Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

Developing, Renewable, Energy, Projects, Facilitie↗

Development and Testing of a High Capacity Plasma Chemical Reactor in the Ukraine

This project, Development and Testing of a High Capacity Plasma Chemical Reactor in the Ukraine was established at the Kharkiv Institute of Physics and Technology (KIPT). The associated CRADA was established with Campbell Applied Physics (CAP) located in El Dorado Hills, California. This project extends an earlier project involving both CAP and KIPT conducted under a separate CRADA. The initial project developed the basic Plasma Chemical Reactor (PCR) for generation of ozone gas. This project built upon the technology developed in the first project, greatly enhancing the output of the PCR while also improving reliability and system control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

WINS. Market Simulation Tool for Facilitating Wind Energy Integration

Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.

17 WIND ENERGY↗

Lakeside: Merging Urban Design with Scientific Analysis

Researchers at the U.S. Department of Energy's Argonne National Laboratory and the University of Chicago are developing tools that merge urban design with scientific analysis to improve the decision-making process associated with large-scale urban developments. One such tool, called LakeSim, has been prototyped with an initial focus on consumer-driven energy and transportation demand, through a partnership with the Chicago-based architectural and engineering design firm Skidmore, Owings & Merrill, Clean Energy Trust and developer McCaffery Interests. LakeSim began with the need to answer practical questions about urban design and planning, requiring a better understanding about the long-term impact of design decisions on energy and transportation demand for a 600-acre development project on Chicago's South Side - the Chicago Lakeside Development project.

42 ENGINEERING↗

Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO 2 ) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

03 NATURAL GAS↗

From TPL assessment to design optimization: Wave energy converter control co-design applied to the RM3

The Reference Model (RM) project developed six marine energy converter concepts using a sequential design methodology, which, while widely adopted in the industry, often overlooks interactions between system components, resulting in suboptimal designs. One such example is the Reference Model 3 (RM3), a two-body point absorber wave energy converter (WEC). An assessment using the Technology Performance Level (TPL) revealed that RM3’s low power-to-cost ratio, partly due to expensive steel construction, limits its techno-economic performance. Here, this study aims to redesign RM3 by reducing its scale and employing control co-design to integrate WEC and Power Take-Off (PTO) dynamics, constraints, and cost considerations within an optimization framework. We demonstrate the limitations of RM3’s current PTO design and explore the benefits of scaling down to enhance techno-economic viability by lowering material costs. Using WecOptTool, we conduct a parameter sweep over gear ratios and spring stiffnesses for various Commercial Off-The-Shelf generators in irregular wave conditions. Our findings emphasize the importance of aligning PTO components with WEC dynamics, showing that control co-design and strategic scaling can improve RM3’s power-to-cost ratio. This study presents a transferable example of applied control co-design for other WECs, supporting early-stage developers in their design decisions.

Off the shelf components↗

External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration

The ultimate scope of Industrial Application #2 (IA) of the LWRS/RISMC project is a realistic simulation of natural external hazards that impose threat to a NPP. This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk- informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic PRA. This summary presents the key points of methodology being developed and the very first sample application of it to a simple problem (spent fuel pool).

Dynamic PRA↗

External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration

The ultimate scope of Industrial Application no.2 (IA) of the LWRS/RISMC project is a realistic simulation of natural external hazards that impose threat to a NPP. This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk-informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic PRA. A so-called Risk Informed Margin Management (RIMM) approach is being used to represent meaningful (i.e., realistic facility representation and simulation) event scenarios and consequences by linking probabilistic simulations to external events physics. Calculations performed so far demonstrated the capabilities of the proposed methodology in analyzing multi-hazards generated by External Events. The sample application described in this paper allowed identifying the main issues (code interfaces, computational and human resources needed, simplifications) connected to such kind of advanced analysis. The next steps will be the risk-informed earthquakes and flooding analysis of a system of a generic PWR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Project Entitled "Developing a Mobile Torrefaction Machine" (STTR Phase 1 Final Technical Report)

