Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Progress on an energy recovery linac upgrade to the Advanced Photon Source

The Advanced Photon Source (APS) is a third-generation storage-ring-based x-ray source that has been operating for more than 13 years and is enjoying a long period of stable, reliable operation. However, major accelerator upgrades are being investigated in order to maintain scientific relevance into the future. One very promising possibility is the use of an energy recovery linac (ERL). In this option, APS would transition from a source based on a stored electron beam to one based on a continuously generated high-brightness electron beam from a linac. Such a source promises dramatically improved brightness and transverse coherence compared to third-generation storage rings. We present a new design for an ERL upgrade that incorporates very long insertion devices. We show that operation at high electron beam energy provides the promise of extremely high brightness for hard x-rays. We also show results of the first start-to-end simulations of an ERL-based x-ray source.

43 PARTICLE ACCELERATORS↗

980-nm, 15-W cw laser diodes on F-mount-type heat sinks

We have studied the key optical emission parameters of laser diodes (emission wavelength, 980 nm; stripe contact width, 95 μm) mounted directly on F- and C-mount-type copper heat sinks, without intermediate elements (submounts). When effectively cooled by a thermoelectric microcooler, the lasers on the F-mount operated stably at output powers up to 20 W. The lasers were tested for reliable operation at an output power of 15 W for 100 h, and no decrease in output power was detected to within measurement accuracy. The experimentally determined maximum total efficiency is 71.7% and the efficiency at a nominal output power of 15 W is 61%. We compare parameters of the laser diodes mounted on C- and F-mounts and discuss the advantages of the F-mounts. (lasers)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Characterization of UV optical components for photon detector calibration in liquid argon TPCs

Large liquid argon time projection chambers (LArTPCs)require stable and well-characterized delivery of ultraviolet (UV)light for in situ calibration of photosensors at cryogenictemperatures. This article reports bench-top and cryogenicmeasurements of the optical components used in a UV lightcalibration system, including multi-mode fused-silica fibers,SMA-to-SMA connectors, optical fiber feedthroughs, andlight-diffuser assemblies. Light loss in several fiber types and SMAconnectors was measured across wavelengths from275–970 mm. In addition,light-loss measurements of the tested fibers after severalliquid-nitrogen thermal cycles showed no statistically significantdegradation relative to baseline measurements, and high-rate pulsedexposure (30–90 million pulses from a275 nm LED) likewise showed nomeasurable aging in jacketed fibers. A compact, palm-sized,3D-printed PEEK diffuser housing with stacked UV-grade fused-silicadiffusers yields Lambertian emission and the most uniform angulardistribution. Optical components exhibiting improved UV transmissionwere deployed successfully in multiple DUNE small- and large-scaleprototypes, demonstrating reliable operation of UV light calibrationsystem. These findings inform component selection and calibrationprocedures for achieving reliable, uniform UV light delivery inlarge-scale cryogenic detectors such as DUNE.

Behera, B. [South Dakota Sch. Mines Tech.] (ORCID:↗

Multi-Edge Graph Convolutional Networks for Power Systems

The exponential electrification of transportation has contributed to highly intermittent load variations in the distribution grid. This uncertainty has raised challenges for distribution system operation and control. Accurate nodal voltage estimation is highly essential for the safe and reliable operation of the grid. Graph convolutional networks have been used in machine-learning-based models for power grid applications like voltage estimation for their ability to capture the network topology of the grid. This paper presents a novel multi-edge graph convolutional layer that considers resistance and reactance as edge attributes. This layer is created by modifying the message-passing function within the graph convolutional network. The novel layer is then used to create a multi-edge graph convolutional network-based surrogate model for estimating voltage in the distribution network with highly uncertain electric vehicle loads. Results indicate improved performance of the multi-edge graph convolutional network model when compared to a standard graph convolutional network model.

Ravi, Abhijith↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴× speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously—previously impossible with conventional tools—while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Vacuum breakdown limit and quantum efficiency obtained for various technical metals using dc and pulsed voltage sources

For the SwissFEL project, an advanced high gradient low emittance gun is under development. Reliable operation with an electric field, preferably above 125 MV/m at a 4 mm gap, in the presence of an ultraviolet laser beam, has to be achieved in a diode configuration in order to minimize the emittance dilution due to space charge effects. In the first phase, a dc breakdown test stand was used to test different metals with different preparation methods at voltages up to 100 kV. The authors show that gradient achieved for rough machined (R{sub a}<200 nm) metal electrodes followed by an argon glow plasma are similar to the one obtained using a mirrorlike electrode (R{sub a}<40 nm). In addition, high gradient stability tests were also carried out over several days in order to prove reliable spark-free operation with a minimum dark current. In the second phase, electrodes with selected materials were installed in the 250 ns full width at half maximum, 500 kV electron gun and tested for high gradient breakdown and for quantum efficiency using an ultraviolet laser. Routine electron beam operation, breakdown-free, at 50 MV/m (6 mm gap, 10 Hz repetition rate) at various charges is now achieved using different metal electrodes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Sources of Operational Flexibility, Greening the Grid

