Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗

Simulation test beds for the space station electrical power system

NASA Lewis Research Center and its prime contractor are responsible for developing the electrical power system on the space station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

Sadler, Gerald G.↗

Simulation test beds for the Space Station electrical power system

NASA Lewis Research Center and its prime contractor are respnsible for developing the electrical power system on the Space Station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

Sadler, Gerald G.↗

Spacecraft Software Maintenance: An Effective Approach to Reducing Costs and Increasing Science Return

Flight software is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are typically dealing almost entirely with the capabilities of onboard software. This software, even more than critical ground/flight communications systems, is expected to perform perfectly during all phases of spacecraft life. Due to the fact that it can be reprogrammed on-orbit to accommodate degradations or failures in flight hardware, new insights into spacecraft characteristics, new control options which permit enhanced science options, etc., the on- orbit flight software maintenance team is usually significantly responsible for the long term success of a science mission. Failure of flight software to perform as needed can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to maintaining spacecraft software--namely using the original developers, using the mission operations personnel, or assembling a center of excellence for multi-spacecraft software maintenance. Not planning properly for flight software maintenance can lead to unnecessarily high on-orbit costs and/or unacceptably long delays, or errors, in patch installations. A common approach for flight software maintenance is to access the original development staff. The argument for utilizing the development staff is that the people who developed the software will be the best people to modify the software on-orbit. However, it can quickly becomes a challenge to obtain the services of these key people. They may no longer be available to the organization. They may have a more urgent job to perform, quite likely on another project under different project management. If they havn't worked on the software for a long time, they may need precious time for refamiliarization to the software, testbeds and tools. Further, a lack of insight into issues related to flight software in its on-orbit environment, may find the developer unprepared for the challenges. The second approach is to train a member of the flight operations team to maintain the spacecraft software. This can prove to be a costly and inflexible solution. The person assigned to this duty may not have enough work to do during a problem free period and may have too much to do when a problem arises. If the person is a talented software engineer, he/she may not enjoy the limited software opportunities available in this position; and may eventually leave for newer technology computer science opportunities. Training replacement flight software personnel can be a difficult and lengthy process. The third approach is to assemble a center of excellence for on-orbit spacecraft software maintenance. Personnel in this specialty center can be managed to support flight software of multiple missions at once. The variety of challenges among a set of on-orbit missions, can result in a dedicated, talented staff which is fully trained and available to support each mission's needs. Such staff are not software developers but are rather spacecraft software systems engineers. The cost to any one mission is extremely low because the software staff works and charges, minimally on missions with no current operations issues; and their professional insight into on-orbit software troubleshooting and maintenance methods ensures low risk, effective and minimal-cost solutions to on-orbit issues.

Shell, Elaine M.↗

AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

Hanley, Lionel↗

Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

Hornstein, Rhoda S.↗

Java RMI Software Technology for the Payload Planning System of the International Space Station

The Payload Planning System is for experiment planning on the International Space Station. The planning process has a number of different aspects which need to be stored in a database which is then used to generate reports on the planning process in a variety of formats. This process is currently structured as a 3-tier client/server software architecture comprised of a Java applet at the front end, a Java server in the middle, and an Oracle database in the third tier. This system presently uses CGI, the Common Gateway Interface, to communicate between the user-interface and server tiers and Active Data Objects (ADO) to communicate between the server and database tiers. This project investigated other methods and tools for performing the communications between the three tiers of the current system so that both the system performance and software development time could be improved. We specifically found that for the hardware and software platforms that PPS is required to run on, the best solution is to use Java Remote Method Invocation (RMI) for communication between the client and server and SQLJ (Structured Query Language for Java) for server interaction with the database. Prototype implementations showed that RMI combined with SQLJ significantly improved performance and also greatly facilitated construction of the communication software.

Bryant, Barrett R.↗

Integrated Planning and Scheduling for NASA’s Deep Space Network – from Forecasting to Real-time

Over a period of several years, the software systems that plan and schedule the use of NASA’s Deep Space Network (DSN) for the projects it serves have been upgraded from a disparate set of decades-old software components, to an integrated suite covering long-range planning and forecasting, all the way to real-time scheduling. The most recent component of this suite is known as LAPS, for Loading Analysis and Planning Software, and is responsible for long-term planning and forecasting, including studies and analysis of new missions, changed mission requirements, downtime, and new or changed antenna capabilities. This paper discusses the architecture of LAPS and its interfaces with other elements of DSN planning and scheduling, its user interfaces, and some lessons learned from development and deployment.

Lad, Jigna↗

The Environmental Control and Life Support System (ECLSS) advanced automation project

The objective of the environmental control and life support system (ECLSS) Advanced Automation Project is to influence the design of the initial and evolutionary Space Station Freedom Program (SSFP) ECLSS toward a man-made closed environment in which minimal flight and ground manpower is needed. Another objective includes capturing ECLSS design and development knowledge future missions. Our approach has been to (1) analyze the SSFP ECLSS, (2) envision as our goal a fully automated evolutionary environmental control system - an augmentation of the baseline, and (3) document the advanced software systems, hooks, and scars which will be necessary to achieve this goal. From this analysis, prototype software is being developed, and will be tested using air and water recovery simulations and hardware subsystems. In addition, the advanced software is being designed, developed, and tested using automation software management plan and lifecycle tools. Automated knowledge acquisition, engineering, verification and testing tools are being used to develop the software. In this way, we can capture ECLSS development knowledge for future use develop more robust and complex software, provide feedback to the knowledge based system tool community, and ensure proper visibility of our efforts.

