Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Assessment and Control of Spacecraft Charging Risks on the International Space Station

Electrical interactions between the F2 region ionospheric plasma and the 160V photovoltaic (PV) electrical power system on the International Space Station (ISS) can produce floating potentials (FP) on the ISS conducting structure of greater magnitude than are usually observed on spacecraft in low-Earth orbit. Flight through the geomagnetic field also causes magnetic induction charging of ISS conducting structure. Charging processes resulting from interaction of ISS with auroral electrons may also contribute to charging albeit rarely. The magnitude and frequency of occurrence of possibly hazardous charging events depends on the ISS assembly stage (six more 160V PV arrays will be added to ISS), ISS flight configuration, ISS position (latitude and longitude), and the natural variability in the ionospheric flight environment. At present, ISS is equipped with two plasma contactors designed to control ISS FP to within 40 volts of the ambient F2 plasma. The negative-polarity grounding scheme utilized in the ISS 160V power system leads, naturally, to negative values of ISS FP. A negative ISS structural FP leads to application of electrostatic fields across the dielectrics that separate conducting structure from the ambient F2 plasma, thereby enabling dielectric breakdown and arcing. Degradation of some thermal control coatings and noise in electrical systems can result. Continued review and evaluation of the putative charging hazards, as required by the ISS Program Office, revealed that ISS charging could produce a risk of electric shock to the ISS crew during extra vehicular activity. ISS charging risks are being evaluated in ongoing ISS charging measurements and analysis campaigns. The results of ISS charging measurements are combined with a recently developed detailed model of the ISS charging process and an extensive analysis of historical ionospheric variability data, to assess ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA analysis (estimated frequency of occurrence and severity of the charging hazards) are then used to select the hazard control strategy that provides the best overall safety and mission success environment for ISS and the ISS crew. This paper presents: 1) a summary of ISS spacecraft charging analysis, measurements, observations made to date, 2) plans for future ISS spacecraft charging measurement campaigns, and 3) a detailed discussion of the PRA strategy used to assess ISS spacecraft charging risks and select charging hazard control strategies

Koontz, Steve↗

Advanced Seismic Fragility Modeling using Nonlinear Soil-Structure Interaction Analysis

The goal of this effort is to compare the seismic fragilities of a nuclear power plant system obtained by a traditional seismic probabilistic risk assessment (SPRA) and an advanced SPRA that utilizes Nonlinear Soil-Structure Interaction (NLSSI) analysis. Soil-structure interaction (SSI) response analysis for a traditional SPRA involves the linear analysis, which ignores geometric nonlinearities (i.e., soil and structure are glued together and the soil material undergoes tension when the structure uplifts). The NLSSI analysis will consider geometric nonlinearities.

31274, LWRS↗

Risk analysis of an RTG on the Space Shuttle

As part of the effort to review the Ulysses Final Safety Analysis Report and to understand the risk of plutonium release from the Ulysses spacecraft General Purpose Heat Source-Radioisotope Thermal Generator (GPHS-RTG), the Interagency Nuclear Safety Review Panel (INSRP) and the author performed an integrated, quantitative analysis of the uncertainties of the calculated risk of plutonium release from Ulysses. Using state-of-the-art probabilistic risk assessment technology, the uncertainty analysis accounted for both variability and uncertainty of the key parameters of the risk analysis. The results show tht INSRP had high confidence that risk of fatal cancers from potential plutonium release associated with calculated launch and deployment accident scenarios is low.

