Operational Experience and Development of a Reliability Model for the ATR Demineralizer System (Slides)

The Advanced Test Reactor (ATR) is a light water reactor with aluminum clad driver fuel. Strict limits are implemented on pH, conductivity, and filterable solids to assure the performance of the driver fuel limit corrosion of the primary coolant system (PCS) pressure boundary components. A bypass demineralizer system is used to maintain PCS coolant within allowable bands for each of the aforementioned variables. Unlike many other reactors, the ATR does not have a filtration system. As such, failure of ion exchange resin in the bypass demineralizer can defeat the purpose of the system and result in high filterable solids in the PCS. Power operations with high filterable solids is prohibited by a technical safety requirement. This paper discusses recent failures of the ATR bypass demineralizer system. The testing and analysis done to deduce the cause of the failures is covered, as well as short term mitigative steps that were taken. To prevent the likelihood of future issues, historical data from the ATR and industry is used to develop a reliability model of the ATR bypass demineralizer system. Evidence of radiolytic decomposition of ion exchange resin was found in the cause investigation. As such, special attention is given to ion exchange resin failure due to high radiation environments. The reliability model is used to develop the ATR testing and maintenance program. Specifically, limits on resin service life are discussed.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Operation experience of p-Carbon polarimeter in RHIC

The spin physics program in Relativistic Heavy Ion Collider (RHIC) requires fast polarimeter to monitor the polarization evolution on the ramp and during stores. Over past decade, the polarimeter has evolved greatly to improve its performance. These include dual chamber design, monitoring camera, Si detector selection (and orientation), target quality control, and target frame modification. The preamp boards have been modified to deal with the high rate problem, too. The ultra thin carbon target lifetime is a concern. Simulations have been carried out on the target interaction with beam. Modification has also been done on the frame design. Extra caution has been put on RF shielding to deal with the pickup noises from the nearby stochastic cooling kickers. This paper summarizes the recent operation performance of this delicate device.

43 PARTICLE ACCELERATORS↗

Pre-Study Walkthrough with a Commercial Pilot for a Preliminary Single Pilot Operations Experiment

The number of crew members in commercial flights has decreased to two members, down from the five-member crew required 50 years ago. One question of interest is whether the crew should be reduced to one pilot. In order to determine the critical factors involved in safely transitioning to a single pilot, research must examine whether any performance deficits arise with the loss of a crew member. With a concrete understanding of the cognitive and behavioral role of a co-pilot, aeronautical technologies and procedures can be developed that make up for the removal of the second aircrew member. The current project describes a pre-study walkthrough process that can be used to help in the development of scenarios for testing future concepts and technologies for single pilot operations. Qualitative information regarding the tasks performed by the pilots can be extracted with this technique and adapted for future investigations of single pilot operations.

Single Pilot Operations↗

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction and Operational Experience with a Superconducting Octupole Used to Trap Antihydrogen

A superconducting octupole magnet has seen extensive service as part of the ALPHA experiment at CERN. ALPHA has trapped antihydrogen, a crucial step towards performing precision measurements of anti-atoms. The octupole was made at the Direct Wind facility by the Superconducting Magnet Division at Brookhaven National Laboratory. The magnet was wound with a six-around-one NbTi cable about 1 mm in diameter. It is about 300 mm long, with a radius of 25 mm and a peak field at the conductor of 4.04 T. Specific features of the magnet, including a minimal amount of material in the coil and coil ends with low multipole content, were advantageous to its use in ALPHA. The magnet was operated for six months a year for five years. During this time it underwent about 900 thermal cycles (between 4K and 100K). A novel operational feature is that during the course of data-taking the magnet was repeatedly shut off from its 950 A operating current. The magnet quenches during the shutoff, with a decay constant of 9 ms. Over the course of the five years, the magnet was deliberately quenched many thousands of times. It still performs well.

99 GENERAL AND MISCELLANEOUS↗

HFL-10 lifting body flight control system characteristics and operational experience

A flight evaluation was made of the mechanical hydraulic flight control system and the electrohydraulic stability augmentation system installed in the HL-10 lifting body research vehicle. Flight tests performed in the speed range from landing to a Mach number of 1.86 and the altitude range from 697 meters (2300 feet) to 27,550 meters (90,300 feet) were supplemented by ground tests to identify and correct structural resonance and limit-cycle problems. Severe limit-cycle and control sensitivity problems were encountered during the first flight. Stability augmentation system structural resonance electronic filters were modified to correct the limit-cycle problem. Several changes were made to control stick gearing to solve the control sensitivity problem. Satisfactory controllability was achieved by using a nonlinear system. A limit-cycle problem due to hydraulic fluid contamination was encountered during the first powered flight, but the problem did not recur after preflight operations were improved.

Painter, W. D.↗

Advanced Prototype Fan Operating Experience, Post Test Evaluation, and Refurbishment for PLSS 2.0 Test Use

NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.

