Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRA Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Assessment and Control of Spacecraft Charging Risks on the International Space Station

The International Space Station (ISS) operates in the F2 region of Earth's ionosphere, orbiting at altitudes ranging from 350 to 450 km at an inclination of 51.6 degrees. The relatively dense, cool F2 ionospheric plasma suppresses surface charging processes much of the time, and the flux of relativistic electrons is low enough to preclude deep dielectric charging processes. The most important spacecraft charging processes in the ISS orbital environment are: 1) ISS electrical power system interactions with the F2 plasma, 2) magnetic induction processes resulting from flight through the geomagnetic field and, 3) charging processes that result from interaction with auroral electrons at high latitude. Recently, the continuing review and evaluation of putative ISS charging hazards required by the ISS Program Office revealed that ISS charging could produce an electrical shock hazard to the ISS crew during extravehicular activity (EVA). ISS charging risks are being evaluated in an ongoing measurement and analysis campaign. The results of ISS charging measurements are combined with a recently developed model of ISS charging (the Plasma Interaction Model) and an exhaustive analysis of historical ionospheric variability data (ISS Ionospheric Specification) to evaluate ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA combines estimates of the frequency of occurrence and severity of the charging hazards with estimates of the reliability of various hazard controls systems, as required by NASA s safety and risk management programs, to enable design and selection of a hazard control approach that minimizes overall programmatic and personnel risk. The PRA provides a quantitative methodology for incorporating the results of the ISS charging measurement and analysis campaigns into the necessary hazard reports, EVA procedures, and ISS flight rules required for operating ISS in a safe and productive manner.

Koontz, Steve↗

Event Tree Success Branch Modeling Approaches in SAPHIRE/SPAR

Standardized Plant Analysis Risk (SPAR) models are a set of linked fault tree/event tree PRA models that have been used by the Nuclear Regulatory Commission (NRC) to evaluate the risk of operations at U.S. nuclear power plants since 1990s. The models use the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) code developed by the NRC and Idaho National Laboratory (INL). Currently Version 8, SAPHIRE is a powerful software with advanced features to perform separated or integrated Level 1, Level 2, internal events, external events, at-power, and low power shutdown PRA [1]. One of its features is the availability of three different approaches to model the success branch of a top event in event tree: delete term, complement of system logic, and developed event. However, improper choosing and modeling success branch might yield unexpected and incorrect results. This paper will discuss the two most often used success branch modeling approaches, delete term and developed event, and provide recommendations for using proper approaches in different models. A potential SAPHIRE code enhancement is also proposed to address the adverse impact brought by the developed event approach.

99 GENERAL AND MISCELLANEOUS↗

Methods for the Enhancement of Security Probabilistic Risk Assessments

The US Department of Energy is exploring the methods associated with probabilistic risk assessment (PRA) and how they could be used to enhance physical security evaluations for nuclear facilities. A brief review of both international and US Nuclear Regulatory Commission physical security assessment methods is presented. From this review, and with an understanding of the technical elements associated with a traditional nuclear safety PRA, several observations are made pertaining to where physical security analysis methods could be enhanced. These observations principally support and enhance the answers within a physical security context to the risk triplet: (1) What can go wrong? (2) What is the likelihood? and (3) What are the consequences? Finally, benefits and technical challenges toward the development of a full security PRA are presented.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

NNL.Fe.qSNAP-ZBL.2024.1: A Fe Spectral Neighbor Analysis Potential for Radiation Damage Simulations

The NNL.Fe.qSNAP-ZBL.2024.1 machine-learned potential (MLP) has been generated to support the development of an elemental body-centered cubic (BCC) Fe athermal recombination corrected neutron damage model and simulations of primary recoil atom (PRA) cascades in BCC Fe. This MLP is a quadratic spectral neighbor analysis potential (qSNAP) hybridized with the universal Ziegler-Beirsack-Littmark (ZBL) potential at short-range and is named according to Naval Nuclear Laboratory MLP naming conventions (NNL.material-system.MLP-type.year.version). Training set calculations for Fe are presented along with the subsequent MLP fitting procedure. A key criterion of the fitting procedure is that ZBL describes the short-range interaction with minimal impact on the MLP. The MLP is compared to density functional theory (DFT) predicted properties relevant to radiation damage simulation, including threshold displacement energies, for validation. The NNL.Fe.qSNAP-ZBL.2024.1 potential is considered suitable for molecular dynamics (MD) simulations of radiation defects up to 800 K and PRA cascades in BCC Fe up to around 10 keV. The potential can additionally be used on a limited basis for recoils of 10–20 keV, within which range the emergence of structures outside the training set in cascade simulations may cause system instabilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗

Exploration of High-Dimensional Scalar Function for Nuclear Reactor Safety Analysis and Visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user’s guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving dataset from a nuclear reactor safety simulation.

