Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Beaming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Alfven eigenmodes and fast ion transport in negative triangularity DIII-D plasmas

The first energetic particle experiments in negative triangularity tokamak plasmas have been carried out on DIII-D. Alfvén eigenmode (AE) activity and associated fast ion transport comparable to that in positive triangularity is observed during the current ramp portion of all plasmas with early beam heating indicating negative triangularity does not confer a special advantage with respect to AE induced transport. In these discharges, a range of mode activity driven by the sub-Alfvénic (Vbeam/VA < 0.5) 80 kV neutral beams is found including beta induced Alfvén acoustic eigenmodes, beta induced Alfvén eigenmodes, reversed shear Alfvén eigenmodes (RSAEs) and toroidicity induced Alfvén eigenmodes (TAEs). Mode intermittency and possibly chirping appears to be more common than comparable positive triangularity and/or oval discharges but overall, the unstable spectra and mode amplitudes observed on magnetics, CO2 interferometry, and electron cyclotron emission in a set of matched positive and negative triangularity cases at moderate beam power is similar. Large levels of Alfvén eigenmode induced fast ion transport are found in both positive and negative triangularity with up to 70% central fast ion pressure deficits relative to classical predictions early during the current ramp phase for discharges with 3 MW injected 80 kV neutral beam power. The deficit in both cases is reduced toward zero as the current penetrates and eventually reaches classical levels during current flattop with qmin ≈ 1. Fast ion transport in negative triangularity plasmas measured using a beam modulation technique show very similar levels to those measured in oval plasmas over the range of tested beam powers (Pbeam ≈ 2–7 MW). This similarity is found despite quite different unstable spectra in the highest beam power case where a mixture of coherent and quasi-coherent modes in the TAE frequency range are observed in negative triangularity and a spectrum of more typical narrowband TAEs and RSAEs is observed for the oval plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Observation of New Isotopes in the Fragmentation of Pt 198 at FRIB

Five previously unknown isotopes ( 182,183 Tm, 186,187 Yb, 190 Lu) were produced, separated, and identified for the first time at the Facility for Rare Isotope Beams (FRIB) using the Advanced Rare Isotope Separator (ARIS). The new isotopes were formed through the interaction of a 198 Pt beam with a carbon target at an energy of 186 MeV/u and with a primary beam power of 1.5 kW. Event-by-event particle identification of A, Z, and q for the reaction products was performed by combining measurements of the energy loss, time of flight, magnetic rigidity Bρ, and total kinetic energy. The ARIS separator has a novel two-stage design with high resolving power to strongly suppress contaminant beams. Finally, this successful new isotope search was performed less than one year after FRIB operations began and demonstrates the discovery potential of the facility which will ultimately provide 400 kW of primary beam power.

07 ISOTOPE AND RADIATION SOURCES↗

Advanced Design for the WIQ Magnet With Steering Corrector Function

The Facility for Rare Isotopes Beams (FRIB) delivers heavy-ion primary beams at energies of up to 300 MeV/u at 10 kW of beam power to generate rare isotope beams for experiments and will eventually operate at beam power of 400 kW. The preseprator of the Advanced Rare Isotope Separator (ARIS) is equipped with six warm-iron quadrupole (WIQ) singlets and two dipoles integrated right after the production target. They have a compact structure and operate in a high radiation vacuum environment within a hot cell having remote handling capabilities for installation and maintenance. Due to asymmetry with respect to the quadrupole poles, nested sextupole excitations in WIQs induce vertical dipoles that offset the centroid trajectory; Magnet misalignments also result in trajectory offsets. Such offsets degrade separator performance but can be minimized by changing the current distribution on sextupole and octupole coils. In this work, we show how modifications to the WIQ coil design can allow superimposed dipole fields to be included to the octupole and sextupole windings, as well as addition of dipole components by splitting coil currents over groups with separator power supplies. Adjusting the group currents can cancel the sextupole-induced vertical dipole component which can be as high as 0.012 Tm. Octupole coil changes may superimpose a horizontal dipole integrated strength as high as 0.0332 Tm. Unwanted higher harmonics induced as a side effect of the new design are kept to a minimum such that separator performance is preserved as much as possible.

Accelerator magnets↗

Monte Carlo simulation analysis for radiation damage on Glidcop Al-15 caused by 17-20 MeV/u heavy ions

The Facility for Rare Isotope Beams (FRIB) SRF linear heavy-ion accelerator is designed to accelerate all ions up to uranium to a maximum beam power of 400 kW. Several beam intercepting devices (BIDs) are essential to the successful operation of the accelerator, including a low power charge selector (LPCS) made of copper containing 0.15% precipitated aluminum oxide by weight called Glidcop Al-15. As FRIB ramps up the primary beam power beyond the current 20 kW level, the charge selector must withstand higher radiation damage rates, typically measured in displacements per atom (dpa). Significant beam induced radiation damage including significant deformation, like swelling, blistering, and cracking has been observed on a recently removed LPCS. We also observed physical features up to about 5.5 mm wide and appear to be deeper than the projected range of any ions. This paper presents the results of Monte Carlo simulations carried out using the Particle and Heavy Ion Transport code System (PHITS), quantifying the total damage dose and ion concentration, etc. Simulating an accurate irradiation history is essential to determining the scope of post irradiation examination (PIE) work.