Hodgson, Edward↗

The Ricor K508 cryocooler operational experience on Mars

The Mars Science Laboratory (Curiosity) landed successfully on Mars on August 5, 2012, eight months after launch. The chosen landing site of Gale Crater, located at 4.5 degrees south latitude, 137.4 degrees east longitude, has provided a much more benign environment than was originally planned for during the critical design and integration phases of the MSL Project when all possible landing sites were still being considered. The expected near-surface atmospheric temperatures at the Gale Crater landing site during Curiosity's primary mission (1 Martian year or 687 Earth days) are from −90°C to 0°C. However, enclosed within Curiosity's thermal control fluid loops the Chemistry and Mineralogy (CheMin) instrument is maintained at approximately +20°C. The CheMin instrument uses X-ray diffraction spectroscopy to make precise measurements of mineral constituents of Mars rocks and soil. The instrument incorporated the commercially available Ricor K508 Stirling cycle cryocooler to cool the CCD detector. After several months of brushing itself off, stretching and testing out its subsystems, Curiosity began the exploration of the Mars surface in October 2012. The CheMin instrument on the Mars Science Laboratory (MSL) received its first soil sample from Curiosity on October 24, and successfully analyzed its first soil sample. After a brief review of the rigorous Ricor K508 cooler qualification tests and life tests based on the original MSL environmental requirements this paper presents final pre-launch instrument integration and testing results, and details the operational data of the CheMin cryocooler, providing a snapshot of the resulting CheMin instrument analytical data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Initial Operations Experience and Results from the Juno Gravity Experiment

Radio communications between the Juno spacecraft, in orbit around Jupiter, and the Earth-based observing stations of NASA’s Deep Space Network enable measurements of the Doppler shift induced on the radio signals by Juno’s motion in the Jovian environment. This measurement of the Doppler shift improves the knowledge of Jupiter’s gravitational field. As a radio science instrument, Juno’s gravity science instrument utilizes a ground component at the Deep Space Network’s DSS-25 antenna, equipped with simultaneous dual X- and Ka-band transmitters and receivers, and a spacecraft component, which includes X- and Ka-band transponders to relay the transmitted signal back to Earth. Originally planned to be in 14-day orbits around Jupiter, a risk identified in the propulsion system led to the decision to stay in the 53-day orbit period. Rapid turnaround of observation planning led to successful near-term perijove passes. Although maintaining a 53-day orbit period provides a scientific benefit to the gravity science investigation, the longer orbit period further increases the large dynamic range in Doppler shift and pointing angles induced by the geometry of each perijove. Between entering orbit at Jupiter on July 5, 2016 and September 2017, the Juno spacecraft has executed eight closest approach periods every 53 days where science data was collected. The first five perijove passes were conducted in different telecom configurations, each presenting unique challenges in data collection and processing. Perijoves PJ-01, PJ-02, PJ-03, and PJ-06 utilized the high-gain antenna and various configurations of the X- and Ka-bands. Perijoves PJ-04 and PJ-05 utilized the medium-gain antenna at X-band only while the spacecraft was off-Earth point. Additional perijoves are planned every 53-days, with an additional five by March 2018. Lessons learned from operating and collecting data at each perijove are documented and will be utilized in future perijoves. Analysis of the first two gravity science perijoves has improved the precision of Jupiter’s gravity field by a factor of five, providing crucial constraints on the interior structure of Jupiter.

Buccino, Dustin↗

Characterization of W production during ICRF operations: experiments and modeling

For successfully heating plasma with waves in the ion cyclotron range of frequencies (ICRFs), mitigating impurity production is just as crucial as maximizing power coupling, especially in high-Z environments. ICRF can effectively deposit energy on ions, modify turbulence-driven transport, and enhance fusion reaction efficiency, but only when its power coupling has minimal impact on impurity production. To do so, one must rely on a toroidal array of at least three active elements excited with appropriate phasing and power ratio to reduce the currents induced on the antenna frame below levels critical for physical sputtering. In contrast to classic two-strap antennas, which are optimized for dipole phasing with equal power on both straps, three-strap antennas in ASDEX Upgrade (AUG)—but also four-strap antennas in JET, Alcator C-Mod, SPARC and ITER—offer the possibility to act also on the power ratio between the central and outer straps. With optimal settings, impurity production can be reduced substantially, making the ICRF compatible with the high-Z wall. This paper explores the characteristics of the AUG three-strap antennas in terms of impurity production, as well as the key role of plasma composition in this process. Numerical simulations were performed using SSWICH and Petra-M (finite element codes) to quantify impurity production and compare with experimental results. Energies of ions falling on antenna limiters (measured with probes) are well predicted by both codes. These tools are then used to further describe the source of the impurity, namely the gross erosion of tungsten from an ICRF antenna, for different plasma mixtures. Results are also compared to spectroscopy data. Ultimately, we show that deleterious effects of the ICRF on plasma surface interactions will be weaker in plasmas containing larger fractions of highly ionized heavier low-Z impurity, which is typically relevant for experiments relying on impurity seeding.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Operational Experience With the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade

The CMS Collaboration has been creating large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we report on how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