Changes in electricity demand and generation must be constantly balanced to maintain power system stability and reliability. Operational flexibility refers to the ability of a power system to respond to these changes. Power systems are designed and operated to efficiently manage variability and uncertainty in electricity demand and resource availability. Variable renewable energy (VRE) increases this inherent variability and uncertainty, and thus increases the need for flexibility. Systems with significant variability and uncertainty require flexible generators that can rapidly change output, operate efficiently at lower outputs, and operate for short durations. This flexibility in turn can reduce the need to curtail (decrease the output of) solar and wind generation; improve investor confidence in VRE and revenue streams; decrease the risk of negative market pricing (which results when conventional generators cannot turn down to low outputs during times of high VRE output); and reduce environmental impacts by increasing system efficiency and maximizing the utilization of VRE.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reliability of Materials and Components for Solid Oxide Fuel Cells

Planar stack solid-oxide fuel cells (SOFCs) require seals that must operate reliably under demanding conditions for lifetimes of 40000 hours. This includes temperature fluctuations between 800°C and RT during on and off cycles, thermal stresses, oxidizing environments and chemical degradation to name a few. This comprehensive report provides results from long term testing of two commercially available multicomponent barium alkali silicate glasses: SCN and G6, chosen as sealing candidates. In this scope, the glass seals were deposited on YSZ and Al 2 O 3 substrates simulating electrolytes (Zrbased) and coatings (both zirconia and Al 2 O 3 ). The seal-substrate couples were subjected to 800°C under air and steam+H 2 +N 2 environments up to 40000 hours to test their integrity under real operating conditions. Extensive studies on the effects of exposure have been conducted over the span of testing at various time intervals. Within the context of characterization, mechanical properties such as density, roughness, thermal expansion and glass transition, viscosity and wettability behavior; and microstructural properties such as glass chemistries, defect formation (cracks and pores), phase transformations (devitrification) and glass-interface reactions are investigated. Results and discussions are provided with a focus on the degradation of the properties over long term interrupted testing.

30 DIRECT ENERGY CONVERSION↗

Fluor Idaho's Technical and Programmatic Approach That Resolved the Problems with the Integrated Waste Treatment Unit - 19290

The Integrated Waste Treatment Unit (IWTU) is a facility designed to treat approximately 900,000 gallons of radioactive liquid waste, referred to as Sodium Bearing Waste (SBW). IWTU is a Fluidized Bed Steam Reforming process that will be used to treat the SBW to produce a granular sodium carbonate and sodium aluminate product. The product is planned to be managed as remote handled transuranic waste. Construction of the IWTU was completed in 2011 and Critical Decision 4 was achieved in 2012 with the expectation that the treatment of the SBW would be completed in 2012. However, process instabilities and equipment problems prevented the safe and reliable operation of the facility. All of the nonradiological tests of the IWTU had to be stopped prematurely because each time the IWTU was operated, the process would become unstable within a few days of initiating the operation. The instabilities were associated with the primary fluidized bed reaction vessel, the Denitration Mineralization Reformer (DMR). The instabilities included difficulties maintaining fluidization conditions and scale formation within the DMR. Design inadequacies and equipment reliability problems in other parts of the facility also hampered the testing the IWTU. The U.S. Department of Energy (DOE) awarded the Idaho Clean-up contract to Fluor Idaho (Fluor) in 2016. To resolve the issues with the IWTU, Fluor assembled a dedicated team to develop the technical and programmatic strategy to resolve the issues with the IWTU and get it operational. Fluor's approach has successfully resolved the primary issues with the IWTU. As a result of modifications of equipment and operating strategies implemented by Fluor, the core part of the IWTU process now works reliably when processing simulated Sodium Bearing Waste over a wide range of operating conditions. This paper describes Fluor's approach and summarize key steps in the process to resolve the issues with the IWTU. Fluor has used strong fundamentals including a first principles approach and unique program management techniques to solve the technical problems with the IWTU. The successful approach has provided renewed confidence in the IWTU process enabling the troubled project to move forward. Important factors in the success of the project include using a dedicated project team separate from the IWTU line organization, a Technical Review Group, the Chemistry Team and a diverse set of supporting contractors and National Laboratories. Fluor typically used multiple means to validate solutions before testing them in the IWTU. Fluor's successful full-scale demonstration runs of the IWTU confirm the process will reliably produce a compliant, treated waste product over a wide range of operating conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Real-time digital simulation to improve advanced microgrid design

In this study, there are several ways to address energy reliability concerns during an extended power outage. This can include hardening the energy infrastructure to reduce potential loss of power, adding redundant backup systems with larger fuel tanks, and improving generator reliability through better maintenance. While each is valid, they are often expensive to adequately implement. The traditional emergency power approach for decades has been the use of building-tied emergency generators to start up and supply emergency power until the utility can come back on line. Unfortunately, operational experience from many recent extended power outages has shown that emergency backup generators are often mismatched in size with the building energy load, under-maintained such that their operational reliability is well below expected values, and have insufficient fuel to operate for the entire power outage. Here we describe how energy reliability and security can be enhanced with the use of Advanced Microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connected and Learning Based Optimal Freight Management for Efficiency

