Search NASA⌕ Search

SEARCH · Search NASA

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The NASA Bed Rest Project

NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation strategy, address Project deliverables, schedules and provide a status of bed rest campaigns presently underway.

Rhodes, Bradley↗

Guidance and Control Software Project Data - Volume 2: Development Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

Hayhurst, Kelly J.↗

The Tailoring of Traditional Systems Engineering for the Morpheus Project

NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a LOX/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. The team has produced innovative ways to create an infrastructure and approach that would challenge existing systems engineering processes while still enabling successful implementation of the current Morpheus Project. This paper describes the tailored systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in FY11. Lessons learned from these trials have the potential to be scaled up and improve efficiency on a larger projects or programs.

Devolites, Jennifer L.↗

Carbon-Temperature-Water Change Analysis for Peanut Production Under Climate Change: A Prototype for the AgMIP Coordinated Climate-Crop Modeling Project (C3MP)

Climate change is projected to push the limits of cropping systems and has the potential to disrupt the agricultural sector from local to global scales. This article introduces the Coordinated Climate-Crop Modeling Project (C3MP), an initiative of the Agricultural Model Intercomparison and Improvement Project (AgMIP) to engage a global network of crop modelers to explore the impacts of climate change via an investigation of crop responses to changes in carbon dioxide concentration ([CO2]), temperature, and water. As a demonstration of the C3MP protocols and enabled analyses, we apply the Decision Support System for Agrotechnology Transfer (DSSAT) CROPGRO-Peanut crop model for Henry County, Alabama, to evaluate responses to the range of plausible [CO2], temperature changes, and precipitation changes projected by climate models out to the end of the 21st century. These sensitivity tests are used to derive crop model emulators that estimate changes in mean yield and the coefficient of variation for seasonal yields across a broad range of climate conditions, reproducing mean yields from sensitivity test simulations with deviations of ca. 2% for rain-fed conditions. We apply these statistical emulators to investigate how peanuts respond to projections from various global climate models, time periods, and emissions scenarios, finding a robust projection of modest (<10%) median yield losses in the middle of the 21st century accelerating to more severe (>20%) losses and larger uncertainty at the end of the century under the more severe representative concentration pathway (RCP8.5). This projection is not substantially altered by the selection of the AgMERRA global gridded climate dataset rather than the local historical observations, differences between the Third and Fifth Coupled Model Intercomparison Project (CMIP3 and CMIP5), or the use of the delta method of climate impacts analysis rather than the C3MP impacts response surface and emulator approach.

climate change↗

Lessons Learned from the Development and Implementation of the Atmosphere Resource Recovery and Environmental Monitoring Project

The Advanced Exploration Systems (AES) Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) Project have been developing atmosphere revitalization and environmental monitoring subsystem architectures suitable for enabling sustained crewed exploration missions beyond low Earth orbit (LEO). Using the International Space Station state-of-the-art (SOA) as the technical basis, the ARREM Project has contributed to technical advances that improve affordability, reliability, and functional efficiency while reducing dependence on a ground-based logistics resupply model. Functional demonstrations have merged new process technologies and concepts with existing ISS developmental hardware and operate them in a controlled environment simulating various crew metabolic loads. The ARREM Project's strengths include access to a full complement of existing developmental hardware that perform all the core atmosphere revitalization functions, unique testing facilities to evaluate subsystem performance, and a coordinated partnering effort among six NASA field centers and industry partners to provide the innovative expertise necessary to succeed. A project overview is provided and the project management strategies that have enabled a multidiscipinary engineering team to work efficiently across project, NASA field center, and industry boundaries to achieve the project's technical goals are discussed. Lessons learned and best practices relating to the project are presented and discussed.

Roman, Monsi C.↗

Probabilistic 21st and 22nd Century Sea-Level Projections at a Global Network of Tide-Gauge Sites

Sea-level rise due to both climate change and non-climatic factors threatens coastal settlements, infrastructure, and ecosystems. Projections of mean global sea-level (GSL) rise provide insufficient information to plan adaptive responses; local decisions require local projections that accommodate different risk tolerances and time frames and that can be linked to storm surge projections. Here we present a global set of local sea-level (LSL) projections to inform decisions on timescales ranging from the coming decades through the 22nd century. We provide complete probability distributions, informed by a combination of expert community assessment, expert elicitation, and process modeling. Between the years 2000 and 2100, we project a very likely (90% probability) GSL rise of 0.5–1.2 m under representative concentration pathway (RCP) 8.5, 0.4–0.9 m under RCP 4.5, and 0.3–0.8 m under RCP 2.6. Site-to-site differences in LSL projections are due to varying non-climatic background uplift or subsidence, oceanographic effects, and spatially variable responses of the geoid and the lithosphere to shrinking land ice. The Antarctic ice sheet (AIS) constitutes a growing share of variance in GSL and LSL projections. In the global average and at many locations, it is the dominant source of variance in late 21st century projections, though at some sites oceanographic processes contribute the largest share throughout the century. LSL rise dramatically reshapes flood risk, greatly increasing the expected number of “1-in-10” and “1-in-100” year events.