The goal of this project, sponsored by Agri-Tech Producers, LLC (ATP), the small business grantee, was to determine if the torrefaction technology, developed by North Carolina State University (NCSU), which ATP has licensed, could be feasibly deployed in a mobile unit. The study adds to the area investigated, by having ATP’s STTR Phase I team give thoughtful consideration to how to use NCSU’s technology in a mobile unit. The findings by ATP’s team were that NCSU’s technology would best perform in units 30’ by 80’ (See Spec Sheet for the Torre-Tech 5.0 Unit in the Appendix) and the technical effectiveness and economic feasibility investigation suggested that such units were not easily, efficiently or safely utilized in a forest or farm setting. (Note rendering of possible mobile system in the Appendix) Therefore, the findings by ATP’s team were that NCSU’s technology could not feasibly be deployed as a mobile unit.

09 BIOMASS FUELS↗

Workflow for Developing and Operating Subsurface Hydrogen Storage Facilities in Porous Reservoirs

Long-duration (seasonal) storage of natural gas (NG), which primarily consists of methane (CH 4 ), has been practiced for more than a hundred years at underground gas storage (UGS) facilities that use depleted hydrocarbon reservoirs, saline aquifers, and salt caverns. To enable hydrogen (H 2 ) to be used as a long-duration, energy-storage medium, similar facilities are envisioned for underground H 2 storage (UHS) of either H 2 or H 2 /NG mixtures. Experience with UGS can be used to guide recommended practices for developing and operating UHS facilities in porous reservoirs. The most important factors (formation/fluid properties and engineering choices) that influence the performance of UHS reservoirs have been identified and quantified in previous studies. These factors and choices influence phenomena that determine the sweep efficiency of the stored working gas. These phenomena include viscous fingering, hysteretic capillary trapping, and gravity override of the working gas, as well as the upconing of nonproductive fluid that determine the sweep efficiency of the stored working gas. This report describes initial recommended-practices and a project-development workflow for UHS facilities that utilize porous reservoirs, based on the current state-of-knowledge about H 2 behavior in the subsurface. The workflow sequentially addresses all aspects of UHS project development, including the identification of H 2 sources and users, site ranking and down-selection, geologic and reservoir-engineering characterization, reservoir design, testing, risk management, commissioning, operations, and monitoring for a UHS facility. The goal is to enable UHS facilities to be developed in an efficient and timely manner, while carefully managing project risks. This workflow is similar to that which has been developed for UGS facilities (see Figure 1 of API, 2022), with the addition of tasks and subtasks specific to H 2 and UHS. The project-development workflow is broken down into three major stages: (1) define the H 2 use case; (2) rank, down-select, and characterize potential, candidate UHS sites; and (3) reservoir design, integrity testing, risk assessment, commissioning, operations, and monitoring for selected UHS sites. Each major stage is further broken down into tasks and subtasks, which are described at a high level. This report also provides more detailed descriptions of all tasks and subtasks that involve reservoir analysis and testing.

08 HYDROGEN↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

FINAL PROJECT REPORT DOE Early Career Principal Investigator Program Project Title: Developing New Mathematical Models for Multiphase Flows Based on a Fundamental Probability Density Function Approach

This final project report summarizes progress made towards the objectives described in the proposal entitled “Developing New Mathematical Models for Multiphase Flows Based on a Fundamental Probability Density Function Approach”. Substantial progress has been made in theory, modeling and numerical simulation of turbulent multiphase flows. The consistent mathematical framework based on probability density functions is described. New models are proposed for turbulent particle-laden flows and sprays.

97 MATHEMATICS AND COMPUTING↗

Utah FORGE 1-2551: Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores - Workshop Presentation and Report

Included here are a presentation recording, slides, and report on the Multi-Stage Fracturing System and Well Tractor to Enable Zonal Isolation During Stimulation and EGS Operations in Horizontal Wellbores project by Colorado School of Mines, presented by Dr. William W. Fleckenstein. One goal of the project is to develop and demonstrate the use of low-cost, rapid multistage fracture stimulation technology with cemented casing frac sleeves that eliminates packers used in both conventional stimulation and injection flow control. The second goal is to develop and demonstrate the devices to effectively detect and control the flow of heat-carrier fluid solely from a long-reach injector through the network of induced and existing fractures and produced from an open-hole long-reach well to improve heat recovery. This presentation was featured in the Utah FORGE R&D Annual Workshop on September 7, 2023. The workshop provided a valuable opportunity to explore the progress made in each of the 17 Research and Development projects funded under Solicitation 2020-1 which aim to enhance our understanding of the crucial factors influencing the development of Enhanced Geothermal Systems (EGS) reservoirs and resources.