Dewberry, Brandon S.↗

Sensor Webs: Autonomous Rapid Response to Monitor Transient Science Events

To better understand how physical phenomena, such as volcanic eruptions, evolve over time, multiple sensor observations over the duration of the event are required. Using sensor web approaches that integrate original detections by in-situ sensors and global-coverage, lower-resolution, on-orbit assets with automated rapid response observations from high resolution sensors, more observations of significant events can be made with increased temporal, spatial, and spectral resolution. This paper describes experiments using Earth Observing 1 (EO-1) along with other space and ground assets to implement progressive mission autonomy to identify, locate and image with high resolution instruments phenomena such as wildfires, volcanoes, floods and ice breakup. The software that plans, schedules and controls the various satellite assets are used to form ad hoc constellations which enable collaborative autonomous image collections triggered by transient phenomena. This software is both flight and ground based and works in concert to run all of the required assets cohesively and includes software that is model-based, artificial intelligence software.

Mandl, Dan↗

Software Formal Inspections Standard

The purpose of this Standard is to define the requirements for a software inspection process aimed at detecting and eliminating defects as early as possible in the software life cycle. This process can be used for any documented product; however, this Standard focuses on its use for software products - i.e., software code, plans, manuals, etc. The process provides for the collection and analysis of inspection data to improve the inspection process as well as the quality of the software.

Wetherholt, Martha S.↗

Project Report: Automatic Sequence Processor Software Analysis

The Mission Planning and Sequencing (MPS) element of Multi-Mission Ground System and Services (MGSS) provides space missions with multi-purpose software to plan spacecraft activities, sequence spacecraft commands, and then integrate these products and execute them on spacecraft. Jet Propulsion Laboratory (JPL) is currently is flying many missions. The processes for building, integrating, and testing the multi-mission uplink software need to be improved to meet the needs of the missions and the operations teams that command the spacecraft. The Multi-Mission Sequencing Team is responsible for collecting and processing the observations, experiments and engineering activities that are to be performed on a selected spacecraft. The collection of these activities is called a sequence and ultimately a sequence becomes a sequence of spacecraft commands. The operations teams check the sequence to make sure that no constraints are violated. The workflow process involves sending a program start command, which activates the Automatic Sequence Processor (ASP). The ASP is currently a file-based system that is comprised of scripts written in perl, c-shell and awk. Once this start process is complete, the system checks for errors and aborts if there are any; otherwise the system converts the commands to binary, and then sends the resultant information to be radiated to the spacecraft.

sequencing↗

Blackbird: Object-Oriented Planning, Simulation, and Sequencing Framework Used by Multiple Missions

Every JPL flight mission relies on activity planning and sequence generation software to perform operations. Most such tools in use at JPL and elsewhere use attribute-based schemas or domain-specific languages (DSLs) to define activities. This reliance poses user training, software maintenance, performance, and other challenges. To solve this problem for future missions, a new software called Blackbird was developed which allows engineers to specify behavior in standard Java. The new code base has over an order of magnitude fewer lines of code than other JPL planning software, since no DSL or schema interpreter is needed. The use of Java for defining activities also allows mission adapters to debug their code in an integrated development environment, seamlessly call external libraries, and set up truly multimission models. These efficiency gains have significantly reduced the amount of development effort required to support the software. This paper discusses Blackbird’s design, principles, and use cases.

Lawler, Christopher↗

Microstructure Modeling of 3rd Generation Disk Alloys

The objective of this program is to model, validate, and predict the precipitation microstructure evolution, using PrecipiCalc (QuesTek Innovations LLC) software, for 3rd generation Ni-based gas turbine disc superalloys during processing and service, with a set of logical and consistent experiments and characterizations. Furthermore, within this program, the originally research-oriented microstructure simulation tool will be further improved and implemented to be a useful and user-friendly engineering tool. In this report, the key accomplishment achieved during the second year (2008) of the program is summarized. The activities of this year include final selection of multicomponent thermodynamics and mobility databases, precipitate surface energy determination from nucleation experiment, multiscale comparison of predicted versus measured intragrain precipitation microstructure in quench samples showing good agreement, isothermal coarsening experiment and interaction of grain boundary and intergrain precipitates, primary microstructure of subsolvus treatment, and finally the software implementation plan for the third year of the project. In the following year, the calibrated models and simulation tools will be validated against an independently developed experimental data set, with actual disc heat treatment process conditions. Furthermore, software integration and implementation will be developed to provide material engineers valuable information in order to optimize the processing of the 3rd generation gas turbine disc alloys.

Jou, Herng-Jeng↗

Introduction to ISS Crew Displays

The International Space Station (ISS) began payload operations in earnest in 2000 with the arrival of the Expedition 1. To date, ISS has offered Principal Investigators (PIs) a reliable platform for microgravity research, having hosted thousands of onboard science experiments. Most of this research is supported by experiment hardware and software and many include a crew‐operated Graphical User Interface (GUI). The purpose of this article is to share information with PIs and Payload Developer (PD) teams about the processes, standards, and guidelines applicable to crew GUI design that must be complied with when planning payload software. The goal is not to enumerate all of the ISS display standards, but rather to highlight design guidelines and the ISS Program milestones for verification and approval of onboard crew displays.

Graphical User Interface↗