Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Flexibility-Environmental Outcomes Tradeoffs Workshop Report and Research Roadmap

The U.S. Department of Energy (DOE) and Norway’s Royal Ministry of Petroleum and Energy signed an Annex to a previously signed memorandum of understanding (MOU) in February 2020 to collaborate on hydropower research and development (R&D). This MOU Annex has brought together the DOE’s Office of Energy Efficiency and Renewable Energy Water Power Technology Office and the Norwegian Research Center for Hydropower Technology (HydroCen) to plan and coordinate hydropower R&D activities to increase our understanding of hydropower’s role in the future energy grid and how to minimize and mitigate the subsequent environmental impacts. As part of this MOU Annex, hydropower researchers from the U.S. and Norway have come together to conduct collaborative research on hydropower markets and value, hydropower plant capabilities and constraints, monitoring and control technologies, environmental design solutions, environmental impacts and tradeoffs, flexible operation and planning, and technology innovations. This report presents background information on hydropower environmental regulation in the U.S. and Norway and summarizes content and conclusions from this series of two, three-hour workshops on hydropower generation flexibility and environmental outcomes, that included structured discussions used to identify research priorities and collaborative research opportunities.

13 HYDRO ENERGY↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrating Variable Renewable Energy Into the Grid: Key Issues

To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. The variability of solar and wind compared to traditional sources, coupled with growing demand for electricity, requires changes to power system planning and operations to meet these targets. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE), primarily wind and solar, to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE while maintaining or increasing system stability and reliability. To inform decarbonization strategies, policymakers, regulators, and system operators consider a variety of costs and opportunities associated with VRE integration, which can be organized into five topics: New renewable energy generation and transmission; Power system reliability; Transmission and distribution coordination; Cross-sectoral decarbonization opportunities; Energy equity and justice.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydraulic Isolation of Waste Disposal Areas at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) is the location of several large waste disposal areas that received waste from more than 50 years of operation, production, and research activities at ORNL and the U.S. Atomic Energy Commission's Southern Regional Burial Ground for wastes from more than 50 other facilities. The major burial grounds in the valley are Solid Waste Storage Areas (SWSAs) 4, 5, and 6, where wastes were buried in more than 850 unlined trenches and more than 1500 unlined auger holes. The area includes 3 seepage pits and 3 gravel-filled trenches used by ORNL for the disposal of liquid low level wastes. The burial grounds contained several hundred thousand cubic yards of waste, and the combined inventory of the burial grounds and liquid disposal sites was well over 1 million curies. The Record of Decision for Interim Actions for the Melton Valley Watershed at ORNL selected hydraulic isolation of major waste sources as the primary mechanism for remediation of the watershed. Isolation was to be accomplished mainly through the construction of multi-layer caps over the burial grounds, seepage pits, and trenches. Groundwater diversion and collection systems were installed along the up-gradient and down-gradient edges, respectively, of selected caps to enhance the performance of the isolation system. The waste areas were covered with both Resource Conservation and Recovery Act (RCRA)-type and isolation multi-layer caps. A total of 13 multi-layer caps covering 58.7 hectares (ha) (plan view) were constructed in Melton Valley between 2003 and 2006. The project encountered considerable challenges, not the least of which was its scale, involving simultaneous construction activities at widely scattered sites across the 430-ha watershed. Detailed planning and coordination enabled year-round fieldwork, an essential requirement necessary to retain a skilled, experienced workforce and meet the contract milestone for completion. Other factors key to the success of the project involved the use of an on-site borrow area and construction of a dedicated haul road for transfer of materials from the borrow area to the capping sites. In summary: Remedy effectiveness data obtained during 2007 for the Melton Valley ROD actions collectively indicate that the remedy is generally operating and functioning as planned. Contaminant releases of the principal contaminants of concern in Melton Valley have decreased significantly during and since remediation of the contaminant source areas. Hydrologic isolation systems at the burial grounds functioned as intended as demonstrated by attainment of groundwater level goals in most areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Maneuver Planning With Connected and Automated Vehicles for Boosting Traffic Efficiency

