Search NASA⌕ Search

SEARCH · Search NASA

Results for “Outage optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand while simultaneously maintaining air travel as one of the safest forms of transportation. One of the reasons for this success is the ability of the air traffic control system and the operators to adapt and accommodate to situations that routinely disrupt normal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators’ ability to control. These factors can lead to states where automation is unable to properly handle these issues, and therefore air traffic controllers and pilots have to intervene — ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions, complexity increases. This is because, under these conditions humans are required to make tactical decisions in response to external factors. This results in a departure from the original strategic plan where operations would be more efficiently managed. Human operators manage airspace complexity under rigid regulations but in a constantly changing environment. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. Some prior studies devised airspace complexity metrics in commercial aviation and related these metrics to controller workload. The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic — including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to ours that identifies such contributing factors or precursor patterns.

Precursor↗

Opportunities for Clean Energy in Natural Gas Well Operations: Preprint

The oil and gas industry is increasingly seeking operational improvements to reduce both costs and emissions. Currently, oil and gas directly and indirectly contributes forty-two percent of global greenhouse gas emissions, with over twenty percent of the industry’s emissions coming from operations. Given the opportunity for emissions reductions, this study describes techno-economic analysis evaluating opportunities for distributed energy generation and storage technologies – including solar photovoltaics (PV), distributed wind energy, and battery energy storage – to support companies’ energy cost savings targets, clean energy goals, and energy resiliency needs at hypothetical upstream well sites in the Marcellus Shale in Pennsylvania, both grid-connected and off-grid. These technologies reduce the site’s consumption of grid electricity and natural gas and thus help reduce Scope 1 and 2 emissions associated with electricity and natural gas. For each scenario, a cost of avoided emissions was calculated; these values can be compared to internal organizational value placed on emissions reductions, compared to other emissions reduction strategies such as energy efficiency, reducing flaring, and direct carbon capture and sequestration, and compared to existing (albeit limited) U.S. carbon markets such as California’s Low Carbon Fuel Standard. The study also explores the ability of these electric clean energy technologies to support site resiliency against utility outages.

42 ENGINEERING↗

Opportunities for Clean Energy in Natural Gas Well Operations

The oil and gas industry is increasingly seeking operational improvements to reduce both costs and emissions while improving resilience against electric grid outages. This study describes techno-economic analysis of opportunities for distributed energy generation and storage technologies to support companies' energy cost savings, clean energy, and energy resiliency goals. Specifically, the analysis evaluates solar photovoltaics (PV), distributed wind energy, and battery energy storage at hypothetical upstream well sites in the Marcellus Shale in Pennsylvania, both grid-connected and off-grid. Results indicate opportunity for solar PV to reduce operational costs. Additionally, these technologies reduce the site's consumption of grid electricity and natural gas and thus can help reduce Scope 1 and 2 emissions associated with electricity and natural gas consumption. For each emissions reduction scenario, a cost of avoided emissions was calculated; these values can be compared to internal organizational value placed on emissions reductions, compared to other emissions reduction strategies such as energy efficiency, reducing flaring, and direct carbon capture and sequestration, and compared to existing (albeit limited) U.S. carbon markets such as California's Low Carbon Fuel Standard. Results indicate that the associated costs of emissions reductions via distributed renewables are competitive with these options and markets. The study also explores the ability of these electric clean energy technologies to support site resiliency against utility outages.

42 ENGINEERING↗

Final Scientific Technical Report for "Microgrid RD&D and Testing of PIDC and PWD Systems"

Alstom Grid Inc’s (ALSTOM Grid) Research Design and Development (RD&D) project, “Microgrid RD&D and Testing for PIDC and PWD” was conducted in partnership with Philadelphia Industrial Development Corporation (PIDC) in its role as owner’s representative and manager of a vibrant commercial and industrial community, involving critical loads in one of the nation’s largest unregulated, non-military electric distribution systems. PIDC needed to develop solutions to address the planned considerable growth in Distributed Energy Resources (DER) Combined Heat Plan (CHP), Renewables, Distributed Generation (DG), Demand Response (DR) and Storage. In supporting the corporate objective, PIDC needed a new class of control systems for achieving enhanced energy resilience of their critical infrastructure operation during adverse conditions together with carbon emission reduction and optimization of the overall system operation economics through system energy efficiency during normal and emergency operating conditions. Additionally, PIDC anticipated the need to support a new class of commercial agreements with tenants, such as those for Urban Outfitters, for guaranteed one hundred percent (100%) grid resilience and electric power supply in case of utility outage conditions. The project was designed to address the challenges for the commercial & industrial (C&I) communities. But more importantly, the project included development of scalable and replicable solutions intended to target a multitude of the nation’s electric distribution communities. The project researched and developed a fully comprehensive prototype consisting of microgrid operation and control functions including islanding, synchronization and reconnection, protection, voltage, frequency, and power quality management, dispatch, and system resiliency. The project provided the foundation required to significantly enhance the overall national objectives set by the DOE for energy resilience, emission reduction and system energy efficiency improvement, including protection of critical infrastructure and public resources.