Frank, Michael V.↗

Risk assessment of wellbore leakage during underground hydrogen storage

The expansion of renewable energy sources would require large-scale energy storage options to overcome the intermittent nature of these sources. Underground hydrogen storage (UHS) in depleted hydrocarbon reservoirs offers a scalable and practical energy storage solution. These reservoirs are chosen for their availability and large capacity, but the unique properties of hydrogen raise concerns about potential leakage pathways, particularly through wellbores. In this study, we develop and apply, for the first time, reduced-order models (ROMs) specifically designed for efficient leakage risk prediction in UHS systems operating in depleted hydrocarbon reservoirs. Using 3,000 high-fidelity simulation scenarios, we examine the influence of 11 key parameters, including reservoir and aquifer depths, wellbore permeability and porosity, initial saturations of water, oil and gas fractions (hydrogen, light, intermediate, and heavy hydrocarbons), reservoir pressure multiplier, and the aquifer-to-reservoir volume ratio, to simulate leakage behavior over a 1,000-year timescale. We train ROMs using a two-step classification-regression approach, achieving R 2 values exceeding 99 % across all targets. These ROMs effectively capture the leakage evolution and identify critical controls of leakage, guiding the design of mitigation strategies. Results indicate that gas leakage occurs in about 27 % of scenarios as early as five years post-operation, reaching volumes of up to 106 ft3. Oil leakage is less frequent (~17 %) and typically begins decades later. Our findings also show that hydrogen often migrates first, owing to its smaller molecular size and higher buoyancy, followed by heavier hydrocarbons. Over time, these heavier components contribute significantly to the total leaked volume, reinforcing the need for targeted monitoring and remediation strategies. Our analysis highlights that deeper storage reservoirs, shallower aquifers, and low-permeability wellbores significantly reduce leakage risks. In conclusion, this work offers a robust framework for risk-informed UHS deployment, supporting energy security through reliable large-scale hydrogen storage while safeguarding environmental integrity.

08 HYDROGEN↗

Monte Carlo Simulation of Markov, Semi-Markov, and Generalized Semi- Markov Processes in Probabilistic Risk Assessment

A standard tool of reliability analysis used at NASA-JSC is the event tree. An event tree is simply a probability tree, with the probabilities determining the next step through the tree specified at each node. The nodal probabilities are determined by a reliability study of the physical system at work for a particular node. The reliability study performed at a node is typically referred to as a fault tree analysis, with the potential of a fault tree existing.for each node on the event tree. When examining an event tree it is obvious why the event tree/fault tree approach has been adopted. Typical event trees are quite complex in nature, and the event tree/fault tree approach provides a systematic and organized approach to reliability analysis. The purpose of this study was two fold. Firstly, we wanted to explore the possibility that a semi-Markov process can create dependencies between sojourn times (the times it takes to transition from one state to the next) that can decrease the uncertainty when estimating time to failures. Using a generalized semi-Markov model, we studied a four element reliability model and were able to demonstrate such sojourn time dependencies. Secondly, we wanted to study the use of semi-Markov processes to introduce a time variable into the event tree diagrams that are commonly developed in PRA (Probabilistic Risk Assessment) analyses. Event tree end states which change with time are more representative of failure scenarios than are the usual static probability-derived end states.

English, Thomas↗

Design for Reliability and Safety Approach for the New NASA Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new launch vehicles, the ARES I and ARES V. Specifically, the paper addresses the use of an integrated probabilistic functional analysis to support the design analysis cycle and a probabilistic risk assessment (PRA) to support the preliminary design and beyond.

