Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

NGNP Risk Management through Assessing Technology Readiness

Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

42 ENGINEERING↗

Quality framework proposal for Component Material Evaluation (CME) projects.

This report proposes the first stage of a Quality Framework approach that can be used to evaluate and document Component Material Evaluation (CME) projects. The first stage of the Quality Framework defines two tools that will be used to evaluate a CME project. The first tool is used to decompose a CME project into its essential elements. These elements can then be evaluated for inherent quality by looking at the subelements that impact their level of quality maturity or rigor. Quality Readiness Levels (QRLs) are used to valuate project elements for inherent quality. The Framework provides guidance for the Principal Investigator (PI) and stakeholders for CME project prerequisites that help to ensure the proper level of confidence in the deliverable given its intended use. The Framework also Provides a roadmap that defined when and how the Framework tools should be applied. Use of these tools allow the Principal Investigator (PI) and stakeholders to understand what elements the project will use to execute the project, the inherent quality of the elements, which of those are critical to the project and why, and the risks associated to the project's elements.

97 MATHEMATICS AND COMPUTING↗

PROJECT FEVER – Fostering Electric Vehicle Expansion in the Rockies

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unification and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.

33 ADVANCED PROPULSION SYSTEMS↗

Commercialization Effort for 1W Consumer Electronics Power Pack

A commercial ready fuel cell charger has been further developed, demonstrated, and field tested during the three phases of this project. The work performed and demonstrated has shown the commercialization readiness of this future product and underlying technology. The tasks in phase 1 of the project focused on component cost reduction, redesign for manufacturability, performance & reliability testing, and system integration. The end of phase 1 was completed on time and was signified by passing the Go/No-Go checkpoint. As shown in the report all technical metrics have been met or exceeded and the Go/No-Go checkpoint was passed in November of 2009. The tasks in phase 2 focused on tool fabrication and tooled component prove-out in working systems. The end of Phase 2 was the accomplishment of building working systems made almost completely of tooled components. The tasks in phase 3 of the project were preparing for and executing a 75 unit field test of the DMFC charger product developed in Phase 1 and phase 2. This field test demonstrated the functionality of the DMFC in the hands of real users while also providing feedback for potential design improvements. This was the first time a significant number of MTI units were put into the field to test usability and functionality. Feedback from the field test was positive and the units functioned well in the field.

08 HYDROGEN↗

Electrochemical Reduction of Flue Gas Carbon Dioxide to Commercially Viable C2-C4 Products (Final Report)

This is the final scientific/technical report for a DOE project focused on the electrochemical conversion of CO 2 in non-aqueous solvents to novel products. Electrochemical reduction of CO 2 provides an attractive route to produce valuable fuels and chemicals that can simultaneously lower greenhouse gas emissions when powered by renewable electricity. While recent technological advances have shown the feasibility of industrial CO 2 electroreduction, many challenges remain to improve this technology and expand the list of economically viable products. The vast majority of electrochemical CO 2 reduction research has been conducted in aqueous media under neutral to alkaline conditions, leading to commonly reported products including carbon monoxide, formic acid, methane, methanol, ethylene, acetic acid, and ethanol. In comparison, non-aqueous media for CO 2 reduction has been underexplored but represents a possible avenue to yield new products and improved operating conditions. The aim of the project was to convert waste CO 2 in the form of flue gas to a multicarbon C2 - C4 chemical product in a reactor designed to achieve economically competitive values of current density and selectivity. The project strived to advance the technology readiness of an electrochemical CO 2 reduction process in alcohol solvents from the proof-of-concept stage to a device capable of meeting performance metrics for commercial viability. In the initial plan, the University of Louisville researchers were to focus on investigating the electrochemical process and improving the faradaic efficiency for novel C2 – C4 species, while also working on a parallel effort to build a practical electrolysis reactor to markedly increase the CO 2 reduction current density. The reactor development effort also aimed to engineer a dual-electrolyte feed strategy with non-aqueous catholyte and aqueous anolyte to promote water oxidation as the coupling anodic half-reaction to enable a sustainable and economical overall process. At the outset, the University of North Dakota was to investigate the feasibility of operating directly from coal-derived flue gas without separate capture and purification. The research team sought to determine impurity effects and test mitigation strategies, as well as engineer the gaseous feed system for high reactor tolerance to lower CO 2 concentration. In the last half year of the project, the focus was planned to shift to integrating the advances in the catalysis, electrochemical conditions, reactor design, and flue gas compatibility into a fully functional device and improve it for maximum current density and faradaic efficiency for C2 – C4 species. Knowledge of the full system components, constraints, and maximum performance was then to be used as the basis for a thorough technoeconomic analysis (TEA) and life cycle analysis (LCA) at the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Greenidge Multi-Pollutant Control Project