14 SOLAR ENERGY↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Network reconfiguration and distributed energy resource scheduling for improved distribution system resilience

Electric utility companies work to restore as much load as possible after power outages caused by extreme weather events. In this paper, an outage management strategy is proposed to enhance distribution system resilience through network reconfiguration and distributed energy resources (DERs) scheduling. After a line fault, the proposed algorithm can identify radial network topology based on the rank of the incidence matrix. The reconfiguration is implemented by switching tie lines and sectionalizing lines. With the new network topology, an optimal DER scheduling problem is solved to minimize the accumulative cost for dispatchable DER operation and load reduction. Finally, the optimal topology that minimizes the accumulative cost is selected from all radial topologies. The computational workload is relatively low because only linear programming needs to be solved. Using the case studies of the IEEE 69-bus and IEEE 123-bus systems, we consider the worst-case scenarios in which faults occur in the upstream feeder. The simulation results demonstrate that the proposed strategy allows for a relatively high percentage of the load to remain in service after line faults. Furthermore, compared with microgrid-formation approaches, the proposed strategy has advantages when applied to the distribution systems with several normally-open tie lines and low DER penetration.

42 ENGINEERING↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Quantifying Technical Diversity Benefits of Wind as a Distributed Energy Resource

Distributed energy resources are increasingly used in power distribution systems and microgrids to supply cost competitive power, improve resilience, and provide a host of grid services. Diversifying variable renewable resources (e.g., by combining wind with solar) can increase energy usage efficiency and improve system resilience. However, when grid optimization and resilience studies consider multiple renewable resources, diversity benefits are usually captured only implicitly in the results of location-specific economic optimization. In this paper, metrics are introduced to express the technical value of resource diversity independent of jurisdiction-specific market structures. Specifically, marginal energy usage efficiency metrics are developed to quantify the ability of new distributed generation to produce useful energy and an incremental sustainable ride through metric is developed to express improvement in grid outage ride through capability. While there are economic implications for each of these metrics, the metrics themselves are technically-driven and could be used as components of a technical figure of merit that could be used to inform policy actions, such as development of resource-specific incentives and time-of-use tariff designs. Each of these metrics is demonstrated using balance-of-energy simulations that highlight the benefits of improving resource diversity.

Reiman, Andrew P.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources: Preprint

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their \textit{autonomy} and \textit{privacy} through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model is developed to engage a variety of customer types - prosumers, flexible loads, critical/noncritical customers, and distributed generators - as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining systemlevel power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup

Cold load pickup (CLPU) phenomenon is identified as the persistent power inrush upon a sudden load pickup after an outage. Under the active distribution system (ADS) paradigm, where distributed energy resources (DERs) are extensively installed, the decreased outage duration can induce a strong interdependence between CLPU pattern and load pickup decisions. In this paper, we propose a novel modelling technique to tractably capture the decision-dependent uncertainty (DDU) inherent in the CLPU process. Subsequently, a two-stage stochastic decision-dependent service restoration (SDDSR) model is constructed, where first stage searches for the optimal switching sequences to decide step-wise network topology, and the second stage optimizes the detailed generation schedule of DERs as well as the energization of switchable loads. Further, to tackle the computational burdens introduced by mixed-integer recourse, the progressive hedging algorithm (PHA) is utilized to decompose the original model into scenario-wise subproblems that can be solved in parallel. The numerical test on modified IEEE 123-node test feeders has verified the efficiency of our proposed SDDSR model and provided fresh insights into the monetary and secure values of DDU quantification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Framework for Bulk Electric Grid Impacts from HEMP E1 and E3 Effects (Tasks 3.1 Final Report)

This report presents a framework to evaluate the impact of a high-altitude electromagnetic pulse (HEMP) event on a bulk electric power grid. This report limits itself to modeling the impact of EMP E1 and E3 components. The co-simulation of E1 and E3 is presented in detail, and the focus of the paper is on the framework rather than actual results. This approach is highly conservative as E1 and E3 are not maximized with the same event characteristics and may only slightly overlap. The actual results shown in this report are based on a synthetic grid with synthetic data and a limited exemplary EMP model. The framework presented can be leveraged and used to analyze the impact of other threat scenarios, both manmade and natural disasters. This report d escribes a Monte-Carlo based methodology to probabilistically quantify the transient response of the power grid to a HEMP event. The approach uses multiple fundamental steps to characterize the system response to HEMP events, focused on the E1 and E3 components of the event. 1) Obtain component failure data related to HEMP events testing of components and creating component failure models. Use the component failure model to create component failure conditional probability density function (PDF) that is a function of the HEMP induced terminal voltage. 2) Model HEMP scenarios and calculate the E1 coupled voltage profiles seen by all system components. Model the same HEMP scenarios and calculate the transformer reactive power consumption profiles due to E3. 3) Sample each component failure PDF to determine which grid components will fail, due to the E1 voltage spike, for each scenario. 4) Perform dynamic simulations that incorporate the predicted component failures from E1 and reactive power consumption at each transformer affected by E3. These simulations allow for secondary transients to affect the relays/protection remaining in service which can lead to cascading outages. 5) Identify the locations and amount of load lost for each scenario through grid dynamic simulation. This can be an indication of the immediate grid impacts from a HEMP event. In addition, perform more detailed analysis to determine critical nodes and system trends. 6) To help realize the longer-term impacts, a security constrained alternating current optimal power flow (ACOPF) is run to maximize critical load served. This report describes a modeling framework to assess the systemic grid impacts due to a HEMP event. This stochastic simulation framework generates a large amount of data for each Monte Carlo replication, including HEMP location and characteristics, relay and component failures, E3 GIC profiles, cascading dynamics including voltage and frequency over time, and final system state. This data can then be analyzed to identify trends, e.g., unique system behavior modes or critical components whose failure is more likely to cause serious systemic effects. The proposed analysis process is demonstrated on a representative system. In order to draw realistic conclusions of the impact of a HEMP event on the grid, a significant amount of work remains with respect to modeling the impact on various grid components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyclic moisture reactivation of calcium sorbents for long duration thermochemical energy storage