Safie, Fayssal M.↗

Baseline Medical System Translation for the Impact Medical Database

NASA has developed a new evidence-based data-driven probabilistic risk assessment and tradespace analysis tool as a successor to the Integrated Medical Model (IMM). This updated decision support tool is known as IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces). Whereas IMM focuses on the resources and risks associated with International Space Station (ISS) and Low Earth Orbit (LEO) missions, IMPACT estimates the frequency and consequences of medical conditions that might arise during exploration missions. One of the services offered by IMM is a series of generic or baseline medical systems associated with typical mission types or DRMs (Design Reference Missions), such that requestors may prioritize questions pertaining to the mission itself over the medical supplies indicated by the model outputs for that DRM. In a mission focused request, the appropriate baseline medical system is used in place of a prepared or optimized medical kit. In preparation, an effort was undertaken to create baseline systems of medical resources within IMPACT suitable for typical DRMs. Using an existing baseline medical system within IMM’s Integrated Medical Evidence Database (iMED) as a starting point, the resources found within the medical kit were compared to and substituted for equivalent resources available within the IMPACT MD (Medical Database). In consultation with clinicians with knowledge of IMPACT’s MD, each resource was matched as closely as possible to a similarly purposed resource in IMPACT, seeking to preserve the treatment capabilities and procedures offered by the IMM medical system while reconciling the differences in modeled resources and medical conditions between the models. To demonstrate the efficacy of this work, a prototype ISS medical system in IMPACT was translated from the baseline used in the IMM. The appropriate medical system was then run through its associated medical model to compare and validate the resultant risks and risk mitigation provided by each baseline ISS medical kit.

S Schwartz↗

Risk Methodology for Assessment of Fuel Debris Retrieval Options at the Fukushima Daiichi Nuclear Power Station

The mission of the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF) includes the mid-to-long-term decommissioning planning of the reactors at the Fukushima Daiichi Nuclear Power Station. To carry out its mission, NDF needs to be able to assess worker safety and public health risks that currently exist at the Fukushima Daiichi Nuclear Power Station and the implications of various actions that may be taken to reduce such risks. Pacific Northwest National Laboratory (PNNL) entered into a contract with NDF to support NDF’s mission by developing a risk assessment methodology that will support NDF’s evaluation of options for transitioning molten and solidified fuels within each unit into safer, more stable, configurations given the ever-changing state of knowledge and large uncertainties. The underpinning of this approach, which incorporates both expert elicitation and adapts probabilistic risk assessment and hazard analysis techniques, is its organization of potential release mechanisms and accident scenarios into a more manageable set of safety issues, which are systematically characterized to allow for useful comparison between fuel debris retrieval options as well as the identification of risk drivers and discriminators. The approach also lends itself to be easily updated as the general state of knowledge improves and will serve as a vital input to prioritizing future investigations associated with human health and safety at the Fukushima site. This paper describes the overall approach developed by PNNL to risk-inform the comparison between fuel debris retrieval strategies and discusses lessons learned from implementing the approach.

Fukushima, Risk Assessmnet, Nuclear Decommissionin↗

Probabilistic structural analysis algorithm development for computational efficiency

The PSAM (Probabilistic Structural Analysis Methods) program is developing a probabilistic structural risk assessment capability for the SSME components. An advanced probabilistic structural analysis software system, NESSUS (Numerical Evaluation of Stochastic Structures Under Stress), is being developed as part of the PSAM effort to accurately simulate stochastic structures operating under severe random loading conditions. One of the challenges in developing the NESSUS system is the development of the probabilistic algorithms that provide both efficiency and accuracy. The main probability algorithms developed and implemented in the NESSUS system are efficient, but approximate in nature. In the last six years, the algorithms have improved very significantly.

Wu, Y.-T.↗

RAVEN, a New Software for Dynamic Risk Analysis

RAVEN is a generic software driver to perform parametric and probabilistic analysis of code simulating complex systems. Initially developed to provide dynamic risk analysis capabilities to the RELAP-7 code [1] is currently being generalized with the addition of Application Programming Interfaces (APIs). These interfaces are used to extend RAVEN capabilities to any software as long as all the parameters that need to be perturbed are accessible by inputs files or directly via python interfaces. RAVEN is capable to investigate the system response probing the input space using Monte Carlo, grid strategies, or Latin Hyper Cube schemes, but its strength is its focus toward system feature discovery like limit surfaces separating regions of the input space leading to system failure using dynamic supervised learning techniques. The paper will present an overview of the software capabilities and their implementation schemes followed by same application examples.

