Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimal projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere (Final Technical Report)

The Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere project’s goal was to expand Low-to-Moderate Income (LMI) solar access for homeowners and renters. The LIFT project researched and gathered data on 453 LMI community solar project across the country. Following three years of research, the project delivered three groundbreaking research papers in June 2022, focused on 1) customer experience, 2) the growth of community solar programs, and 3) project-level financial best practices for serving LMI communities. These were followed by a user-friendly web-based Toolkit allowing users to interact with project data and key findings in November 2022. The customer experience research examined community solar subscribers’ primary motivations to join and remain satisfied with projects. Our research identified 453 projects across the country that dedicated some portion of the system capacity to LMI households. Seventeen of these projects participated in the LIFT customer experience research, allowing the project team to survey their customers and gain insight into how LMI subscribers feel about community solar and the programs that serve them. Subscribers in our sample indicated that the most critical issue that motivated them to participate in their program, however, was not savings but helping the environment. This was true for both LMI and non-LMI subscribers. Helping the environment was also the most important issue for LMI subscribers to measure how well their program was working for them. LIFT also explored how rapidly community solar has grown since its inception in 2006, publishing results in the Growth of U.S. Community Solar Serving LMI Households report. The results showed that community solar projects serving LMI households are one of the fastest growing segments of the solar industry. The report identifies and recommends ways developers should overcome real or perceived risks to LMI customer acquisition and subscriber management. Through the analysis of community solar project finance research, LIFT showed that most community solar projects serving LMI households are financed in the same ways mainstream community solar projects are financed. The value stacks and financial returns are no different, although LMI inclusion and participation rate varied across programs in our sample, ranging from between 10% and 100%. Based on the findings from the LIFT research, the team built a web-based user-friendly Toolkit, consisting of case studies, project finance best practices, and several tools built around the national dataset of 453 community solar projects that serve LMI households. These allow users to engage with the dataset in multiple ways; to explore the landscape of LMI community solar in the U.S., and to design community solar projects to optimize LMI inclusion, equity, and savings levels. The Toolkit also includes a library of LIFT-generated and LIFT-curated resources for users to learn more about how to best serve LMI communities through community solar. LIFT officially published the Toolkit on October 31, 2022, followed by a launch event (public webinar) on November 17, 2022. The core LIFT partners continue to engage in outreach and dissemination efforts to promote the LIFT Toolkit and research publications. Our driving motivation is to continue enabling solar developers to leverage the findings of this three-year research effort. By implication, the LIFT Toolkit is designed for use by utilities, energy service providers, and financiers or investors as a learning and decision-making tool to rapidly scale project models that optimize LMI inclusion and maximize real household savings.

14 SOLAR ENERGY↗

Efficiency Improvements to the Displacement Based Multilevel Structural Optimization Algorithm

Multilevel Structural Optimization (MSO) continues to be an area of research interest in engineering optimization. In the present project, the weight optimization of beams and trusses using Displacement based Multilevel Structural Optimization (DMSO), a member of the MSO set of methodologies, is investigated. In the DMSO approach, the optimization task is subdivided into a single system and multiple subsystems level optimizations. The system level optimization minimizes the load unbalance resulting from the use of displacement functions to approximate the structural displacements. The function coefficients are then the design variables. Alternately, the system level optimization can be solved using the displacements themselves as design variables, as was shown in previous research. Both approaches ensure that the calculated loads match the applied loads. In the subsystems level, the weight of the structure is minimized using the element dimensions as design variables. The approach is expected to be very efficient for large structures, since parallel computing can be utilized in the different levels of the problem. In this paper, the method is applied to a one-dimensional beam and a large three-dimensional truss. The beam was tested to study possible simplifications to the system level optimization. In previous research, polynomials were used to approximate the global nodal displacements. The number of coefficients of the polynomials equally matched the number of degrees of freedom of the problem. Here it was desired to see if it is possible to only match a subset of the degrees of freedom in the system level. This would lead to a simplification of the system level, with a resulting increase in overall efficiency. However, the methods tested for this type of system level simplification did not yield positive results. The large truss was utilized to test further improvements in the efficiency of DMSO. In previous work, parallel processing was applied to the subsystems level, where the derivative verification feature of the optimizer NPSOL had been utilized in the optimizations. This resulted in large runtimes. In this paper, the optimizations were repeated without using the derivative verification, and the results are compared to those from the previous work. Also, the optimizations were run on both, a network of SUN workstations using the MPICH implementation of the Message Passing Interface (MPI) and on the faster Beowulf cluster at ICASE, NASA Langley Research Center, using the LAM implementation of UP]. The results on both systems were consistent and showed that it is not necessary to verify the derivatives and that this gives a large increase in efficiency of the DMSO algorithm.

