Search NASASearch

SEARCH · Search NASA

Results for “Power System Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Modeling the Potential Impact of Storage on the US Power Sector in a Multisector Dynamic Context

The electric power sector is expected to grow in size, importance, and complexity around the world as economies expand and electric supply technologies and demand patterns evolve in significant ways. At the same time the electric power sector may see substantial increases in VRE generating technologies which can add variability and uncertainty to the diurnal and seasonal profile of electric supply. With these forces in play, the emergence of modular, flexible electricity storage technologies may have profound impacts on the operation of electric power systems. Here we reduce a storage modeling gap in MSD models by incorporating grid-based electricity storage into the electric sector dynamics of the Global Change Analysis Model-USA (GCAM-USA) with improved power sector representation. We find a potentially significant role for storage technologies in the future of the U.S. power system, with storage capacity ranging from 7.7 to 14.7 GW in 2050 and 13.9 to 31.6 GW in 2100 across several techno-economic scenarios. We also find that storage can help to smooth variability in residual load arising from evolving electricity demands and the introduction of high shares of VRE to the electric grid. This reduces reliance on high-cost peaking generators, improves system-wide capacity factors, and limits curtailment of VRE.

Patel, Pralit L.

McGrath Community Energy Planning

The City of McGrath, a remote Alaskan community reliant on diesel fuel, developed a Community Energy Plan through the Energy Technologies Innovation Partnership Project (ETIPP) to address high energy costs, infrastructure vulnerabilities, and long-term sustainability. Guided by community-led priorities and technical assistance from partners including NREL, REAP, and ANTHC, the plan identifies eight focus areas: distribution system upgrades, solar and battery integration, river energy potential, emergency backup power, housing efficiency, water system losses, independent power producer models, and targeted funding strategies. The plan combines local knowledge with technical analysis to chart a path toward a more resilient, affordable, and sustainable energy future for McGrath.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model

System Advisor Model (SAM) Improvements for Emerging Solar Thermal Applications

The System Advisor Model (SAM) is an open-source tool developed by NREL to simulate the techno-economic performance of technologies like photovoltaics, solar thermal, wind, and geothermal. NREL has recently completed, active, and planned projects to improve the solar thermal models in SAM and its underlying code base to represent emerging component technologies, systems, and applications. This poster describes new capabilities in the SolarPILOT optical modeling tool, supercritical carbon dioxide (sCO2) power cycles, and solar industrial process heat.

14 SOLAR ENERGY

Research Highlight - Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

We highlight our work from our previous publication titled "Dispatch Optimization, System Design, and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage" published in MDPI Energies 2022 (doi.org/10.3390/en15103599). Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

97 MATHEMATICS AND COMPUTING

Harnessing distributed GPU computing for generalizable graph convolutional networks in power grid reliability assessments

Although machine learning (ML) has emerged as a powerful tool for rapidly assessing grid contingencies, prior studies have largely considered a static grid topology in their analyses. This limits their application, since they need to be re-trained for every new topology. Here, this paper explores the development of generalizable graph convolutional network (GCN) models by pre-training them across a range of grid topologies and contingency types. We found that a GCN model with auto-regressive moving average (ARMA) layers with a line graph representation of the grid offered the best predictive performance in predicting voltage magnitudes (VM) and voltage angles (VA). We introduced the concept of phantom nodes to consider disparate grid topologies with a varying number of nodes and lines. For pre-training the GCN ARMA model across a variety of topologies, distributed graphics processing unit (GPU) computing afforded us significant training scalability. The predictive performance of this model on grid topologies that were part of the training data is substantially better than the direct current (DC) approximation. Although direct application of the pre-trained model to topologies that are not part of the grid is not particularly satisfactory, fine-tuning with small amounts of data from a specific topology of interest significantly improves predictive performance. In general, this paper highlights the feasibility of training large-scale GNN models to assess the reliability of power grids by considering a wide variety of grid topologies and contingency types. With the advent of foundational models in ML and the exponential increase in GPU computing clusters, generalizable ML models will significantly enhance how utilities manage power systems and make decisions in real-time or near-real-time.