97 MATHEMATICS AND COMPUTING↗

Exploration of high-dimensional scalar function for nuclear reactor safety analysis and visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user's guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving data from a nuclear reactor safety simulation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Volume 1 - Overview and Summary

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE 8 can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which leads to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for managing models such as flooding and fire. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). In SAPHIRE 8, the act of creating a model has been separated from the analysis of that model in order to improve the quality of both the model (e.g., by avoiding inadvertent changes) and the analysis. Consequently, in SAPHIRE 8, the analysis of models is performed by using what are called Workspaces. Currently, there are Workspaces for three types of analyses: (1) the NRC’s Accident Sequence Precursor program, where the workspace is called “Events and Condition Assessment (ECA);” (2) the NRC’s Significance Determination Process (SDP); and (3) the General Analysis (GA) workspace. Workspaces are independent of each other and modifications or calculations made within one workspace will not affect another. In addition, each workspace has a user interface and reports tailored for their intended uses. This report provides an overview of the functions and features available in SAPHIRE 8 and presents general instructions for using the software. Since SAPHIRE 8 expands upon Version 7, new and improved features will be discussed.

99 GENERAL AND MISCELLANEOUS↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

MACCS Theory Manual

This report describes the models of the MACCS computer code as presented in MACCS Version 3.10.0. The purpose of MACCS is to simulate the impact of severe accidents at nuclear power plants on the surrounding environment. MACCS has been developed by Sandia National Laboratories for the U.S. Nuclear Regulatory Commission. From a given release of radioactive material into the atmosphere, MACCS estimates the extent and magnitude of radiological contamination, offsite doses, protective actions, socioeconomic impacts and costs, and health effects. Since the weather at the time of an accident is not predictable, MACCS supports various sampling options to run a representative set of simulations to evaluate weather variability. MACCS simulates atmospheric transport with a straight-line Gaussian plume segment model. From the estimated air and ground concentrations, MACCS models dose projections through several dose exposure pathways. These exposures can be offset by protective actions during the emergency response and long-term recovery of the accident. MACCS users directly specify the evacuation and sheltering area, while other protective actions (e.g., relocation, farmland restrictions, decontamination) are based on user-specified dose or concentration limits. While protective actions help reduce dose accumulation, they also cause social and economic impacts. MACCS models the extent of displaced individuals and land contamination, and the cost of offsite property damage, economic disruptions, and various accident expenditures caused by protective actions. Finally, from the dose accumulation, MACCS estimates early and stochastic health effects according to dose-response models. The purpose of consequence analyses is to be able to understand and estimate the impact of nuclear accidents. Consequence analysis is an essential tool to inform determinations of adequate protection of the public, to understand nuclear power hazards, to measure the value of regulations, and to help us appreciate the importance of nuclear safety. As such, MACCS has a variety of regulatory uses including environmental analyses (10 CFR 51.53, 52.47), regulatory cost-benefit analyses, backfit analyses (10 CFR 50.109), consequence analysis studies such as SOARCA (NUREG-1935), Level 3 PRA studies, and risk-informing of emergency planning (10 CFR 50 App. E and 50.47). This report updates the previous MACCS theory manual (NUREG/CR-4691 Vol. 2; Chanin, Sprung, Ritchie, & Jow, 1990) and accompanies the MACCS User's Guide (SAND-2021-1588) that describes the use and input requirements of the graphical user interface of MACCS known as WinMACCS. The MACCS User's Guide is also a reference guide that describes data input file formats, describes various software components in the MACCS code suite, and provides a set of example tutorials for running WinMACCS. Also, soon to be published is a MACCS input parameter guidance report (NUREG/CR-7270) that provides technical bases for commonly used MACCS input values. This page left blank