The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. About 44% of the funding for the project was provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and the remaining 56% was provided by AES Greenidge. Project goals included reducing high-load NO{sub x} emissions to {le} 0.10 lb/mmBtu; reducing SO{sub 2}, SO{sub 3}, HCl, and HF emissions by at least 95%; and reducing Hg emissions by at least 90% while the unit fired 2-4% sulfur eastern U.S. bituminous coal and co-fired up to 10% biomass. This report details the final results from the project. The multi-pollutant control system was constructed in 2006, with a total plant cost of $349/kW and a footprint of 0.4 acre - both substantially less than would have been required to retrofit AES Greenidge Unit 4 with a conventional SCR and wet scrubber. Start-up of the multi-pollutant control system was completed in March 2007, and the performance of the system was then evaluated over an approximately 18-month period of commercial operation. Guarantee tests conducted in March-June 2007 demonstrated attainment of all of the emission reduction goals listed above. Additional tests completed throughout the performance evaluation period showed 96% SO{sub 2} removal, 98% mercury removal (with no activated carbon injection), 95% SO{sub 3} removal, and 97% HCl removal during longer-term operation. Greater than 95% SO{sub 2} removal efficiency was observed even when the unit fired high-sulfur coals containing up to 4.8 lb SO{sub 2}/mmBtu. Particulate matter emissions were reduced by more than 98% relative to the emission rate observed prior to installation of the technology. The performance of the hybrid SNCR/SCR system was affected by problems with large particle ash, ammonia slip, and nonideal combustion characteristics, and high-load NO{sub x} emissions averaged 0.14 lb/mmBtu during long-term operation. Nevertheless, the system has reduced the unit's overall NO{sub x} emissions by 52% on a lb/mmBtu basis. The commercial viability of the multi-pollutant control system was demonstrated at AES Greenidge Unit 4. The system, which remains in service after the conclusion of the project, has enabled the unit to satisfy its permit requirements while continuing to operate profitably. As a result of the success at AES Greenidge Unit 4, three additional deployments of the Turbosorp{reg_sign} technology had been announced by the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Bench-scale Development of an Advanced Solid Sorbent-based CO 2 Capture Process for Coal-fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s Advanced Solid Sorbent CO 2 , Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their high CO 2 loadings, low heat capacities, reduced corrosivity/volatility and the potential to reduce the regeneration energy needed to carry out CO 2 capture. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling and circulation control, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab- and bench-scale testing. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which process development, sorbent development, and economic analyses have informed each of the other development processes. Development efforts have focused on improving the performance stability of sorbent candidates, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production process and scale-up of PEI-impregnated, fluidizable sorbents. Refinement of the process engineering and design, as well as the construction and operation of a bench-scale research unit has demonstrated promising CO 2 capture performance under simulated coal-fired flue gas conditions. Parametric testing has shown how CO 2 capture performance is impacted by changing process variables, such as Adsorber temperature, Regenerator temperature, superficial flue gas velocity, solids circulation rate, CO 2 partial pressure in the Regenerator, and many others. Long-term testing has generated data for the project team to set the process conditions needed to operate a solids-based system for optimal performance, with continuous 90% CO 2 capture, and no operational interruptions. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of < $40/T-CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s CO 2 capture technology to TRL-4 (nearly TRL-5, with the missing variable being testing on actual, coal-fired flue gas), according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

01 COAL, LIGNITE, AND PEAT↗

Acoustophoretic Additive Manufacturing for Scalable 3D Battery Electrodes

This project focused on investigating two acoustic-based processing methods: a nozzle-based printhead and a chamber that map to two different battery electrode architectures: (1) a line-pattern electrode and (2) a grid-pattern electrode. These two parallel manufacturing and electrode geometry explorations were proposed for the project to understand the process space of acoustic-based manufacturing methods to fabricate patterned battery electrodes. This two-path exploration also allowed us to de-risk the overall project and not rely on a single process for creating patterned electrodes. This project consisted of six high-level tasks aimed at transitioning the concept of acoustic focusing for battery electrodes from a technology readiness level (TRL) of 1 to 3 by project conclusion. Overall, we believe we have developed a practical and high-impact processing method that is chemistry agnostic and suitable for large-area fabrication of both 3D LIBs and other functional material systems where structuring on the scale of tens of microns has the potential to break conventional bulk material trade-offs in performance. In the case of batteries for electric vehicles, structuring 3D LIBs with our acoustic process breaks traditional energy and power trade-offs observed with conventional flat battery packs.