24 - POWER TRANSMISSION AND DISTRIBUTION

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY

Analysis on Evaluations of Monterey Bay Aquarium Research Institute’s Wave Energy Converter’s Field Data Using WEC-Sim and Gazebo: A Simulation Tool Comparison

Although many studies have validated wave energy converter (WEC) numerical models against scaled prototype experimental data, there remains a notable lack of validation using data from full-scale deployed WECs. This paper compares two numerical models of Monterey Bay Aquarium Research Institute’s Wave Energy Converter (MBARI-WEC), a two-body point absorber with an electro-hydraulic power take-off system (PTO). The models are implemented in WEC-Sim/Simscape and Gazebo Simulator. A statistical analysis of the models was performed, and field results were obtained to compare the models’ accuracy in predicting the RMS piston velocity, RMS motor speed, and mean electric power compared to field data for 56 observations across varying sea states. The Gazebo model demonstrated a closer agreement across all three parameters for a majority of the observations. When compared to the field data, the Gazebo and WEC-Sim models exhibited average mean electric power overestimations of 13% and 22%, respectively.

16 TIDAL AND WAVE POWER

Automatic Loss Factor Modeling and Attribution on Unlabeled PV Energy Data

We present a novel approach for modeling the loss factors of photovoltaic power generation systems (PV systems). This method is a white-box machine learning model built on convex optimization that is fast, interpretable, and auditable. It takes as an input the measured daily energy produced by the system, over a multi-year period, and returns a multiplicative decomposition model of the daily energy signal and full attribution of the total energy loss to each feature. The methods section of this paper has two major components: (1) the description of the signal decomposition (SD) model, expressed in the SD framework, and (2) the attribution of total energy losses via Shapley values. We validate the method on synthetic and open-source data sets and compare to similar methods from the literature.

artificial intelligence

Regional Energy Deployment System (ReEDS) Model Documentation: 2025

The Regional Energy Deployment System (ReEDS) model is a capacity expansion and dispatch model that is primarily used for the contiguous U.S. electric power sector. The model relies on system-wide least cost optimization to estimate the type and location of future generation and transmission capacity. This document describes details of how the model is formulated, how it functions, and many of the key inputs.

15 GEOTHERMAL ENERGY

Reinforcement Learning-Based Approach for EMT Automation of Large-Scale PV Plants

In the pursuit of efficient and precise modeling of large-scale power systems, particularly utility-scale photovoltaic (PV) plants, Electromagnetic Transient (EMT) simulations play a crucial role. As utility-scale PV plants increase in size and complexity, traditional computational methods become inadequate, necessitating more advanced techniques. This paper highlights the progressive efforts made to accelerate EMT simulations. A novel continuous reinforcement learning (RL) strategy is explored to automate the differentiation and categorization of stiff and non-stiff differential algebraic equations (DAEs). The use of stiff and non-stiff integration methods applied to relevant parts of the DAEs assists with the speed-up of the simulations. The paper details the data acquisition, development and offline training of the RL model, leading to its validation that demonstrates a high precision in optimizing simulation methods. The proposed RL promises to significantly enhance the efficacy of EMT simulations, offering a robust framework for the future of power system analysis.

Xia, Qianxue

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Evaluating the Impact of Tritium Permeation Membrane Performance and Direct Internal Recycling on Fusion Fuel Cycle Efficiency Using TMAP8

An efficient fuel cycle is vital to sustainable and cost-effective energy generation in fusion systems. Since tritium is not widely available, fusion systems must breed their own tritium for sustainable fusion deuterium-tritium reactions. An inefficient fuel cycle increases the tritium inventory needed for operations, which increases costs, constraints on tritium management systems, and safety concerns. A fuel cycle model is a powerful tool for understanding tritium inventories and flow rates across all systems in the fuel cycle. By simplifying the technical details into time-dependent tritium flow rates and inventories, the model can simulate the entire fuel cycle with high computational efficiency, even for technologies that are still under development. It can therefore quantify the impact of new tritium management technologies on fuel cycle efficiency. To evaluate the impact of key components on reducing tritium inventory, we are using and expanding an existing fuel cycle models based on latest advancements in fuel cycle research. The new model integrates Tritium Permeation Membrane (TPM) and Direct Internal Recycling (DIR) to enhance tritium transport from blanket breeders and plasma exhaust. These fuel cycle models are implemented in TMAP8 (Tritium Migration Analysis Program, version 8), a MOOSE-based open-source application designed to provide cutting-edge capabilities for tritium transport and fuel cycle modeling. The study aims to demonstrate the extensibility of existing fuel cycle modeling capability in TMAP8 and to offer a proof-of-principle design for future fusion plant systems. The presentation will cover the performance of fuel cycle modeling capabilities available in TMAP8, highlight advancements in fuel cycle research, and present a sensitivity analysis of these models. The results underline potential approaches and technology solutions to lower tritium inventory requirements, highlighting their role in shaping the future of fusion energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Control Parameter Sensitivity Study for Inverter-Based-Resource Dominated Grids: A Small Signal Stability Approach and Framework