Plunkett, C. L.↗

ASYMPTOTICALLY OPTIMAL HIGH-ORDER ACCURATE ALGORITHMS FOR THE SOLUTION OF CERTAIN ELLIPTIC PDEs

The main goal of the project, "Asymptotically Optimal, High-Order Accurate Algorithms for the Solution of Certain Elliptic PDE's" (DE-FG02-03ER25577) was to develop fast, high-order algorithms for the solution of scattering problems and spectral problems of photonic crystals theory. The results we obtained lie in three areas: (1) asymptotically fast, high-order algorithms for the solution of eigenvalue problems of photonics, (2) fast, high-order algorithms for the solution of acoustic and electromagnetic scattering problems in the inhomogeneous media, and (3) inversion formulas and fast algorithms for the inverse source problem for the acoustic wave equation, with applications to thermo- and opto- acoustic tomography.

97 MATHEMATICS AND COMPUTING↗

Dual-energy imaging of the chest: Optimization of image acquisition techniques for the 'bone-only' image

Experiments were conducted to determine optimal acquisition techniques for bone image decompositions for a prototype dual-energy (DE) imaging system. Technique parameters included kVp pair (denoted [kVp{sup L}/kVp{sup H}]) and dose allocation (the proportion of dose in low- and high-energy projections), each optimized to provide maximum signal difference-to-noise ratio in DE images. Experiments involved a chest phantom representing an average patient size and containing simulated ribs and lung nodules. Low- and high-energy kVp were varied from 60-90 and 120-150 kVp, respectively. The optimal kVp pair was determined to be [60/130] kVp, with image quality showing a strong dependence on low-kVp selection. Optimal dose allocation was approximately 0.5--i.e., an equal dose imparted by the low- and high-energy projections. The results complement earlier studies of optimal DE soft-tissue image acquisition, with differences attributed to the specific imaging task. Together, the results help to guide the development and implementation of high-performance DE imaging systems, with applications including lung nodule detection and diagnosis, pneumothorax identification, and musculoskeletal imaging (e.g., discrimination of rib fractures from metastasis)

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Robust eigenstructure assignment by a projection method - Applications using multiple optimization criteria

A methodology for robust eigenstructure assignment for multivariable feedback systems is presented. The algorithm is based upon a pole placement technique using projections onto subspaces of admissible eigenvectors. New ideas are introduced to generate target (desired) sets of unitary eigenvectors and determine optimal feasible eigenvectors in a least-square sense. Useful connections are established between the pole-placement by independent modal space control and the method introduced in this paper. A multicriterion optimization algorithm is also presented, which takes efficient advantage of the present eigenstructure assignment method. These developments show significant improvement over an earlier version of this algorithm in both computational cost and accuracy. This optimization process appears to be numerically robust and suitable for high-dimensional multicriterion optimizations; it is especially attractive for computer-aided design of control systems.

Rew, D. W.↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A structured data model frame for human factors application - 175

Building a Human Factors analysis and Verification and Validation case for new control rooms and even for control room modifications is a highly labor intensive project. Any optimization that can be made in the process translates into savings in the overall control room project schedule and budget. Several support tools from word, to excel, mind maps and databases have been traditionally used by human factors practitioners to conduct the analysis and document its results. While the use of these tools has had satisfactory results, they don't provide in our experience strong enough means for configuration control management, to avoid duplicities, streamline the analysis processes and allow collaborative team efforts. This paper documents how the established practices (methods, processes and tools) were questioned, which were the sources for comparison and how the results were translated into requirements for the new tool constituting the data frame model for Human Factors Engineering applications. The exercise has allowed us to evaluate the efficiency of our current practices in comparison to previous ones while improving our compliance with the quality assurance standards. (authors)

42 ENGINEERING↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

combinatorial optimization with demands (LDRD Final Report)

This report summarizes the research conducted and results obtained under the Laboratory Directed Research and Development (LDRD) project, “Combinatorial Optimization with Demands ,” from October 2010 to September 2012. Complex resource allocation problems are ubiquitous in mission-driven applications. We investigated resource allocation problems endowed with additional parameters called demands, which allow for richer modeling. Demand endowed resource allocation problems are considerably harder to solve than their traditional counterparts, and we developed a conceptually simple but powerful new framework called iterative packing which allowed us to address the added complexity of demands. By leveraging iterative packing , we designed approximation algorithms to solve a large class of hard resource allocation problems with demands. Approximation algorithms are efficient heuristics which also offer a performance guarantee on the worst case deviation from the cost of an optimal solution. Our algorithms offer better performance guarantees over previously known algorithms; moreover, we are able to show that our algorithms provide performance guarantees that are likely close to best possible.