25 ENERGY STORAGE↗

Retrospective on Recent DOE-Funded Studies Concerning the Extraction of Rare Earth Elements & Lithium from Geothermal Brines (Final Report)

Rare earth elements (REE) and lithium are non-toxic metals that are considered critical materials due to their use in electronics, magnets, batteries, and a wide variety of industrial processes important for the economy and military preparedness. Demand for REE and lithium is increasing and these critical materials are imported, so identifying and exploiting domestic sources of REE and lithium is a national priority. The U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) has been in the forefront of sponsoring research investigating the potential recovery of REE, lithium, and other critical minerals from geothermal brines. It has been proposed that the future of geothermal energy should include “hybrid systems” that combine electricity generation with other revenue-generating activities, such as recovery of valuable and critical minerals, including REE and lithium. Two recent GTO funding opportunities have focused on the recovery of REE and other valuable minerals from geothermal brines. The research supported by the GTO’s mineral recovery program is focused on three areas: resource characterization, technology for the extraction of REE, and technology for the extraction of lithium (Tables 1 and 2). This report is a retrospective study examining the outcome of GTO’s two recent mineral recovery programs (DE-FOA-0001016 in FY 2014 and DE-FOA-0001376 in FY 2016). In this report, the knowledge, technology, and techniques that were developed by researchers funded by GTO are summarized and discussed. Four projects were funded to assess the concentrations and amounts of REE found in geothermal brines and oil field produced waters. The GTO-funded studies compiled publically available data on REE concentrations from brines and produced water from all over the USA. In addition, new samples were collected and characterized from major geothermal and hydrocarbon basins in the Western USA. The studies examined the relationship between lithology and REE concentrations and developed models examining the influence of geology on REE concentrations in produced brines. It was determined that REE are frequently found at higher concentrations in oil field produced water than geothermal brines, but that some geothermal areas had significant REE resources. Significant reservoirs of REE were identified in the Western USA. In some cases, concentrations of REE were more than 1000 times the concentrations found in seawater. Collectively, these studies represent a comprehensive picture of REE resources associated with geothermal and hydrocarbon systems in the USA. The studies did not examine lithium resources, but in some cases, lithium concentration data was collected. Data from these studies are housed in the Geothermal Data Repository (GDR) and represent a significant information resource and it is recommended that these data be further analyzed in a future study. Eight projects were funded to develop new technology for REE extraction from geothermal fluids. These projects investigated sorption as an approach for removal and recovery of REE from geothermal brines. The projects investigated cutting-edge technology for selective sorption of ions from complex solutions, including the application of metal-organic frameworks and biosorbent proteins. The REE sorption studies tested different combinations of metal-binding ligands and solid supports. The most promising metal-binding ligands for REE included phosphonic acid, thiol, and carboxylic acid functional groups. Ligands were attached or incorporated into a wide variety of solid supports. In most cases, attachment was via covalent bonding to organic resins, polymers, or silica-based supports. Most of the REE projects were conducted at a low technology readiness level (TRL) and showed promise, but direct comparison between technologies was not possible based on the available information. It is recommended that testing and reporting be standardized to the extent possible to facilitate comparisons between technologies. Two projects were directed at novel lithium extraction technology. Both projects investigated the use of inorganic sorbents, including manganese oxides. One study also examined the use of metal- ion imprinted polymers as selective ion-exchange resins for the separation of lithium and manganese from brines. Both approaches showed promise for the selective extraction of lithium from brines, including potentially geothermal brines. Results from these GTO studies indicated that selective REE and lithium extraction is possible, but interference from co-occurring solutes, such as calcium, magnesium, or heavy metals, will interfere with process efficiency and negatively impact process economics. Techno-economic analysis conducted as part of the resource and technology studies suggest extraction of REE from geothermal brines is unlikely to be economically viable, especially since non-geothermal produced waters frequently have higher REE concentrations. It is recommended that benchmarks for techno-economic analysis be established to the extent possible for future studies, to facilitate direct comparison of various technologies. Based on the collective results of this program, it appears that hybrid geothermal power would benefit more from recovery of lithium and other metals, rather than REE. It is recommended that future studies be conducted at a higher- TRL and that sorbents be tested against actual geothermal fluid samples. Prior higher-TRL efforts to extract metals from geothermal brines should be further evaluated for lessons learned.