97 MATHEMATICS AND COMPUTING↗

Identification and Assessment of Material Models for Age-Related Degradation of Structures and Passive Components in Nuclear Power Plants

When performing seismic safety assessments of nuclear power plants (NPPs), the potential effects of age-related degradation on structures, systems, and components (SSCs) should be considered. To address the issue of aging degradation, the Korea Atomic Energy Research Institute (KAERI) has embarked on a five-year research project to develop a realistic seismic risk evaluation system which will include the consideration of aging of structures and components in NPPs. Three specific areas that are included in the KAERI research project, related to seismic probabilistic risk assessment (PRA), are probabilistic seismic hazard analysis, seismic fragility analysis including the effects of aging, and a plant seismic risk analysis. To support the development of seismic capability evaluation technology for degraded structures and components, KAERI entered into a collaboration agreement with Brookhaven National Laboratory (BNL) in 2007. The collaborative research effort is intended to continue over a five year period with the goal of developing seismic fragility analysis methods that consider the potential effects of age-related degradation of SSCs, and using these results as input to seismic PRAs. In the Year 1 scope of work BNL collected and reviewed degradation occurrences in US NPPs and identified important aging characteristics needed for the seismic capability evaluations that will be performed in the subsequent evaluations in the years that follow. This information is presented in the Annual Report for the Year 1 Task, identified as BNL Report-81741-2008 and also designated as KAERI/RR-2931/2008. The report presents results of the statistical and trending analysis of this data and compares the results to prior aging studies. In addition, the report provides a description of U.S. current regulatory requirements, regulatory guidance documents, generic communications, industry standards and guidance, and past research related to aging degradation of SSCs. This report describes the research effort performed by BNL for the Year 2 scope of work. This research focused on methods that could be used to represent the long-term behavior of materials used at NPPs. To achieve this BNL reviewed time-dependent models which can approximate the degradation effects of the key materials used in the construction of structures and passive components determined to be of interest in the Year 1 effort. The intent was to review the degradation models that would cover the most common time-dependent changes in material properties for concrete and steel components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Extension of the ADAPT Framework for Multiple Simulators

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One limitation of the DDET driver codes developed to date (namely ADAPT, ADS, and MCDET ) is that the tree is driven by a single simulator. The goal of this work is a general multi-simulator driver. This limits the parameter space that may be explored in a single DDET to that which may be covered by a single simulator. In this work, the Analysis of Dynamic Accident Progression Trees (ADAPT) code is extended to support multiple arbitrary simulators. This capability will increase the depth and breadth of phenomena that may be analyzed in a single DDET. For example, a large-scale system code may pass the analysis to a more detailed code if certain conditions are met, in order to capture relevant phenomena that would be lost if only the system code were to be used. In addition, the time required to cover a given uncertainty space may be reduced by dynamically identifying and running only the situations that are appropriate given the plant conditions in each simulator. The use of multiple simulators is expected to further reduce subjectivity in PRA by enabling high fidelity modeling of reality. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Importance Measures in the ADAPT Framework

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until user-defined end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One current limitation of DDETs is the assessment of results, which is not as well developed as in traditional PRA. A concept that is used in PRA to assess the significance of a basic event is the concept of importance measures (IMs). In traditional PRA, IMs only consider the likelihood of occurrence of non-occurrence of a basic event. The application of importance measures to DDETs must take into consideration not only the occurrence and non-occurrence of an event, but also uncertain timing or severity. This work describes three general dynamic importance measures (DIMs) as implemented in the Analysis of Dynamic Accident Progression Trees (ADAPT) DDET driver code. The measures account for the change in progression of the DDET resulting from the different values of each uncertain variable under investigation. The DIMs are applied to a sample DDET to demonstrate the type of insights that may be gained from each one. These measures will facilitate comparison of the impact of dynamic branching events on a consequence of interest, which also allow DDETs to be used in prioritizing plant investments. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conditional Tree Reduction in the ADAPT Framework

