Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRELAUNCH TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

STS-105 Countdown Status Briefing

Bruce Buckingham, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, and Glenn Chin, STS-105 Mission Manager, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

Tracking and data system support for the Pioneer project. Volume 2: Pioneer 11 prelaunch planning through second trajectory correction, to 1 May 1973

The tracking and data system support of the planning, testing, launch, near-earth, and deep space phases of the Pioneer 11 Jupiter Mission are described, including critical phases of spacecraft flight and guidance. Scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields. Knowledge of the celestial mechanics of the solar system was improved through radiometric data gathering. Network performance, details of network support activity, and special support activities are discussed.

Barton, W. R.↗

Testing the Shuttle heat-protection armor

The article deals with the thermal protection system (TPS) designed to keep Space Shuttle structures at 350 F ratings over a wide range of temperatures encountered in orbit, but also during prelaunch, launch, deorbit and re-entry, landing and turnaround. The structure, function, fabrication, and bonding of various types of reusable surface insulation and composite materials are described. Test programs are developed for insulation, seals, and adhesion bonds; leak tests and acoustic fatigue tests are mentioned. Test facilities include arc jets, radiant heaters, furnaces, and heated tunnels. The certification tests to demonstrate TPS reusability, structural integrity, thermal performance, and endurance will include full-scale assembly tests and initial orbital flight tests.

Strouhal, G.↗

Adiabatic charging of nickel-hydrogen batteries

Battery management during prelaunch activities has always required special attention and careful planning. The transition from nickel-cadium to nickel-hydrogen batteries, with their high self discharge rate and lower charge efficiency, as well as longer prelaunch scenarios, has made this aspect of spacecraft battery management even more challenging. The AXAF-I Program requires high battery state of charge at launch. The use of active cooling, to ensure efficient charging, was considered and proved to be difficult and expensive. Alternative approaches were evaluated. Optimized charging, in the absence of cooling, appeared promising and was investigated. Initial testing was conducted to demonstrate the feasibility of the 'Adiabatic Charging' approach. Feasibility was demonstrated and additional testing performed to provide a quantitative, parametric data base. The assumption that the battery is in an adiabatic environment during prelaunch charging is a conservative approximation because the battery will transfer some heat to its surroundings by convective air cooling. The amount is small compared to the heat dissipated during battery overcharge. Because the battery has a large thermal mass, substantial overcharge can occur before the cells get too hot to charge efficiently. The testing presented here simulates a true adiabatic environment. Accordingly the data base may be slightly conservative. The adiabatic charge methodology used in this investigation begins with stabilizing the cell at a given starting temperature. The cell is then fully insulated on all sides. Battery temperature is carefully monitored and the charge terminated when the cell temperature reaches 85 F. Charging has been evaluated with starting temperatures from 55 to 75 F.

Lurie, Chuck↗

Telecommunications and data acquisition systems support for Voyager missions to Jupiter and Saturn, 1972-1981, prelaunch through Saturn encounter

The Deep Space Network has supported the Voyager Project for approximately nine years, during which time implementation, testing, and operational support was provided. Four years of this time involved testing prior to launch; the final five years included network operations support and additional network implementation. Intensive and critical support intervals included launch and four planetary encounters. The telecommunications and data acquisition support for the Voyager Missions to Jupiter and Saturn are summarized.

Traxler, M. R.↗

Online assessment of a distributed processor

ORT (Operational Readiness Test) software allows one engineer to test readiness of 64 minicomputers and their peripherals from single console. Software makes roll call of computers and peripherals via common data buffer to check readiness of system in morning "wake up" or at other important times. Subsystems are tested in parallel to save time. "Watchdog" terminates test of any system that does not respond in time, so one failed system does not halt test sequence. Entire rollcall is complete in about 15 minutes. Software is designed for Space Shuttle prelaunch checkout, but approach should interest users of similar equipment.