Fletcher, Ethan [Michigan State U.]↗

Reliable Power for Remote Applications

Optical power beaming has the potential to fundamentally change how remote devices receive power, leading to technological innovation across many sectors. NREL is interested in teaming with partners to engineer field-ready (and space-ready) solutions for long-range power beaming and adapt new ideas to important applications.

14 SOLAR ENERGY↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗

Performance Characteristics of the NEXT Long-Duration Test After 16,550 h and 337 kg of Xenon Processed

The NASA s Evolutionary Xenon Thruster (NEXT) program is developing the next-generation ion propulsion system with significant enhancements beyond the state-of-the-art in ion propulsion to provide future NASA science missions with enhanced mission capabilities at a low total development cost. As part of a comprehensive thruster service life assessment utilizing both testing and analyses, a Long-Duration Test (LDT) was initiated to verify the NEXT propellant throughput capability to a qualification-level of 450 kg, 1.5 times the anticipated throughput requirement of 300 kg from mission analyses conducted utilizing the NEXT propulsion system. The LDT is being conducted with a modified, flight-representative NEXT engineering model ion thruster, designated EM3. As of June 25, 2008, the thruster has accumulated 16,550 h of operation: the first 13,042 h at the thruster full-input-power of 6.9 kW with 3.52 A beam current and 1800 V beam power supply voltage. Operation since 13,042 h, i.e., the most recent 3,508 h, has been at an input power of 4.7 kW with 3.52 A beam current and 1180 V beam power supply voltage. The thruster has processed 337 kg of xenon (Xe) surpassing the NSTAR propellant throughput demonstrated during the extended life testing of the Deep Space 1 flight spare ion thruster. The NEXT LDT has demonstrated a total impulse of 13.3 106 N s; the highest total impulse ever demonstrated by an ion thruster. Thruster performance tests are conducted periodically over the entire NEXT throttle table with input power ranging 0.5 to 6.9 kW. Thruster performance parameters including thrust, input power, specific impulse, and thruster efficiency have been nominal with little variation to date. This paper presents the performance of the NEXT LDT to date with emphasis on performance variations following throttling of the thruster to the new operating condition and comparison of performance to the NSTAR extended life test.

Soulas, George C.↗

NEXT Long-Duration Test Plume and Wear Characteristics after 16,550 h of Operation and 337 kg of Xenon Processed

The NASA s Evolutionary Xenon Thruster (NEXT) program is developing the next-generation ion propulsion system with significant enhancements beyond the state-of-the-art. The NEXT ion propulsion system provides improved mission capabilities for future NASA science missions to enhance and enable Discovery, New Frontiers, and Flagship-type NASA missions. As part of a comprehensive thruster service life assessment utilizing both testing and analyses, a Long-Duration Test (LDT) was initiated to validate and qualify the NEXT propellant throughput capability to a qualification-level of 450 kg, 1.5 times the mission-derived throughput requirement of 300 kg. This wear test is being conducted with a modified, flight-representative NEXT engineering model ion thruster, designated EM3. As of June 25, 2008, the thruster has accumulated 16,550 h of operation: the first 13,042 h at the thruster full-input-power of 6.9 kW with 3.52 A beam current and 1800 V beam power supply voltage. Operation since 13,042 h, i.e., the most recent 3,508 h, has been at an input power of 4.7 kW with 3.52 A beam current and 1180 V beam power supply voltage. The thruster has processed 337 kg of xenon (Xe) surpassing the NSTAR propellant throughput demonstrated during the extended life testing of the Deep Space 1 flight spare. The NEXT LDT has demonstrated a total impulse of 13.3 106 N s; the highest total impulse ever demonstrated by an ion thruster. Thruster plume diagnostics and erosion measurements are obtained periodically over the entire NEXT throttle table with input power ranging 0.5 to 6.9 kW. Observed thruster component erosion rates are consistent with predictions and the thruster service life assessment. There have not been any observed anomalous erosion and all erosion estimates indicate a thruster throughput capability that exceeds ~750 kg of Xe, an equivalent of 36,500 h of continuous operation at the full-power operating condition. This paper presents the erosion measurements and plume diagnostic results for the NEXT LDT to date with emphasis on the change in thruster operating condition and resulting impact on wear characteristics. Ion optics grid-gap data, both cold and operating, are presented. Performance and wear predictions for the LDT throttle profile are presented.