Parekh, Ojas↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗

SU-G-BRA-08: Diaphragm Motion Tracking Based On KV CBCT Projections with a Constrained Linear Regression Optimization

Purpose: To develop a novel strategy to extract the respiratory motion of the thoracic diaphragm from kilovoltage cone beam computed tomography (CBCT) projections by a constrained linear regression optimization technique. Methods: A parabolic function was identified as the geometric model and was employed to fit the shape of the diaphragm on the CBCT projections. The search was initialized by five manually placed seeds on a pre-selected projection image. Temporal redundancies, the enabling phenomenology in video compression and encoding techniques, inherent in the dynamic properties of the diaphragm motion together with the geometrical shape of the diaphragm boundary and the associated algebraic constraint that significantly reduced the searching space of viable parabolic parameters was integrated, which can be effectively optimized by a constrained linear regression approach on the subsequent projections. The innovative algebraic constraints stipulating the kinetic range of the motion and the spatial constraint preventing any unphysical deviations was able to obtain the optimal contour of the diaphragm with minimal initialization. The algorithm was assessed by a fluoroscopic movie acquired at anteriorposterior fixed direction and kilovoltage CBCT projection image sets from four lung and two liver patients. The automatic tracing by the proposed algorithm and manual tracking by a human operator were compared in both space and frequency domains. Results: The error between the estimated and manual detections for the fluoroscopic movie was 0.54mm with standard deviation (SD) of 0.45mm, while the average error for the CBCT projections was 0.79mm with SD of 0.64mm for all enrolled patients. The submillimeter accuracy outcome exhibits the promise of the proposed constrained linear regression approach to track the diaphragm motion on rotational projection images. Conclusion: The new algorithm will provide a potential solution to rendering diaphragm motion and ultimately improving tumor motion management for radiation therapy of cancer patients.

60 APPLIED LIFE SCIENCES↗

Advanced Materials for the Lunar Surface: Multiscale Computational Design of Refractory Alloys and Carbides

Emerging operational environments, such as the lunar surface, present novel challenges for NASA and drive the need for advanced materials in applications like fission surface power systems. To address these demands, computational materials science is rapidly evolving to augment or replace costly and hazardous empirical testing. Although materials selection at NASA remains predominantly experimentally driven, advanced simulation methodologies are being steadily integrated into the engineering lifecycle. This work details the application of multiscale simulation techniques—including first-principles calculations, CALPHAD, dislocation dynamics, and molecular dynamics—at NASA's Ames Research Center to evaluate advanced materials for extreme environments. First, we present contributions to the Space Nuclear Propulsion Project. Be-cause propellant channel coatings in nuclear thermal rockets must withstand high-pressure, high-temperature hydro-gen, optimizing these materials is critical. First-principles calculations were employed to establish a rigorous quantitative and qualitative understanding of the behavior of the refractory carbides ZrC, NbC, and their mixtures in high-enthalpy hydrogen environments. This necessitated the generation of high-fidelity thermodynamic models for both stoichiometric and carbon-depleted carbides, both with and without the presence of hydrogen. Furthermore, we highlight efforts under the Refractory Alloy Additive Manufacturing Build Optimization (RAAMBO) project, where existing and novel alloy compositions were assessed for additive manufacturing printability and subsequent performance in applications such as heat pipes and rocket nozzle extensions. This was accomplished through a comprehensive multiscale simulation framework that bridged the gap from the nanometer to the millimeter scale. Across both initiatives, rigorous validation against empirical data was prioritized. By systematically employing a verified and validated computational frame-work, we demonstrate how simulation effectively supports multidisciplinary engineering efforts, builds project-wide confidence, and drives critical materials development.

computational materials↗

Enabling Production of Low Carbon Emissions Steel through CO 2 Capture from Blast Furnace Gases at Cleveland Cliffs’ 5 mtpa Steel Plant at Burns Harbor, Indiana

Dastur International Inc. has prepared a DOE-funded Pre-front-end engineering design (Pre-FEED) study to capture up to 2.8 mtpa of CO 2 from the available Blast Furnace (BF) gases at the Burns Harbor steel plant operated by Cleveland Cliffs in Burns Harbor, Indiana. The project consists of an amine solvent based pre-combustion carbon capture system, along with a unique BF gas conditioning process which significantly optimizes the project design and architecture in terms of higher volumes (2.8 mtpa vis-à-vis 1.6 mtpa without conditioning) & concentration (32 vol% in conditioned gas vs. 22% in raw BF gas) of CO 2 , which can be captured using a single train, resulting in reduced size and capital cost of the CO 2 capture island, and improved overall economics on a $\$$/tCO 2 captured basis.

42 ENGINEERING↗

The Eagle ALDRIS (Agile Low-Does Radiographic Imaging System)

The overall project was to design a mobile (truck-based) cargo scanning system that can be deployed at different stations according to need. In addition, the project would optimize the use of the electron beam thereby reducing the overall radiation produced and to help make the radiation shielding lighter. The SLAC work for this project done through this CRADA was to design the beam-line from the output of the alpha-magnet at the end of the Varian linac to the photon production target. The beam is required to hit the photon production target at the same point but with a range of vertical angles from +/- 25°. In addition, the scope of work by SLAC was to provide an alternate design for the linac based on new linac and RF source technology developed at SLAC.

43 PARTICLE ACCELERATORS↗

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee↗