sea level↗

The Revolutionary Vertical Lift Technology (RVLT) Project

The Revolutionary Vertical Lift Technology (RVLT) Project is one of six projects in the Advanced Air Vehicles Program (AAVP) of the NASA Aeronautics Research Mission Directorate. The overarching goal of the RVLT Project is to develop and validate tools, technologies, and concepts to overcome key barriers for vertical lift vehicles. The project vision is to enable the next generation of vertical lift vehicles with aggressive goals for efficiency, noise, and emissions, to expand current capabilities and develop new commercial markets. The RVLT Project invests in technologies that support conventional, non-conventional, and emerging vertical-lift aircraft in the very light to heavy vehicle classes. Research areas include acoustic, aeromechanics, drive systems, engines, icing, hybrid-electric systems, impact dynamics, experimental techniques, computational methods, and conceptual design. The project research is executed at NASA Ames, Glenn, and Langley Research Centers; the research extensively leverages partnerships with the US Army, the Federal Aviation Administration, industry, and academia. The primary facilities used by the project for testing of vertical-lift technologies include the 14- by 22-Ft Wind Tunnel, Icing Research Tunnel, National Full-Scale Aerodynamics Complex, 7- by 10-Ft Wind Tunnel, Rotor Test Cell, Landing and Impact Research facility, Compressor Test Facility, Drive System Test Facilities, Transonic Turbine Blade Cascade Facility, Vertical Motion Simulator, Mobile Acoustic Facility, Exterior Effects Synthesis and Simulation Lab, and the NASA Advanced Supercomputing Complex. To learn more about the RVLT Project, please stop by booth #1004 or visit their website at https://www.nasa.gov/aeroresearch/programs/aavp/rvlt.

NASA↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Use of Climate Change Projections for Resilience Planning in Rio de Janeiro, Brazil

In this study we use three different methodologies to document and compare temperature and precipitation projections for the city of Rio de Janeiro (RJ) over the 21st century. It aims to explore in what way the differences and similarities of those methodologies and their outcomes support the incorporation of climate risks in urban planning and improve effective urban climate change governance. We compared the projections for RJ from the Eta Regional Climate Model from the Brazilian National Institute for Space Research nested in two Hadley Center Global Climate Models (GCMs) (Eta-HadCM3 method and Eta-HadGEM2-ES method) and 33 GCMs from the Coupled Model Intercomparison Project Phase 5 multi-model dataset (Urban Climate Change Research Network - UCCRN method). The three methods showed increasing temperatures for RJ at the end of the century. Precipitation projections span a 13% decrease to a 12% increase when using the UCCRN method or are reduced between 0.4 and 0.5%, when using the Eta-HadGEM2-ES method. However, the middle range of the projections from UCCRN and Eta-HadGEM2-ES is similar. The three methods project an increase of warm days and nights and a decrease of cold days and nights. Nevertheless, although the directions of change are the same applying the three methods, the magnitude differs when considering warm and cold nights. Hence, city stakeholders are better informed when we apply different projection methods as it gives them the opportunity to consider the level of risk they are willing to bear in the future. We observed that defining climate change projections on the city scale based on clear communication and an interactive process between scientists and stakeholders can be used to inform citywide adaptation strategies and sector-specific uses, as well as promote urban climate risk governance.

urban governance and management↗

A New Vision and A More Rational Process Will Advance Space Life Support Through Better Projects

Many space life support assumptions are obviously mistaken but they are generally accepted because they mutually support each other and because they advance a mistaken futuristic vision of closed human ecosystems in space. Many projects have been mistakenly selected to increase life support system closure or reduce launch mass in order to implement this impractical vision. Project members rarely challenge their project’s assumptions and guiding vision. Systems engineering including cost, reliability, risk, and system trade-offs has been very strongly discouraged to prevent rational criticism of these dubious assumptions, the projects, and the ecosystem vision. A more realistic vision can define better near term life support goals and future aspirations that will improve mission support and increase public interest. Given more realistic goals, it will be possible to develop effective technical alternatives, use open rational project selection methods, conduct professional project management, and make swifter progress in the inevitable human advance into space. The current unworkable human space settlement scenario involves moon visits and permanent bases, zero gravity trips to Mars, Mars visits and bases, all leading to extensive human settlements on the moon and Mars. This is unrealistic because the moon and Mars have less than Earth normal gravity and high radiation that can seriously damage human health. A better alternative would use rotating space colonies that produce Earth gravity and are radiation shielded. The attractive fantasy of reproducing terrestrial ecology in space should be replaced by the idea of building a closed system based on advancing technology such as artificial photosynthesis. Past mistaken projects include growing plants for food to replicate terrestrial food sources, recovering small amounts of water from difficult to process waste to achieve high system closure, and using newly designed, lighter, but unreliable hardware to reduce launch mass. The political process supporting the false assumptions, projects, and vision has deliberately prevented the usual systems engineering and cost-benefit analysis. We are going to do much better.