97 MATHEMATICS AND COMPUTING↗

Development of Probabilistic Risk Assessment Model for BWR Shutdown Modes 4 and 5 Integrated in SPAR Model

Nuclear plant operating experience and several studies show that the risk from shutdown operation during modes 4, 5, and 6 can be significant This paper describes development of the standard template risk evaluation models for shutdown modes 4, and 5 for commercial boiling water nuclear power plants (BWR). The shutdown probabilistic risk assessment model uses full power Nuclear Regulatory Commission’s (NRC’s) Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The shutdown PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from SPAR full power model with shutdown event tree logic. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheet, including the performance shaping factors (PSFs). The results are then used to estimate HEP of interest. The preliminary results indicate the risk is dominated by the operator’s ability to diagnose the events and provide long term cooling.

99 GENERAL AND MISCELLANEOUS↗

Use of limited data to construct Bayesian networks for probabilistic risk assessment.

Probabilistic Risk Assessment (PRA) is a fundamental part of safety/quality assurance for nuclear power and nuclear weapons. Traditional PRA very effectively models complex hardware system risks using binary probabilistic models. However, traditional PRA models are not flexible enough to accommodate non-binary soft-causal factors, such as digital instrumentation&control, passive components, aging, common cause failure, and human errors. Bayesian Networks offer the opportunity to incorporate these risks into the PRA framework. This report describes the results of an early career LDRD project titled %E2%80%9CUse of Limited Data to Construct Bayesian Networks for Probabilistic Risk Assessment%E2%80%9D. The goal of the work was to establish the capability to develop Bayesian Networks from sparse data, and to demonstrate this capability by producing a data-informed Bayesian Network for use in Human Reliability Analysis (HRA) as part of nuclear power plant Probabilistic Risk Assessment (PRA). This report summarizes the research goal and major products of the research.

Groth, Katrina M.↗

A computational risk assessment approach to the integration of seismic and flooding hazards with internal hazards

Probabilistic risk assessment (PRA) of nuclear power plants historically focuses on internal events at the plant, rather than external hazards. Although the importance of external hazards risk analysis is now well recognized, the methods for assessing the risk associated with low probability external hazards rely heavily on subjective judgment of specialists, often using conservative elements in the analysis, as is the case with the Conservative Deterministic Failure Margin approach commonly used for seismic PRA. The U.S. Department of Energy Light Water Reactor Sustainability program has been investigating the use of first principles analyses to provide a more realistic assessment of the risk of external hazards, in a process called computational risk assessment (CRA). Efforts undertaken are described in the development of CRA methods to integrate the risk associated with seismic and flooding events into traditional PRA. Further, the results of four case studies are presented.

99 GENERAL AND MISCELLANEOUS↗

Science-Based Simulation Model of Human Performance for Human Reliability Analysis

Human reliability analysis (HRA), a component of an integrated probabilistic risk assessment (PRA), is the means by which the human contribution to risk is assessed, both qualitatively and quantitatively. However, among the literally dozens of HRA methods that have been developed, most cannot fully model and quantify the types of errors that occurred at Three Mile Island. Furthermore, all of the methods lack a solid empirical basis, relying heavily on expert judgment or empirical results derived in non-reactor domains. Finally, all of the methods are essentially static, and are thus unable to capture the dynamics of an accident in progress. The objective of this work is to begin exploring a dynamic simulation approach to HRA, one whose models have a basis in psychological theories of human performance, and whose quantitative estimates have an empirical basis. This paper highlights a plan to formalize collaboration among the Idaho National Laboratory (INL), the University of Maryland, and The Ohio State University (OSU) to continue development of a simulation model initially formulated at the University of Maryland. Initial work will focus on enhancing the underlying human performance models with the most recent psychological research, and on planning follow-on studies to establish an empirical basis for the model, based on simulator experiments to be carried out at the INL and at the OSU.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗

RAVEN regression tests' description

Regression tests for the Python RAVEN framework are found in raven/tests/framework. There is a hierarchy of folders with tests collected by similar testing. Every test is described in a special XML node (< TestInfo >) within the < Simulation > block.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