Herman, Daniel A.↗

Estimating the vibration level of an L-shaped beam using power flow techniques

The response of one component of an L-shaped beam, with point force excitation on the other component, is estimated using the power flow method. The transmitted power from the source component to the receiver component is expressed in terms of the transfer and input mobilities at the excitation point and the joint. The response is estimated both in narrow frequency bands, using the exact geometry of the beams, and as a frequency averaged response using infinite beam models. The results using this power flow technique are compared to the results obtained using finite element analysis (FEA) of the L-shaped beam for the low frequency response and to results obtained using statistical energy analysis (SEA) for the high frequencies. The agreement between the FEA results and the power flow method results at low frequencies is very good. SEA results are in terms of frequency averaged levels and these are in perfect agreement with the results obtained using the infinite beam models in the power flow method. The narrow frequency band results from the power flow method also converge to the SEA results at high frequencies. The advantage of the power flow method is that detail of the response can be retained while reducing computation time, which will allow the narrow frequency band analysis of the response to be extended to higher frequencies.

Cuschieri, J. M.↗

Characteristics of a high-power ion beam deflection system necessary to deflect the hypothetical asteroid 2017 PD

The July 2027 impact date for the hypothetical asteroid 2017 PDC, that is the subject of an emergency response exercise, leaves just over ten years to implement a deflection approach. The analyses herein allocates four years to the design, fabrication, assembly, test and launch of a notional high-power Ion Beam Deflection (IBD) vehicle to meet a launch readiness date no later than May 2021. Using this launch date along with estimates for the vehicle mass and performance characteristics of the electric propulsion system, low-thrust trajectory analyses indicate a 2.56-year flight time to rendezvous with 2017 PDC. This would leave 3.6 years to execute the actual deflection phase. A 160-kW IBD vehicle could deflect 2017 PDC by at least one Earth radius within this time provided the asteroid’s actual diameter was less than about 140 m and its density was 2 g/cm3 or less. Larger diameters and/or higher densities would require a higher power IBD vehicle, multiple IBD vehicles, or a longer deflection phase. Ion beam deflection is largely independent of the characteristics of the threat object, but its effectiveness, like all deflection approaches, is sensitive to both the asteroid mass and the time available for deflection. The characteristics of IBD, i.e., large standoff distance between the spacecraft and the asteroid surface, as well as ion beam divergence angles of a few degrees, facilitates the possible simultaneous use of multiple IBD vehicles to improve the performance and robustness of the asteroid deflection. The 65-cm diameter, 20-kW NEXIS ion thruster developed in support of the Jupiter Icy Moons Orbiter mission concept is particularly well suited for application to a high-power IBD system. It has demonstrated an ion beam divergence angle of approximately 2 degrees and operation at 20 kW for over 2,000 hours. Completion of the development and flight qualification of this technology would significantly reduce the risk and time necessary to respond to the discovery of potentially hazardous asteroid in the size range of 50- to 100-m diameter.

Reeves, David↗

Graphite for Accelerator Beam Intercepting Devices

Nuclear grade fine-grain graphite has played a central role in particle accelerator Beam Intercepting Devices, BID (e.g. targets or beam dumps) for decades, especially for high beam power facilities, such as at Fermilab, CERN, PSI and JPARC. Operations of these facilities have demonstrated graphite’s reliable performance at beam powers up to about 1 MW and enduring over 10 million thermal shock cycles of over 3x10 7 K/s. Planned future accelerator facilities will push BID beam power capability into the multi-MW regime. The material challenges of such MW-class accelerator facilities, how graphite may meet those challenges, as well as an overview of recent and current research on graphite for high power accelerator BID will be presented.

Burleigh, Abe [Fermilab]↗

Beamed microwave power transmitting and receiving subsystems radiation characteristics

Measured characteristics of the spectrum of typical converters and the distribution of radiated Radio Frequency (RF) energy from the terminals (transmitting antenna and rectenna) of a beamed microwave power subsystem are presented for small transmitting and receiving S-band (2.45 GHz) subarrays. Noise and harmonic levels of tube and solid-state RF power amplifiers are shown. The RF patterns and envelope of a 64 element slotted waveguide antenna are given for the fundamental frequency and harmonics through the fifth. Reflected fundamental and harmonic patterns through the fourth for a 42 element rectenna subarray are presented for various dc load and illumination conditions. Bandwidth measurements for the waveguide antenna and rectenna are shown.

Dickinson, R. M.↗

Quantitative Specifications to Avoid Degradation during E-Beam and Induced Current Microscopy of Halide Perovskite Devices

Degradation due to electron beam exposure has posed a challenge in the use of electron microscopy to probe halide perovskite materials and devices. Herein, the interaction between the electron beam and the perovskite across acceleration voltages and at low probe currents is investigated in a scanning electron microscope (SEM) by monitoring the electron-beaminduced current (EBIC) response in perovskite solar cells in a planview configuration. SEM probe conditions are identified where dozens of repeated scans over a single region of the perovskite solar cell induce minimal electronic degradation. Overall, the induced current response of the perovskite device is found to strongly depend upon the beam condition: rapid decay occurs at high beam powers, the current activates at the lowest beam powers, and a newfound quasi-steady response is revealed at intermediate beam conditions. A quantitative window for the successful conduction of e-beam studies with minimal electronic degradation is revealed by evaluating induced current response over a wide range of perovskite devices, which invites broader use of SEM-based characterization techniques, including EBIC, as powerful techniques for correlative microscopy investigations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