Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 3: Detailed data. Part 1: Catalog of initiatives, functional options, and future environments and goals

The following areas were discussed in relation to a study of the commonality of space vehicle applications to future national needs: (1) index of initiatives (civilian observation, communication, support), brief illustrated description of each initiative, time periods (from 1980 to 2000+) for implementation of these initiatives; (2) data bank of functional system options, presented in the form of data sheets, one for each of the major functions, with the system option for near-term, midterm, and far-term space projects applicable to each subcategory of functions to be fulfilled; (3) table relating initiatives and desired goals (public service and humanistic, materialistic, scientific and intellectual); and (4) data on size, weight and cost estimations.

Bekey, I.↗

The Liquid Hydrogen Option for the Subsonic Transport: A status report

Continued subsonic air transport design studies include the option for a liquid hydrogen fuel system as an aircraft fuel conservation measure. Elements of this option discussed include: (1) economical production of hydrogen; (2) efficient liquefaction of hydrogen; (3) materials for long service life LH2 fuel tanks; (4) insulation materials; (5) LH2 fuel service and installations at major air terminals; (6) assessment of LH2 hazards; and (7) the engineering definition of an LH2 fuel system for a large subsonic passenger air transport.

Korycinski, P. F.↗

Evaluation of options for process sequences

A methodology is being developed to ease the comparative evaluation of competing options in the process sequence for the manufacture of photovoltaic solar energy utilization systems. This evaluation will largely involve process economic analyses but will place equal emphasis on other characteristics, including energy consumption and environmental effects of the process options. Early analyses have been performed for the energy consumption in the arc furnace reduction of SiO2, for the costs and energy consumption in CZ crystal pulling and various slicing processes, and for the total energy consumption of process sequence through the completed module.

Wolf, M.↗

Multirole cargo aircraft options and configurations

A future requirements and advanced market evaluation study indicates derivatives of current wide-body aircraft, using 1980 advanced technology, would be economically attractive through 2008, but new dedicated airfreighters incorporating 1990 technology, would offer little or no economic incentive. They would be economically attractive for all payload sizes, however, if RD and T costs could be shared in a joint civil/military arrangement. For the 1994-2008 cargo market, option studies indicate Mach 0.7 propfans would be economically attractive in trip cost, aircraft price and airline ROI. Spanloaders would have an even lower price and higher ROI but would have a relatively high trip cost because of aerodynamic inefficiencies. Dedicated airfreighters using propfans at Mach 0.8 cruise, laminar flow control, or cryofuels, would not provide any great economic benefits. Air cushion landing gear configurations are identified as an option for avoiding runway constraints on airport requirements and/or operational constraints are noted.

Conner, D. W.↗

Interplanetary trajectory options for project Galileo

The paper explores interplanetary trajectory options for project Galileo. The classes of trajectory options studied include direct earth-Jupiter trajectories for combined and split orbiter/probe missions, Mars powered swingbys, earth-Venus-earth gravity assists, and earth-deep space delta V-earth gravity assists.

Nock, K. T.↗

Prototype solar power satellite options

The choice of options for the prototype solar power satellite is addressed relative to risk and cost. Emphasis is placed on the reduction of the risk of failure. Risk is the program cost multiplied by the reduction in probability of program success due to the risky action. Four classes of risk are identified. It is suggested that prototyping would reduce the technical risk as well as reduce the effects of the other three types of risk by allowing them to be quantified earlier. Prototype demonstration requirements addressed include electromagnetic power link feasibility demonstration, component integration verification, construction technology verification, and cost performance verification. Specific prototype requirements are listed and prototyping options are given in tabular form.

Sperber, B. R.↗

Architectural options for space stations in the context of the space infrastructure

The role of space stations in the space element infrastructure anticipated for the end of the 20th century is discussed. Various architectures for space stations designed to function as part of the infrastructure are examined with respect to a set of potential objectives for the stations. Architectural options are described that range from a minimum station of low capability and cost to an expensive station with a full operations capability and high growth potential. The capabilities, growth potentials, and likely costs of the options are compared, and the association between functional capabilities and likely cost is considered. It is concluded that the cost of a space station is intimately related to its architecture and that a larger initial investment must be made to satisfy more ambitious objectives.

Bekey, I.↗

Technical draft study report for TOPEX satellite options study, volume 1

The use of two spacecraft for adaptation to the TOPEX mission, namely the P80-1 and the GPS phase 2 are considered. The mission involved three mission options, each option varying in payload definition, payload weight, orbital altitude and payload power requirements. The P80-1 spacecraft is an Air Force Space Test Program satellite which carries a number of payloads to an orbital altitude of 400 n.mi. at a minimum inclination of 72.5 deg, and which has an orbital life capability of three years. The GPS phase 2 spacecraft is the operational satellite for the Global Positioning NAVSTAR navigation constellation provided for all service (and commercial) use.

