Virtual Mission Operations Center (VMOC)

This report documents the design of network infrastructure to support operations demonstrating the concept of network-centric operations and command and control of space-based assets. These demonstrations showcase major elements of the Transformal Communication Architecture (TCA), using Internet Protocol (IP) technology. These demonstrations also rely on IP technology to perform the functions outlined in the Consultative Committee for Space Data Systems (CCSDS) Space Link Extension (SLE) document. A key element of these demonstrations was the ability to securely use networks and infrastructure owned and/or controlled by various parties. This is a sanitized technical report for public release. There is a companion report available to a limited audience. The companion report contains detailed networking addresses and other sensitive material and is available directly from William Ivancic at Glenn Research Center.

Ivancic, William↗

EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

Cordier, Guy R.↗