15 GEOTHERMAL ENERGY↗

SECARB-USA: Needs Assessment Framework for Storage Complexes

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO 2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs of for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

42 ENGINEERING↗

Thermoplastic Composite Compressed Gas Storage (CGS) Tanks

This report summarizes the progress made on utilizing polyamide carbon fiber tapes for composite overwrapped pressure vessels (CPVs) using Automated Fiber Placement (AFP). This project is joint development project run through the Institute for Advance Composite Manufacturing Innovation (IACMI) with DuPont, Steelhead Composites, University of Dayton Research Institute, and the Composites Prototyping Center. Over the course of this program, the Team developed and/or demonstrated the materials and processes that are required to produce vessels for compressed gas storage, including polyamide matrix formulation, unidirectional polyamide/carbon fiber tape production, and automated fiber placement on a vessel liner. In addition, a cost of manufacture analysis was performed that compares Type III and Type IV vessels made with both thermoplastic and thermoset chemistries. This report summarizes the myriad of technical advances made during this project, culminating with production and testing of an aluminum-lined Type III pressure vessel. Each step was optimized locally so as to produce the best material. The end result was a test vessel that, while demonstrating some of the benefits of thermoplastic matrix composites, did not perform as well as those produced by filament winding of carbon fiber/epoxy prepregs. This was most likely due to the Team’s focus on local optimization rather than globally optimizing the entire process from beginning to end. Should further work be contemplated, a more focused effort on global optimization should be pursued.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DEVELOPMENT OF METHODOLOGY AND FIELD DEPLOYABLE SAMPLING TOOLS FOR SPENT NUCLEAR FUEL INTERROGATION IN LIQUID STORAGE

This project developed methodology and field deployable tools (test kits) to analyze the chemical and microbiological condition of the fuel storage medium and determine the oxide thickness on the spent fuel basin materials. The overall objective of this project was to determine the amount of time fuel has spent in a storage basin to determine if the operation of the reactor and storage basin is consistent with safeguard declarations or expectations. This project developed and validated forensic tools that can be used to predict the age and condition of spent nuclear fuels stored in liquid basins based on key physical, chemical and microbiological basin characteristics. Key parameters were identified based on a literature review, the parameters were used to design test cells for corrosion analyses, tools were purchased to analyze the key parameters, and these were used to characterize an active spent fuel basin, the Savannah River Site (SRS) L-Area basin. The key parameters identified in the literature review included chloride concentration, conductivity, and total organic carbon level. Focus was also placed on aluminum based cladding because of their application to weapons production. The literature review was helpful in identifying important parameters, but relationships between these parameters and corrosion rates were not available. Bench scale test systems were designed, operated, harvested, and analyzed to determine corrosion relationships between water parameters and water conditions, chemistry and microbiological conditions. The data from the bench scale system indicated that corrosion rates were dependent on total organic carbon levels and chloride concentrations. The highest corrosion rates were observed in test cells amended with sediment, a large microbial inoculum and an organic carbon source. A complete characterization test kit was field tested to characterize the SRS L-Area spent fuel basin. The sampling kit consisted of a TOC analyzer, a YSI multiprobe, and a thickness probe. The tools were field tested to determine their ease of use, reliability, and determine the quality of data that each tool could provide. Characterization was done over a two day period in June 2011, and confirmed that the L Area basin is a well operated facility with low corrosion potential.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gains in operational flexibility, safety margins, and cost efficiencies via integrated Plant Reload Optimization platform

The U.S. Department of Energy Light Water Reactor Sustainability Program Risk-Informed Systems Analysis Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimizing core design. Optimizing the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible core configuration options, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization platform, which supports artificial-intelligence-based reactor core designing, is now fully capable of handling realistic problems. The Plant ReLoad Optimization platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual ENvironment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multiobjective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