The growing adoption of renewable energy is driving the prevalence of inverter-based resources (IBRs) within power grids. Future power grids will integrate both grid-following IBRs (GFM-IBRs) and grid-forming IBRs (GFL-IBRs) alongside synchronous generators. Therefore, it is crucial to perform stability studies that account for all components and especially control interactions related to IBRs. Extensive research has performed to study the IBR-related stability, however, the sensitivity study of IBRs' control parameters on system stability has not been adequately studied yet, especially from a systematic way. Therefore, this paper conducts a small signal stability analysis for a generic grid with multiple types of resources and develops an analytical framework for assessing the sensitivity of control parameters affecting stability margins. To achieve that, the non-autonomous reduced-order non-linear dynamic model is developed for a generic power system with multiple synchronous generator-based resources (SGBRs), GFM-IBRs, and GFL-IBRs. Based on the analytic model, a systematic framework for parametric sensitivity on systems' asymptotic stability is developed. A parameter sensitivity analysis based on eigenvalue methods is proposed. The impact of the droop controllers of GFM-IBRs, PQ-dispatch and the PLL controller of GFL-IBR on the system asymptotic stability is discussed. This sensitivity study is aiming to provide deep insights on control parameters' impact on system stability, and gives direction for parameter tuning in case of instability.

24 POWER TRANSMISSION AND DISTRIBUTION

Evaluating the Impacts of Coordination for Cascaded Hydropower Plants on the Mid-Columbia

The Mid-Columbia region in the U.S. Pacific Northwest includes seven large, cascaded hydropower plants with a combined nameplate capacity of nearly 14 GW. These plants have several different operators, and there is currently limited coordination among the operators. We develop a detailed model of the Mid-Columbia system that captures both river flow constraints and power system operations. We then place this detailed model within a production cost model of a 2030 system of the Western Interconnection to evaluate how coordination of the Mid-Columbia hydropower plants might impact operations throughout the interconnection. We find that coordination of the Mid-Columbia plants leads to more generation from the Mid-Columbia plants and increased revenues for the Mid-Columbia operators. This benefit is achieved primarily through better utilization of the storage reservoirs and decreased spill through the cascade. We also evaluate the impacts of look-ahead on production costs and find that longer look-ahead values result in lower system-wide production costs.

13 HYDRO ENERGY

Studying the Impact of IBR Modeling on the Commonly Applied Transmission Line Protective Elements

It is a well-accepted fact that detailed inverter-based resource (IBR) models are needed for electromagnetic transient (EMT) studies, especially for protection studies and protection designs. However, it is not clear which modeling aspects should be included in the EMT model to accurately represent the IBR fault responses. Therefore, this paper addresses this gap by evaluating the impact of key modeling aspects (DC source, inverter model, power control, current/voltage control, and current limiting) on the response of protective relay elements both qualitatively and quantitatively. Both grid-following (GFL) and grid-forming (GFM) IBR models are comprehensively evaluated through a simplified real-world transmission network by varying the IBR modeling aspects, fault locations, and types. The insights and findings from this paper will benefit the power system protection community because this work provides modeling requirements and guidelines for IBR modeling so that correct IBR models will be used for protection scheme settings design.

grid-following inverter

Energy Scheduling-based Operating Envelopes including a Distribution System Branch Screening Algorithm

This paper presents an energy scheduling-based formulation for computing operating envelopes including a distribution branch screening algorithm, termed DBS-ES. The contribution of the paper is two-fold: firstly, it presents an innovative methodology for calculating operating envelopes using energy scheduling (baseline), and secondly, it enhances this methodology by incorporating a custom distribution branch screening algorithm (DBS-ES). The custom algorithm leverages power system knowledge to reduce both model build time and total processing time while maintaining the same scheduling results as the baseline. The effectiveness of the proposed approach is demonstrated through experiments on the IEEE13, IEEE123, and EPRI Secondary test feeders. Results highlight a 24.5% decrease in model build time and an 8.17% decrease in total processing time when using DBS-ES compared to the baseline, specifically for the IEEE123 test feeder. Additionally, the paper briefly discusses the influence of utility-controlled storage on computing operating envelopes, noting a general incre

24 POWER TRANSMISSION AND DISTRIBUTION