Ehrlich, L. F.↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

Initial On-Orbit Spectral Calibration of the PACE Ocean Color Instrument

The NASA Plankton, Aerosol, Cloud, and ocean Ecosystem (PACE) mission Project Science Team has used Ocean Color Instrument (OCI) measurements of Fraunhofer lines in spectra of sunlight reflected by the solar diffuser and measurements of atmospheric absorption bands in cloudtop and ocean spectra to characterize the spectral calibration of OCI on orbit. Multiple lines have been analyzed for both the ultraviolet to visible (UVVIS, 340−607 nm) and visible to near-infrared (VISNIR, 597−897 nm) grating spectrographs. The spectrographs yield hyperspectral observations with 5 nm bandwidths and 0.625 nm sampling intervals. The on-orbit observations have been compared with the prelaunch spectral calibration of OCI performed by the Goddard Laser for Absolute Measurement of Radiance (GLAMR) during thermal vacuum testing to track any changes in the calibration since launch. The calibration analyzed the line positions and strengths for the Fraunhofer lines for each spectrograph by comparing the solar spectra measured by OCI with predicted solar spectra derived from the solar reference spectrum and the BRDF of the solar diffuser, convolved with the OCI relative spectral responses. The calibration also compared the line positions of the atmospheric absorption bands with the model transmissions used by the PACE Project. The line position comparisons show that the root mean square (RMS) spectral difference between the measured and predicted spectra is 0.15 nm, the average spectral shift is 0.062 nm, and the residual spectral dispersion over the wavelength range of the Fraunhofer lines is 0.17 nm. All three estimates of the spectral accuracy of OCI meet the instrument functional requirement of a spectral accuracy of 0.5 nm and are well within the 0.625 nm sampling interval of the data. The line strength comparisons between measured and predicted spectra are essentially the same. These results show that the spectral calibration of OCI on orbit has not drifted since the prelaunch calibration of OCI by GLAMR and that the on-orbit spectral calibration of OCI is stable over time. These results also provide a baseline for monitoring the future spectral performance of OCI on orbit.

Radiometric Calibration↗

STS-105 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Glenn Chin, STS-105 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status (Leonardo Multipurpose Logistics Module), and weather forecast. The men then answer questions from the press.

Source record↗

Ventilation Loss in the NASA Space Shuttle Crew Protective Garments: Potential for Heat Stress

The potential of the National Aeronautics and Space Administration (NASA) S1035 Launch/Entry suit (LES) for producing heat stress in a simulated Space Shuttle cabin environment has been studied. The testing was designed to determine if the NASA S1035 poses a greater threat of inducing heat stress than the NASA S1032. Conditions were designed to simulate an extreme prelaunch situation, with chamber temperatures maintained at dry bulb temperature 27.2 +/- 0.1 C, globe temperature - 27.3 +/- 0.1 C, and wet bulb temperature 21.1 +/- 0.3 C. Four males, aged 28-48, were employed in this study, with three subjects having exposures in all four conditions and the fourth subject exposed to 3 conditions. Test durations in the ventilated (V) and unventilated (UV) conditions were designed for 480 minutes, which all subjects achieved. No significant differences related to experimental conditions were noted in rectal temperatures, heart rates or sweat rates. The results indicate that the S1032 and S1035 garments, in either the V or UV state, poses no danger of inducing unacceptable heat stress under the conditions expected within the Shuttle cabin during launch or re-entry.

Askew, Gregory K.↗

STS-104 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Gregory Horvath, STS-104 Mission Integration Engineer, and Ed Priselac, Shuttle Weather Officer, in this STS-104 prelaunch press conference. An overview is given of the launch countdown, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

Calibration Plan for the Ocean Color Instrument (OCI) Engineering Test Unit

The basic product measured by OCI is the top-of atmosphere (TOA) radiance at different wavelengthsThree types of calibration/characterization are necessary for ocean color processing: - Prelaunch calibration/characterization (absolute/spectral calibration and image artifacts) - On-orbit calibration (solar diffuser and lunar measurements) - Vicarious calibration (in-situ measurements of water-leaving radiance)

Meister, Gerhard↗

Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

Barbre', Robert E., Jr.↗

Using AVIRIS for in-flight calibration of the spectral shifts of SPOT-HRV and of AVHRR?

The response of a satellite sensor varies during its lifetime; internal calibration devices can be used to follow the sensor degradation or in-flight calibrations are conducted from estimates of the radiance at satellite level for well predictable situations. Changes in gain are evaluated assuming that the spectral response of the sensor is stable with time; i.e., that the filter response as well as the optics or the electronics are not modified since the prelaunch determinations. Nevertheless, there is some evidence that the SPOT interferometer filters are affected by outgassing effects during the launch. Tests in vacuum chambers indicated a narrowing of the filters with a shift of the upper side towards the blue of about 10 nm which is more over consistant with the loss of gain observed during the launch. Also, during the lifetime of SPOT, the relationship between the loss of sensitivity and the filter bandwidth may correspond to this effect. On the other hand, the inconsistancy of the NOAA7 calibration between two methods (desert and ocean) having a different spectral sensitivity may indicate a spectral problem with a shift of the central wavelength of -20 nm. The basic idea here is to take advantage of the good spectral definition of AVIRIS to monitor these potential spectral degradations with an experimental opportunity provided by a field campaign held in La Crau (S.E. of France) in June 1991 which associated ground-based measurements and AVIRIS, SPOT2, NOAA-11 overpasses over both the calibration site of La Crau and an agricultural area.