36 MATERIALS SCIENCE↗

Green-House-Gas-Reduced Coal-and-Biomass-to-Liquid-Based Jet Fuel (GHGR-CBTL) Process - Final Technical report

This Final Technical Report describes the work and accomplishments of the project entitled, “Green-House-Gas-Reduced Coal-and-Biomass-to-Liquid-Based Jet Fuel (GHGR-CBTL) Process”. The main objective of the project was to raise the Technology Readiness Level (TRL) of the GHGR-CBTL fuel-production technology from TRL 4 to TRL 5 by producing a drop-in synthetic Jet Propellant 8 (JP-8) with a greenhouse-gas footprint less than or equal to petroleum-based JP-8 by utilizing mixtures of coal and biomass as the feedstock. The system utilizes the patented Altex fuel-production technology, which incorporates advanced catalysts developed by Pennsylvania State University. While the system was not fabricated and tested, major efforts were expended to design the 1-TPD and a full-scale plant. The system was designed, a Block-Flow Diagram (BFD), a Process-Flow Diagram (PFD), and Piping-and-Instrumentation Diagrams (P&IDs) were produced, a Bill of Materials (BOM) and associated spec sheets were produced, commercially available components were selected and procured, custom components were designed and fabricated, catalysts were developed and screened for performance, and permitting activities were conducted. Optimization tests for JP-8 production using C2 olefin as the feed were performed over a range of temperatures, pressures and WHSVs. Liquid yields of between 63 to 65% with 65% JP-8 fraction (41-42% JP-8 yield) at 50 psig were achieved. Life-Cycle Analysis (LCA) was performed by Argonne National Laboratory (ANL), and a GHGR-CBTL module was added to the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET®) model. Based upon the experimental results, the plant design was reconfigured for zero natural-gas imports and minimal electricity imports. The LCA analysis of the reconfigured process utilizing the GREET model showed that if the char from the process was utilized to produce combined heat and power (CHP) then a feed containing 23 wt% biomass and 77 wt% lignite would be needed for parity with petroleum-based JP-8. If the char is not utilized for CHP, but sequestered in a land fill, 24 wt% biomass and 76 wt% lignite would be required. A TEA was performed on this configuration following DOE guidelines and using the ANL-developed GREET module that showed that the GHGR-CBTL TOC and ECO are 69% and 58% of those for the DOE FT-Liquids Baseline Case, respectively. This analysis shows that the economics of the GHGR-CBTL process are significantly better than a gasification/FT process. No technical barriers were identified. The lower costs and the detailed design that was performed under this project are being used by Altex to attract funding partners to move the GHGR-CBTL development forward.

01 COAL, LIGNITE, AND PEAT↗

DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St. Paul, Minnesota

For this project, Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to develop the first Zero Energy Ready Home (ZERH) in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout ranch-style home with all the creature comforts. Along with meeting ZERH standards, Amaris also achieved certifications for Leadership in Energy & Environmental Design for Homes v4, MN Green Path Emerald, and a Builders Association of the Twin Cities Reggie Award of Excellence. The home achieves a HERS score of 41 without photovoltaics; with PV, the home achieves a HERS score of 5.

Building America↗

Centipod WEC Design for PacWave (Final Technical Report)

This project developed a Wave Energy Converter (WEC) system design that was ready for fabrication, deployment, and prototype testing at PacWave. The WEC design incorporated the International Electrotechnical Commission (IEC) Technical Specifications (TS) and Institute of Electrical and Electronics Engineers (IEEE) standards to ensure that designs are fully ready to utilize for future fabrication and open-water testing. Moreover, the project began the certification process with a certification provider, allowing for a seamless continuation into future work beyond project-end.

16 TIDAL AND WAVE POWER↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗

A Light and Effective Wide Field Monitor for Gamma Ray Bursts and Transient Sources