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. A DDET may be orders of magnitude larger than a traditional event tree for the same initiating event, as more of the uncertainty space is likely to be explored and the tree does not require manual assembly. Because of the size, manual inspection of the entire DDET is often infeasible. This problem may be approached from the front by reducing the number of sampled branching values or by online pruning of the tree, thus reducing the total number of branches. Utilizing post-processing techniques to draw actionable insights via clustering has also been proposed. One post-processing tool to reduce the DDET according to user-defined rules has been recently implemented in the Analysis of Dynamic Accident Progression Trees (ADAPT) DDET driver code. The tool creates a 'slice' of the DDET comprised of the set of branches that meet a set of user-input rules, for immediate visualization or for further calculations conditional on the rules being met. This extension is expected to ease analysis of the results of large and complex DDETs, leading to greater applicability of DDETs in PRA. It should be emphasized that this tool is a visualization aide and does not impact the theoretical basis of the DDET approach. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Impact Outputs for A Representative Extended Duration Artemis Mission

BACKGROUND: As NASA and private industry begin preparation for long-duration spaceflight, quantifying the impact that potential human health and performance capabilities have on crew health outcomes is imperative for medical risk mitigation. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) applies Probabilistic Risk Assessment (PRA) methodology to estimate these outcomes. OVERVIEW: As NASA prepares to return to the Moon, medical system planning has already begun for extended Artemis missions, which will see humans spending months at a time in cis-lunar space and on the surface of the Moon. The Long Duration Lunar Orbital and Lunar Surface (LDLOLS) design reference mission (DRM) lasts 9 months, including 3 months on the lunar surface, and involves 2 male and 2 female crewmembers. LDLOLS assumes no extravehicular activities (EVAs) in orbit, but, while on the lunar surface, involves 2-4 EVAs/month in a pressurized rover and 2-4 EVAs/month in an unpressurized rover or on foot. This DRM assumes a physician level Crew Medical Officer with commensurate knowledge, skills, and abilities. The IMPACT tool was utilized to estimate in-flight medical risk for this mission. More specifically, 100,000 simulations of this DRM were modeled, and overall estimates for loss of crew life (LOCL), need for evacuation (RTDC; return to definitive care), and crew task time lost (TTL; a measure of disability) were calculated. A recommended medical capability set, with appropriate mass and volume constraints, was also generated. DISCUSSION: This abstract reviews the IMPACT-derived risk for these mission outcomes with and without treatment, a macroscopic look at the total mass and volume necessary for full diagnostic and treatment capability, and how these change with input mission parameters.

J G Steller↗

Pharmaceuticals Exposed to the Space Environment: Problems and Prospects

The NASA Human Research Program (HRP) Health Countermeasures Element maintains ongoing efforts to inform detailed risks, gaps, and further questions associated with the use of pharmaceuticals in space. Most recently, the Pharmacology Risk Report, released in 2010, illustrates the problems associated with maintaining pharmaceutical efficacy. Since the report, one key publication includes evaluation of pharmaceutical products stored on the International Space Station (ISS). This study shows that selected pharmaceuticals on ISS have a shorter shelf-life in space than corresponding terrestrial controls. The HRP Human Research Roadmap for planetary exploration identifies the risk of ineffective or toxic medications due to long-term storage during missions to Mars. The roadmap also identifies the need to understand and predict how pharmaceuticals will behave when exposed to radiation for long durations. Terrestrial studies of returned samples offer a start for predictive modeling. This paper shows that pharmaceuticals returned to Earth for post-flight analyses are amenable to a Weibull distribution analysis in order to support probabilistic risk assessment modeling. The paper also considers the prospect of passive payloads of key pharmaceuticals on sample return missions outside of Earth's magnetic field to gather additional statistics. Ongoing work in radiation chemistry suggests possible mitigation strategies where future work could be done at cryogenic temperatures to explore methods for preserving the strength of pharmaceuticals in the space radiation environment, perhaps one day leading to an architecture where pharmaceuticals are cached on the Martian surface and preserved cryogenically.

pharmacology↗