Willart-Soufflet, Veronique↗

STS-72 Mission Highlights Resource Tape

The flight crew of the STS-72 Space Shuttle Orbiter Endeavour Cmdr. Brian Duffy, Pilot Brent W. Jett, and Mission Specialists; Leroy Chiao, Daniel T. Barry, Winston E. Scott, and Koichi Wakata (NASDA) present an overview of their mission, whose primary objective is the retrieval of two research satellites. The major activities of the mission will include retrieval of the Japanese Space Flyer Unit (SFU), which was launched aboard a Japanese H-2 rocket to conduct a variety of microgravity experiments. In addition, the STS-72 crew will deploy the AST-Flyer, a satellite, that will fly free of the Shuttle for about 50 hours. Four experiments on the science platform will operate autonomously before the satellite is retrieved by Endeavour's robot arm. Three of Endeavour's astronauts will conduct a pair of spacewalks during the mission to test hardware and tools that will be used in the assembly of the Space Station. Video footage includes the following: prelaunch and launch activities; the crew eating breakfast; shuttle launch; retrieval of the Japanese Space Flyer Unit (SFU); suit-up and EVA-1; EVA-2; crew members performing various physical exercises; various earth views; and the night landing of the shuttle at KSC.

Source record↗

Development and Testing of a Drogue Parachute System for X-37 ALTV/B-52H Separation

Multiple scenarios were identified in which the X-37 approach and landing test vehicle (ALTV) catastrophically recontacts the B-52H carrier aircraft after separation. The most cost-effective recontact risk mitigation is the prelaunch deployment of a drogue parachute that is released after the X-37 ALTV has safely cleared the B-52H. After release, a fully-inflated drogue parachute takes 30 min to reach ground and results in a large footprint that excessively restricts the days available for flight. To reduce the footprint, a passive collapse mechanism consisting of an elastic reefing line attached to the parachute skirt was developed. At flight loads the elastic is stretched, allowing full parachute inflation. After release, drag loads drop dramatically and the elastic line contracts, reducing the frontal drag area. A 50 percent drag reduction results in an approximately 75 percent ground footprint reduction. Eleven individual parachute designs were evaluated at flight load dynamic pressures in the High Velocity Airflow System (HIVAS) at the Naval Air Warfare Center (NAWC), China Lake, California. Various options for the elastic reefing system were also evaluated at HIVAS. Two best parachute designs were selected from HIVAS to be carried forward to flight test. Detailed HIVAS test results are presented in this report.

Whitmore, Stephen A.↗

Development and Testing of a Drogue Parachute System for X-37 ALTV/B-52H Separation

Multiple scenarios were identified in which the X-37 approach and landing test vehicle (ALTV) catastrophically recontacts the B-52H carrier aircraft after separation. The most cost-effective recontact risk mitigation is the prelaunch deployment of a drogue parachute that is released after the X-37 ALTV has safely cleared the B-52H. After release, a fully-inflated drogue parachute takes 30 min to reach ground and results in a large footprint that excessively restricts the days available for flight. To reduce the footprint, a passive collapse mechanism consisting of an elastic reefing line attached to the parachute skirt was developed. At flight loads the elastic is stretched, allowing full parachute inflation. After release, drag loads drop dramatically and the elastic line contracts, reducing the frontal drag area. A 50-percent drag reduction results in an approximately 75-percent ground footprint reduction. Eleven individual parachute designs were evaluated at flight load dynamic pressures in the High Velocity Airflow System (HIVAS) at the Naval Air Warfare Center (NAWC), China Lake, California. Various options for the elastic reefing system were also evaluated at HIVAS. Two best parachute designs were selected from HIVAS to be carried forward to flight test. Detailed HIVAS test results are presented in this report.

Whitmore, Stephen A.↗