We present here a concept for a light and low-power wide field monitor working in the X-ray range, suitable for simultaneous imaging of large portions of the sky and GRB localizations. Our concept evolves from and improves on the design of the 5-kg SuperAGILE experiment, flying on the AGILE mission and currently delivering arcmin-localizations of GRBs at a rate of about 1/month. Similar to SuperAGILE, our concept is based on position sensitive silicon detectors equipped with one-dimensional coded masks. Different options are available for the detector, whose properties, combined with the scientific requirements, drive the design of the experiment. Our approach is based on a modular detector. The experiment design can then be tailored to specific scientific goals of the experiment or the mission (e.g., to cite GRBs only: the brightest GRBs/XRFs on a large field of view - FoV, or many low-fluence GRBs/XRFs on a smaller FoV, or the low energy spectrum of the prompt event, or the detection of high-z GRBs). In this paper we describe the concept, the main detector properties and outline some possible experiment configurations, with examples of their expected performance. Different experiment configurations in terms of area, FoV, angular resolution may be designed starting from the same detectors. Instead, the band-pass is mostly related to the detector properties. A key point of our project is the high degree of readiness of the detectors that are at production level and may be immediately proposed for a future experiment onboard missions with high readiness requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Coalbed Methane Procduced Water Treatment Using Gas Hydrate Formation at the Wellhead

Water associated with coalbed methane (CBM) production is a significant and costly process waste stream, and economic treatment and/or disposal of this water is often the key to successful and profitable CBM development. In the past decade, advances have been made in the treatment of CBM produced water. However, produced water generally must be transported in some fashion to a centralized treatment and/or disposal facility. The cost of transporting this water, whether through the development of a water distribution system or by truck, is often greater than the cost of treatment or disposal. To address this economic issue, BC Technologies (BCT), in collaboration with Oak Ridge National Laboratory (ORNL) and International Petroleum Environmental Consortium (IPEC), proposed developing a mechanical unit that could be used to treat CBM produced water by forming gas hydrates at the wellhead. This process involves creating a gas hydrate, washing it and then disassociating hydrate into water and gas molecules. The application of this technology results in three process streams: purified water, brine, and gas. The purified water can be discharged or reused for a variety of beneficial purposes and the smaller brine can be disposed of using conventional strategies. The overall objectives of this research are to develop a new treatment method for produced water where it could be purified directly at the wellhead, to determine the effectiveness of hydrate formation for the treatment of produced water with proof of concept laboratory experiments, to design a prototype-scale injector and test it in the laboratory under realistic wellhead conditions, and to demonstrate the technology under field conditions. By treating the water on-site, producers could substantially reduce their surface handling costs and economically remove impurities to a quality that would support beneficial use. Batch bench-scale experiments of the hydrate formation process and research conducted at ORNL confirmed the feasibility of the process. However, researchers at BCT were unable to develop equipment suitable for continuous operation and demonstration of the process in the field was not attempted. The significant achievements of the research area: Bench-scale batch results using carbon dioxide indicate >40% of the feed water to the hydrate formation reactor was converted to hydrate in a single pass; The batch results also indicate >23% of the feed water to the hydrate formation reactor (>50% of the hydrate formed) was converted to purified water of a quality suitable for discharge; Continuous discharge and collection of hydrates was achieved at atmospheric pressure. Continuous hydrate formation and collection at atmospheric conditions was the most significant achievement and preliminary economics indicate that if the unit could be made operable, it is potentially economic. However, the inability to continuously separate the hydrate melt fraction left the concept not ready for field demonstration and the project was terminated after Phase Two research.

01 COAL, LIGNITE, AND PEAT↗

Final Technical Report for EE0006091: H2Pump Hydrogen Recycling System Demonstration

The objective of this project is to demonstrate the product readiness and to quantify the benefits and customer value proposition of H2Pump’s Hydrogen Recycling System (HRS-100™) by installing and analyzing the operation of multiple prototype 100-kg per day systems in real world customer locations. The data gathered will be used to measure reliability, demonstrate the value proposition to customers, and validate our business model. H2Pump will install, track and report multiple field demonstration systems in industrial heat treating and semi-conductor applications. The customer demonstrations will be used to develop case studies and showcase the benefits of the technology to drive market adoption.

08 HYDROGEN↗

Wide Band-Gap Semiconductor Based Power Electronics for Energy Efficiency

Recent advances in wide band-gap (WBG) semiconductor materials, such as silicon carbide (SiC) and gallium nitride (GaN) are enabling a new generation of power semiconductor devices that far exceed the performance of silicon-based devices. Past ARPA-E programs (ADEPT, Solar ADEPT, and SWITCHES) have enabled innovations throughout the power electronics value chain, especially in the area of WBG semiconductors. The two recently launched programs by ARPA-E (CIRCUITS and PNDIODES) continue to investigate the use of WBG semiconductors in power electronics. From materials and devices to modules and circuits to application-ready systems integration, ARPA-E projects have demonstrated the potential of WBG semiconductors to lower the cost of high-efficiency power electronics to enable broad adoption in energy applications.