Harry W. Jones↗

The Next Generation Radioisotope Thermoelectric Generator Project - Overview and Progress Status

The Next Generation Radioisotope Thermoelectric Generator (Next Gen RTG) Project is a spaceflight system project within NASA’s Radioisotope Power Systems (RPS) Program. The project, in partnership with the Idaho National Laboratory (INL) / Battelle Energy Alliance (BEA), will build and deliver an unfueled, flight qualified Radioisotope Thermoelectric Generator (RTG) system based on RPS Program needs. The Next Gen RTG Project aims to assure the availability of high-power, vacuum-rated RTGs to enable future deep space missions. The Project team is developing that capability through a multi-phase effort that leverages the heritage General Purpose Heat Source - RTG (GPHS-RTG) design and available legacy hardware. The Project’s primary aim is to re-establish the capability to manufacture a silicon germanium (SiGe) unicouple based thermoelectric converter and associated hardware with minimal changes to the heritage GPHS-RTG design. The project will also refurbish the GPHS-RTG Flight Unit #5 (F-5) located at INL and verify its compliance with heritage GPHS-RTG requirements. This paper will detail the project’s plans for the development of these systems. Management approaches, technical challenges, and risks will also be discussed.

Radioisotope↗

Going South: Warnings from the Largest Project Engineering Failure in Modern History

NASA’s successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America’s gift “for all Mankind.” NASA’s Artemis Program to return humanity to the Moon promises to again reveal America’s leadership in this field. In preparation for the initiation of Artemis and its predecessor project Constellation, NASA thoroughly examined space program precedents. There remains, however, another relevant precedent which has not been examined in this context. Though this project involved technology radically different from that managed by NASA, its scope and environment in many ways parallel NASA’s large programs. This project was initiated by a private sector team that had, ten years before, successfully completed an effort that, at a cost of $275 billion (in 2021 USD), had stimulated new technology, had brought economic growth, had established their country as the world leader in engineering innovation, and, though it was a commercial success, had been broadly accepted as their nation’s gift “to all Mankind.” The new project was inspired by popular belief that private capital could again be marshalled to enhance national prestige and make yet another major contribution to the progress of Humanity. This new effort was predicted to require eight years and $258 billion. However, after the passage of nine years, achievement of only 45% complete on the baseline design, and expenditures 96% beyond the baseline cost, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. While the private sector team that carried out this project was exceptionally well educated and experienced in the field, their efforts resulted in what remains (in terms of the money wasted) the largest project engineering failure in modern history. This paper examines what went wrong.

Project Management↗

The Importance of Internal Climate Variability in Climate Impact Projections

Uncertainty in climate projections is driven by three components: scenario uncertainty, intermodel uncertainty, and internal variability. Although socioeconomic climate impact studies increasingly take into account the first two components, little attention has been paid to the role of internal variability, although underestimating this uncertainty may lead to underestimating the socioeconomic costs of climate change. Using large ensembles from seven coupled general circulation models with a total of 414 model runs, we partition the climate uncertainty in classic dose–response models relating county-level corn yield, mortality, and per-capita gross domestic product to temperature in the continental United States. The partitioning of uncertainty depends on the time frame of projection, the impact model, and the geographic region. Internal variability represents more than 50% of the total climate uncertainty in certain projections, including mortality projections for the early 21st century, although its relative influence decreases over time. We recommend including uncertainty due to internal variability for many projections of temperature-driven impacts, including early-century and midcentury projections, projections in regions with high internal variability such as the Upper Midwest United States, and impacts driven by nonlinear relationships.

climate impacts↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗

Curvilinear projection developments

Gradient projection is a powerful algorithm for minimization of a function subject to constraints. Constraint nonlinearities hamper projection computations. The constraints must then be restored before another projection cycle. The restoration steps taken in the process of following nonlinear constraint surfaces can be used as a guide to the construction of a curve which more nearly follows the constraints than does the straight line in the projected gradient direction. This scheme, termed 'curvilinear projection', was explored in earlier research. The study presently reported carries out some computational experiments using a related version of the technique. Some other details of projection computations which turn out to be practically important are taken up: rules for updating the variable metric in projection when early termination of the one-dimensional search on constraint violation occurs, and active-constraint logic for screening inequalities that makes use of the Kuhn-Tucker necessary conditions.

Kelley, H. J.↗

Map projections for larger-scale mapping

For the U.S. Geological Survey maps at 1:1,000,000-scale and larger, the most common projections are conformal, such as the Transverse Mercator and Lambert Conformal Conic. Projections for these scales should treat the Earth as an ellipsoid. In addition, the USGS has conceived and designed some new projections, including the Space Oblique Mercator, the first map projection designed to permit low-distortion mapping of the Earth from satellite imagery, continuously following the groundtrack. The USGS has programmed nearly all pertinent projection equations for inverse and forward calculations. These are used to plot maps or to transform coordinates from one projection to another. The projections in current use are described.

Snyder, J. P.↗

Application of expert systems in project management decision aiding

The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

Harris, Regina↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