Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Maui Smart Grid Demonstration Project Managing Distribution System Resources for Improved Service Quality and Reliability, Transmission Congestion Relief, and Grid Support Functions

The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Hanford Tank Supernatant Availability for Technetium Management Project Studies in FY16

This report examines the need for actual Hanford tank waste solutions to support tasks in the Technetium Management Program in fiscal year (FY) 2016. One key need is to identify both samples where a majority of the soluble technetium is present as pertechnetate and samples where it is not. The total amount of tank supernatant needed from any given tank waste supernatant was determined by polling the tasks leaders for their technology testing needs in FY16 and then arbitrarily ascribing a 10% process loss associated with consolidation and the Cs-137 removal needed to reduce the dose to a level suitable for testing in radiological fumehoods. These polling results identified a need for approximately 2.1 to 3.6 kg of any particular targeted Hanford tank waste supernatant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BETO 2021 Peer Review - Task X- Project Management

This presentation serves as the peer review requirement for FCIC Task X. It covers structure, approach, impact, and accomplishments. The project will be scored by a peer review panel based on the presentation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DBMS as a Tool for Project Management

Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

Linder, H.↗

Conclusions of A Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed By the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation. Recently, the Space Radiation Element was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross Risk Integration Projects (CRIP). CRIP serves three broad purposes: Services: Generate samples/data or manage the receipt, inventory, archive and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities – includes NASA Omics Archive (NOA) project and various human and animal sample repositories. Method Development: Identify and evaluate, new-to-NASA research or analysis methods or techniques – includes TRRaC (Translational Radiation Research and Countermeasures) Project. Enabling Capabilities: Demonstrate real world application by adapting, adopting and/or developing capabilities to benefit crew health & performance and improve risk – includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion, limitations of current approaches, and incorporation of novel experimental strategies and other innovative techniques. Here a summary and lessons learned from the SRE-sponsored mini-TIM titled “Space Radiation Cross Risk Integrations Projects” at HRP IWS 2024 will be communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work This poster presents the outcomes of the session along with proposed future workshops and other SRE initiatives.

Janapriya Saha↗

Conclusions of a Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed by the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation that include risks of carcinogenesis, cardiovascular disease, and central nervous system decrements. Recently, the SRE was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross-Risk Integration Projects (CRIP). CRIP serves 3 broad purposes: - Services: Generate samples and data and manage the receipt, inventory, archive, and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities—includes NASA Omics Archive project and various human and animal sample repositories. - Method Development: Identify and evaluate new-to-NASA research or analysis methods or techniques that could fundamentally improve existing or planned research efforts—includes the Translational Radiation Research and Countermeasures Project. - Enabling Capabilities: Demonstrate real-world application by adapting, adopting, and/or developing capabilities to benefit crew health and performance and improve risk mitigation—includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion of results, limitations of current approaches, and incorporation of novel experimental strategies, model systems, and other innovative techniques. Here, a summary of the studies presented at the SRE-sponsored mini-TIM at the HRP IWS along with the goals and objectives of the CRIP projects is communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work, some of which are funded under CRIP by the Space Radiation Element.

Janapriya Saha↗

Project management - Factors leading to success or failure

This paper presents initial findings of a study designed to detail the relationships among situational, structural, and process variables as they relate to project effectiveness. In the paper, emphasis is placed on delineating those variables which tend to improve and those which tend to impede project effectiveness.

Kelley, A. J.↗

How Formal Methods Impels Discovery: A Short History of an Air Traffic Management Project

In this paper we describe a process of algorithmic discovery that was driven by our goal of achieving complete, mechanically verified algorithms that compute conflict prevention bands for use in en route air traffic management. The algorithms were originally defined in the PVS specification language and subsequently have been implemented in Java and C++. We do not present the proofs in this paper: instead, we describe the process of discovery and the key ideas that enabled the final formal proof of correctness

Butler, Ricky W.↗

Project Management of the Capsule Parachute Assembly System (CPAS)

Since the time of contract award of the Orion Crew Exploration Vehicle in 2006, NASA has spearheaded the design, development, test and evaluation of the Orion aerodynamic decelerator system through a Government Furnished Equipment project in the Engineering Directorate of the Johnson Space Center. This paper will describe the Project structure and organization, the interfaces to the major stakeholders, the processes applied, and a few major budget, schedule and technical challenges overcome.

Johnson, Chris J.↗

WISE: Automated support for software project management and measurement

One important aspect of software development and IV&V is measurement. Unless a software development effort is measured in some way, it is difficult to judge the effectiveness of current efforts and predict future performances. Collection of metrics and adherence to a process are difficult tasks in a software project. Change activity is a powerful indicator of project status. Automated systems that can handle change requests, issues, and other process documents provide an excellent platform for tracking the status of the project. A World Wide Web based architecture is developed for (a) making metrics collection an implicit part of the software process, (b) providing metric analysis dynamically, (c) supporting automated tools that can complement current practices of in-process improvement, and (d) overcoming geographical barrier. An operational system (WISE) instantiates this architecture allowing for the improvement of software process in a realistic environment. The tool tracks issues in software development process, provides informal communication between the users with different roles, supports to-do lists (TDL), and helps in software process improvement. WISE minimizes the time devoted to metrics collection, analysis, and captures software change data. Automated tools like WISE focus on understanding and managing the software process. The goal is improvement through measurement.

Ramakrishnan, Sudhakar↗

The work breakdown structure in software project management

A work breakdown structure (WBS) is defined as an enumeration of all work activities in hierarchic refinement of detail which organizes work to be done into short manageable tasks with quantifiable inputs, outputs, schedules, and assigned responsibilities. Some of the characteristics and benefits of the WBS are reviewed, and ways in which these can be developed and applied in software implementation projects are discussed. Although the material is oriented principally toward new-software production tasks, many of the concepts are applicable to continuing maintenance and operations tasks.

Tausworthe, R. C.↗

AgRISTARS: Foreign commodity production forecasting. Minutes of the annual formal project manager's review, including preliminary technical review reports of FY80 experiments

The U.S./Canada wheat/barley exploratory experiment is discussed with emphasis on labeling, machine processing using P1A, and the crop calendar. Classification and the simulated aggregation test used in the U.S. corn/soybean exploratory experiment are also considered. Topics covered regarding the foreign commodity production forecasting project include: (1) the acquisition, handling, and processing of both U.S. and foreign agricultural data, as well as meteorological data. The accuracy assessment methodology, multicrop sampling and aggregation technology development, frame development, the yield project interface, and classification for area estimation are also examined.

Source record↗

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

Project Management Plan/Progress Report: UT/GTKS Training Program Development for Commercial Building Operators (Final Report)

Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