The transition to a flexible and reliable energy infrastructure, using electro-thermal energy generation technologies such as geothermal, concentrated solar power, and nuclear, usually demands simultaneous advancement of thermal energy storage (TES) to support on-demand electricity generation and industrial applications while mitigating the inherent intermittency of renewable energy sources and power outages from direct energy generation. Among TES technologies, thermochemical energy storage (TCES) based on calcium looping emerges as a compelling high-power energy storage candidate due to its high reaction enthalpy, compatibility with elevated operating temperatures, and abundance of low-cost materials. However, the long-term durability of calcium-based sorbents for TCES is hindered by surface sintering and particle aggregation, leading to performance degradation over repeated thermal cycles. This study explores a moisture hydration-based strategy to regenerate a degraded calcium sorbent and mitigate performance degradation for long duration TCES. The addition of moisture transforms calcium oxide into calcium hydroxide and produces intercalation water layers, associated with a regenerated surface area and reduced calcium oxide crystallite size. Both these effects are beneficial in restoring the sorbents' reactivity for carbonization. Additionally, an optimized hydration-assisted reactivation protocol balances the recovered energy storage capacity with heating penalty required for moisture removal from hydrated samples, resulting in an enhanced energy storage capacity up to 176% compared to benchmark sorbents that undergo cycling without reactivation after 60 cycles. In conclusion, these results highlight the potential of hydration-assisted reactivation to enhance the long-term performance of TCES, providing an effective pathway to advancing electro-thermal storage technologies.

36 MATERIALS SCIENCE↗

Optimally sited microgrids for energy resilience in Mount Desert Island, ME

Mount Desert Island (MDI) (≈110 sq mi; ≈10,000 year‑round residents) is located on the eastern coast of Maine. Acadia National Park is located on the island, protecting 47,000+ acres of land which draws millions of visitors annually. The island is divided into four towns (Tremont, Southwest Harbor, Mount Desert, Bar Harbor). The island’s distribution system is supplied by a single 35‑kV mainland feeder and a mix of aging distribution components; outage exposure is not uniform across the island. Residents fear that outage events are starting to exceed resilience expectations. MDI community leaders asked Sandia National Laboratories to characterize energy system vulnerability and to develop conceptual microgrid solutions that improve community resilience while also producing co‑benefits for reliability, access, and sustainable development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive sampling for accelerating neutron diffraction-based strain mapping *

Abstract Neutron diffraction is a useful technique for mapping residual strains in dense metal objects. The technique works by placing an object in the path of a neutron beam, measuring the diffracted signals and inferring the local lattice strain values from the measurement. In order to map the strains across the entire object, the object is stepped one position at a time in the path of the neutron beam, typically in raster order, and at each position a strain value is estimated. Typical dwell times at neutron diffraction instruments result in an overall measurement that can take several hours to map an object that is several tens of centimeters in each dimension at a resolution of a few millimeters, during which the end users do not have an estimate of the global strain features and are at risk of incomplete information in case of instruments outages. In this paper, we propose an object adaptive sampling strategy to measure the significant points first. We start with a small initial uniform set of measurement points across the object to be mapped, compute the strain in those positions and use a machine learning technique to predict the next position to measure in the object. Specifically, we use a Bayesian optimization based on a Gaussian process regression method to infer the underlying strain field from a sparse set of measurements and predict the next most informative positions to measure based on estimates of the mean and variance in the strain fields estimated from the previously measured points. We demonstrate our real-time measure-infer-predict workflow on additively manufactured steel parts—demonstrating that we can get an accurate strain estimate even with 30%–40% of the typical number of measurements—leading the path to faster strain mapping with useful real-time feedback. We emphasize that the proposed method is general and can be used for fast mapping of other material properties such as phase fractions from time-consuming point-wise neutron measurements.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