The management of the future heterogenous fleet is a complex decision-making problem. The heterogenous fleet is emerging as decarbonization technologies are deployed by fleets toward lowering the freight operation emissions in Medium and Heavy-duty vehicles. Traditionally, in fleets characterized by a homogeneous Diesel Internal Combustion Engine (ICE) powertrain, the process of fleet planning and operational optimization unfolds sequentially without the necessity to account for powertrain and vehicle-specific characteristics during dispatch decisions. Fleets with trucks less than 5 years old tend to maintain stable vehicle efficiency with minimal operational reliability risks for fleet managers. However, the landscape changes with the incorporation of emerging powertrain technologies, which lack extensive operational data and service experiences. This includes technologies like hybrid, Electric, Fuel Cell, or alternative fuel ICE. Operational decisions for fleets featuring heterogeneous powertrain technologies and facing limited access to alternative fueling and charging stations become intricate, requiring careful consideration and optimization at each dispatch. The difference in efficiency characteristics of emerging technologies, their range limitations, and the restricted availability of charging/alternative fueling infrastructure, coupled with sensitivity to driving conditions (e.g., EV range reduction in low temperatures) and their impact on component aging (such as batteries), become pivotal factors influencing the reliable and efficient freight transportation. To make the path toward low emission freight transportation efficient and reliable, an AI-assisted fleet management software is developed in this project to help fleet managers in optimizing both adoption of emerging powertrain decarbonization, connected and automated technologies and also operating the fleet after such technologies are deployed as schematically. Freight transportation requirements are different depending on the cargos to be shipped, customer requirements and regions of operations. This further highlights the need for software and digital solutions to tailor deployment and operation of emerging powertrain, connectivity, and automation technologies toward the specific fleet operation requirements. The fleet management optimizer was also integrated with a model of the fleet to simulate the operation of the fleet over 1 year of the baseline fleet operation (250,000+ shipments) indicating the significance of day-to-day variations on emissions and energy consumption of a freight transportation fleet. The results demonstrate ≥20% improvement in freight efficiency in terms of WTW CO2 per ton-mile of cargo shipments while all fleet operation constraints are enforced, and the cost (CapEx and OpEx) is minimized.

33 ADVANCED PROPULSION SYSTEMS↗

Reinstated JET ICRF ILA: Overview and Results

The works undertaken to reinstate the JET ICRF ILA are reviewed. The vacuum matching capacitors were replaced, an extensive calibration of all the measurements in the RF circuit was carried out, new simulation tools were created and new control algorithms were implemented for the – toroidal and poloidal – phase control of the array as well as for the matching of the second stage. A review of the contribution of the reinstated ILA to the JET programme during the last campaigns is given showing namely that the new controls allowed extending the range of the operation to lower (29MHz) and higher (51MHz) frequencies than previously achieved and allowed more flexible and reliable operation. Operation with coupled power levels up to 2.8MW and voltages up to 40kV was achieved. ILA results on plasma are discussed and emphasis is given to the features of interest for ITER.

Dumortier, Pierre↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CMS Data transfer operations after the first years of LHC collisions

CMS experiment utilizes distributed computing infrastructure and its performance heavily depends on the fast and smooth distribution of data between different CMS sites. Data must be transferred from the Tier-0 (CERN) to the Tier-1s for processing, storing and archiving, and time and good quality are vital to avoid overflowing CERN storage buffers. At the same time, processed data has to be distributed from Tier-1 sites to all Tier-2 sites for physics analysis while Monte Carlo simulations sent back to Tier-1 sites for further archival. At the core of all transferring machinery is PhEDEx (Physics Experiment Data Export) data transfer system. It is very important to ensure reliable operation of the system, and the operational tasks comprise monitoring and debugging all transfer issues. Based on transfer quality information Site Readiness tool is used to create plans for resources utilization in the future. We review the operational procedures created to enforce reliable data delivery to CMS distributed sites all over the world. Additionally, we need to keep data and meta-data consistent at all sites and both on disk and on tape. In this presentation, we describe the principles and actions taken to keep data consistent on sites storage systems and central CMS Data Replication Database (TMDB/DBS) while ensuring fast and reliable data samples delivery of hundreds of terabytes to the entire CMS physics community.

Kaselis, Rapolas↗

Massive Contingency Analysis with High Performance Computing

Contingency analysis is a key function in the Energy Management System (EMS) to assess the impact of various combinations of power system component failures based on state estimates. Contingency analysis is also extensively used in power market operation for feasibility test of market solutions. Faster analysis of more cases is required to safely and reliably operate today’s power grids with less marginal and more intermittent renewable energy sources. Enabled by the latest development in the computer industry, high performance computing holds the promise of meet the need in the power industry. This paper investigates the potential of high performance computing for massive contingency analysis. The framework of "N-x" contingency analysis is established and computational load balancing schemes are studied and implemented with high performance computers. Case studies of massive 300,000-contingency-case analysis using the Western Electricity Coordinating Council power grid model are presented to illustrate the application of high performance computing and demonstrate the performance of the framework and computational load balancing schemes.

Computational Load Balancing↗