Source record↗

Population Control of Self-Replicating Systems: Option C

From the conception and development of the theory of self-replicating automata by John von Neumann, others have expanded on his theories. In 1980, Georg von Tiesenhausen and Wesley A. Darbro developed a report which is a "first' in presenting the theories in a conceptualized engineering setting. In that report several options involving self-replicating systems are presented. One of the options allows each primary to generate n replicas, one in each sequential time frame after its own generation. Each replica is limited to a maximum of m ancestors. This study involves determining the state vector of the replicas in an efficient manner. The problem is cast in matrix notation, where F = fij is a non-diagonalizable matrix. Any element fij represents the number of elements of type j = (c,d) in time frame k+1 generated from type i = (a,b) in time frame k. It is then shown that the state vector is: bar F(k)=bar F (non-zero) X F sub K = bar F (non-zero) xmx J sub kx m sub-1 where J is a matrix in Jordan form having the same eigenvalues as F. M is a matrix composed of the eigenvectors and the generalized eigenvectors of F.

Mccord, R. L.↗

Space station needs, attributes and architectural options. Volume 1: Executive summary NASA

The uses alignment plan was implemented. The existing data bank was used to define a large number of station requirements. Ten to 20 valid mission scenarios were developed. Architectural options as they are influenced by communications operations, subsystem evolvability, and required technology growth are defined. Costing of evolutionary concepts, alternative approaches, and options, was based on minimum design details.

Source record↗

Space station needs, attributes, and architectural options: Space station program cost analysis

This report documents the principal cost results (Task 3) derived from the Space Station Needs, Attributes, and Architectural Options study conducted for NASA by the McDonnell Douglas Astronautics Company. The determined costs were those of Architectural Options (Task 2) defined to satisfy Mission Requirements (Task 1) developed within the study. A major feature of this part of the study was the consideration of realistic NASA budget constraints on the recommended architecture. Thus, the space station funding requirements were adjusted by altering schedules until they were consistent with current NASA budget trends.

Cowls, R. S.↗

Space Station Systems Analysis Study. Volume 2: Program options, book 1, parts 1 and 2

Program options are defined and requirements are determined for integrating crew, mass, volume, and electrical power for a space construction base which incorporates the space shuttle external tanks. Orbits, stabilization, flight control hardware, as well as modules and aids for orbital assembly and servicing are considered. The effectiveness of various program options for life science and radio astronomy missions, for the solar terrestrial observatory, and for public service platforms is assessed. Technology development items are identified and costs are estimated.

Source record↗

Thermal management system options for high power space platforms

Thermal Management System (TMS) design options for a high power (75kWe), low earth orbit, multimodule space platform were investigated. The approach taken was to establish a baseline TMS representative of current technology, and to make incremental improvements through successive subsystem trades that lead to a candidate TMS. The TMS trades included centralized and decentralized transport, single-phase and two-phase transport, alternate working fluids, liquid loop and heat pipe radiators, deployed fixed, body mounted and steerable radiators, and thermal storage. The subsystem options were evaluated against criteria such as weight, TMS power requirement, reliability, system isothermality penalty, and growth potential.

Sadunas, J. A.↗

Space station propulsion options

The selection of the propulsion system for the Space Station represents a complex issue. The present paper provides a summary of the Station design factors which dictate the propulsion requirements, taking into account approaches for meeting these requirements. Factors which affect propulsion system selection are related to thrusting strategy, volume and mass limitations, safety and contamination, electrical power, time phasing, synergistic opportunities, propellant scavenging, water electrolysis, and free-flyers. In a discussion of propulsion systems, attention is given to monopropellant options, bipropellant options, and resistojets.

Wilkinson, C. L.↗

Trajectory options for the Mariner Mark II Tempel 2 rendezvous mission

Recent schedule changes have motivated a reassessment of the mission options for the Mariner Mark II Comet Rendezvous Asteroid Flyby. A new baseline mission has been selected, which will launch in September 1992 and arrive at comet Tempel 2 in December 1996. The geometry of the comet's orbit imposes on the mission total delta-V requirements that can best be met by selection of a delta-V-EGA trajectory, during which an earth gravity assist is used to improve mission performance. There is considerable freedom in the choice of comet arrival date and asteroid flyby targets; associated with each potential asteroid flyby is a different penalty in terms of delta-V and comet arrival data. Analysis of the trajectory and the asteroid flyby options will continue throughout the early phases of the Project.

Stetson, D. S.↗

An expert system for choosing the best combination of options in a general-purpose program for automated design synthesis

An expert system to aid users of the Automated Design Synthesis (ADS) general-purpose optimization program has been developed. ADS has approximately 100 combinations of strategy, optimizer, and search options from which to choose. This expert system aids the user in choosing the best combination of options for solving a particular problem. The system is written in LISP, contains about 200 rules, and executes on DEC-VAX and IBM PC/XT computers.

Rogers, J. L., Jr.↗

Manned Mars mission astronomy options

Astronomical observations during the transit phase, in orbit about Mars, and from the surface present important scientific objectives. Primary astronomical objectives are being summarized by J. Burns (University of New Mexico). Additional or alternative options will be introduced here, together with their strengths, weaknesses, viability, and value. It is important to note at the outset that not all possible options are necessarily important or viable.

Suess, S. T.↗

MAX: A space station computer option

Information on Max, a space station computer option, is given in viewgraph form. The computer option is characterized by embedded, real-time applications; synchronous, cyclic operation and asynchronous, event driven operation; computationally intensive and data intensive processing; a wide range of throughput and memory requirements; a range of fault tolerant requirements from none to full; and maintainability, including capability for on-line substitution in critical systems.

Smith, D. B.↗