Connected and automated vehicles (CAVs) have the potential to improve traffic throughput and achieve a more efficient utilization of the available roadway infrastructure. They also have the potential to reduce energy consumption through traffic motion harmonization, even when operating in mixed traffic with other human-driven vehicles. The key to realizing these potentials are coordinated control schemes that can be implemented in a distributed manner with the CAVs. In this paper, we propose a distributed predictive control framework that features a two-dimensional maneuver planner incorporating explicit coordination constraints between connected vehicles operating in mixed traffic at various penetration levels. Here, the framework includes a distributed implementation of a reference speed assigner that estimates local traffic speed from on-board measurements and communicated information. We present an extensive evaluation of the proposed framework in traffic micro-simulations at various CAV penetrations from traffic flow, energy use, and lane utilization points of view. Results are compared to a baseline scenario with no CAVs, as well as, a benchmark one-dimensional planner.

33 ADVANCED PROPULSION SYSTEMS↗

Using Information Automation and Human Technology Integration to Implement Integrated Operations for Nuclear

The purpose of the research effort described in this report is to develop and demonstrate an approach to the design and implementation of advanced, automated systems intended to increase operational efficiencies at nuclear power plants. In particular, we describe methods for considering human-technology integration (HTI) issues throughout the various phases of system design, test, and implementation and how these considerations help promote effective design. This research project will develop planning tools and comprehensive guidance on how HTI principles and methods, in combination with information automation technologies, can enable effective data integration and coordination for full nuclear plant modernization. Specifically, this research project will develop an approach to automate the mapping of data from plant systems and processes to application needs, thereby significantly reducing the amount of human workload currently required for the execution of these tasks. In addition to developing an automated solution as a replacement for these tasks, this research will also analyze digitalization’s effectiveness in reducing operational costs of compliance related activities. Compliance activities are estimated to account for as much as 50% of operations and maintenance (i.e., non-fuel and non-capital) costs of plant operation.

97 MATHEMATICS AND COMPUTING↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Market-Based Coordination of Thermostatically Controlled Loads—Part II: Unknown Parameters and Case Studies

This two-part paper considers the coordination of a population of Thermostatically Controlled Loads (TCLs) with unknown parameters to achieve group objectives. The problem involves designing the bidding and market clearing strategy to motivate self-interested users to realize efficient energy allocation subject to a peak power constraint. The companion paper (Part I) formulates the problem and proposes a load coordination framework using the mechanism design approach. To address the unknown parameters, Part II of this paper presents a joint state and parameter estimation framework based on the expectation maximization algorithm. The overall framework is then validated using real-world weather data and price data, and is compared with other approaches in terms of aggregated power response. Simulation results indicate that our coordination framework can effectively improve the efficiency of the power grid operations and reduce power congestion at key times.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study

The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Integrating 175 Gigawatts of Renewable Energy into India's Electric Grid - A Detailed Look at the Western Region

The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Integrating 175 Gigawatts of Renewable Energy into India's Electric Grid - A Detailed Look at the Southern Region

The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: to better anticipate, understand, and mitigate system constraints that could affect RE integration; and to provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Integrated Waste Feed Delivery Plan for the Direct Feed Low-Activity Waste Mission - 17160

In order to begin tank waste treatment and reduce the risk to the liquid waste cleanup mission, a plan to directly feed the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility before other WTP facilities has been implemented. Implementation requires another facility, the Low-Activity Waste Pretreatment System (LAWPS), to generate LAW from tank waste supernatant, along with upgrades to the existing tank farm facilities to provide waste feed and receive process returns. The Integrated Waste Feed Delivery Plan (IWFDP) presents the strategy for reliably delivering compliant waste feed to the LAWPS and subsequently WTP to safely and efficiently accomplish the direct feed LAW (DFLAW) mission. Modifications to existing systems and installation of new systems will be coordinated to meet WTP startup, commissioning, and processing needs. The IWFDP presents the process approach, feed campaign plans, and a list of infrastructure projects required to upgrade the DST system in order to support DFLAW start-up and operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