At least 163 records · Page 9

Project Report for Cold Spray Phase 2 (Tasks 9-20)

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Solutions (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 57: US Nuclear Power Plant Waste Management - US LLW Disposal Issues

This panel focused on senior utility managers discussing specific disposal site issues with the disposal site operators. Representatives from each of the operating commercial disposal sites began by presenting an update of their facility, license, and waste acceptance criteria (WAC) followed by a panel discussion in response to audience questions. Panelists with presentations: Current and Emerging US NRC Regulatory Topics (Joe Weismann); WCS Update (Dan Burns); EnergySolutions Clive Facility Support for US LLW Disposal Issues (Vern C. Rogers)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Maturation of Hot Isostatic Pressing for Nuclear Waste Treatment - 20259

ANSTO is constructing a nuclear waste treatment facility for the immobilization of intermediate-level liquid waste (ILLW) from its nuclear medicine production [1]. This facility shall deploy ANSTO Synroc process technology that converts a liquid waste stream into a durable solid wasteform. Hot Isostatic pressing (HIP) shall be employed to consolidate the dry powdered waste effectively reducing the waste volume and immobilizing the waste components. This paper presents the technology maturation for HIP technology for utilisation in a nuclear waste treatment facility. The HIP has been designed to operate in a remote shielded enclosure, fully integrated with the front-end powder production. Attention has been given in the HIP system design to ensure that it can operate and be maintained to achieve the required production output of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 128: Best Practices in Project Communications

This panel focused on a sustainable, holistic and integrated approach to structure nuclear waste management, disposal and remediation decisions. This panel had participation from internal and external stakeholders and demonstrate use of tools and techniques to effectively communicate factors that inform decisions. The desired outcome was to effectively communicate how risk is evaluated at complex sites, highlight holistic site level approaches that are protective of human health and the environment, and incorporate policy and technical concerns related to achieving alternative end points. This discussion included existing decision-making tools in conjunction with case studies. Panelists with presentations: Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos National Laboratory (David Nickless); Best Practice In Project Communications (Alan Paulley); Stakeholder and Public Engagement (Mark Lesinski); Stakeholder Engaged Structured Decision Making (Kelly Black)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: US DOE Procurement Opportunities and End-State Contracting Model Status

This panel focused on DoE's procurement implementation strategy and planned activities for its first-tier contractors (Tier 1 procurements). This panel also focused on the implementation status of DoE's End State Contracting Model, which uses a single-award ID/IQ approach to give DOE flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their prospective on progress toward the implementation of this new approach, lessons learned and the path forward for upcoming opportunities utilizing this contracting model. Panelists with presentations: EFCOG (Billy Morrison); DOE Procurement Opportunities - 4 Ways for Small Business Participation (Anne Marie Bird); US DOE Procurement and Contracting Opportunities (Aaron Deckard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097C - Panel: Reuse of Federal Land on the Oak Ridge Reservation, TN (3/4) (R.16c)

This panel was to focus on what is being done to enable federal reuse across the DOE's Oak Ridge Reservation, including how the Community Reuse Organization of East Tennessee (CROET) plays a critical role, how the community is benefiting, and the experience of the private sector companies now occupying the site. The Panelists were to discuss how resources from the East Tennessee Technology Park (ETTP) are being transitioned to support cleanup efforts that enable critical NNSA and Office of Science missions. This session integrated with panel sessions 97A, 97B, and 97D. Panelists with presentations: Community Reuse Organization of East Tennessee (CROET) (Ryan Overton); Community Perspective (Ron Woody); ETTP Tenant Point of View (Bradley Spears); Enabling NNSA and Office of Science Missions (Stephen Phillips); Enabling Federal Land Reuse (David Adler)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Projects on RW Recycling from the French 'Investments for the Future' Program - 20023

The extent and duration of French dismantling operations require to anticipate at the earliest possible stage the management of the large volumes of radioactive waste that will be generated, and to engage collectively in sustainable innovation processes. To anticipate all constraints and requirements related to radioactive waste management and secure the long-term compatibility with waste disposals, the French State has decided to give to Andra, within the 'Investissements d'Avenir' program, an endowment to support innovation at all steps of radioactive waste life cycle with a special emphasis on the dismantling process. Currently, some 30 R and D projects dealing with the optimization of dismantling radioactive waste management are underway. They aim at providing strong innovations in terms of characterization, processing, conditioning and disposal of post dismantling radioactive waste. A specific focus will be made on those dealing with radioactive waste and radionuclides recycling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 1: WMS 2020 Plenary Session

The plenary panel focused on government and industry world leaders speaking on the pressing issues facing radioactive waste management in 2020 and beyond. Panelists included an OECD/ NEA representative for the international community, a Huntington Ingalls Industries representative for the commercial sector, and the US DOE Senior Advisor to the Under Secretary of Science representing DOE Environmental Management. Panelists with presentations: WM2020 Speech (Michael Lempke); Optimization: A Better Path toward Managing Nuclear Decommissioning and Legacies (William Magwood); Update On the DOE Environmental Management Program (William White)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investing in STEM Benefits Community, Company, and Industry - 20243

Like many organizations and groups, the Department of Energy Environmental Management program and the nuclear industry are facing an aging employee population and record numbers of employee retirements. This 'silver tsunami' of retirees means the industry as a whole is recruiting graduates at a fast pace. So, how do we ensure the nuclear industry has a robust pipeline of graduates with the necessary background? Fluor Idaho's investment in science, technology, engineering, and mathematics (STEM) education programs helps promote the next generation of technical professionals, benefiting both the company and the industry. Through community outreach initiatives and student mentoring programs, Fluor Idaho promotes kids' interest in STEM. The programs are designed to spark STEM interest in grade school and then foster and grow that interest through high school and higher education. After igniting student excitement about STEM topics in school, Fluor Idaho focuses on providing work-specific opportunities including mentoring and intern programs. These programs give students a better look at real-world job opportunities while still stimulating their interest in STEM. These programs ultimately provide career opportunities for the students and a pipeline of workers. Fluor Idaho's strategy for its summer interns has been to place students in a wide variety of projects - from the commissioning of a first-of-a-kind nuclear processing facility, to operating nuclear waste management facilities, to developing computer programs and applications - and give them responsibilities that make them feel like valued contributors. This approach has created a positive and rewarding summer-intern program experience for the students. Fluor Idaho's investment in its future today is reducing the knowledge gap - or cliff - that many contractors in the nuclear industry are facing. It's a worthwhile investment that is readily visible within its many cleanup projects. The next generation of technical professionals is making an impact now - benefiting both the company and the nuclear industry. This paper will review Fluor Idaho's programs, including STEM community outreach and education and mentoring programs. It will also present statistics about the reach of those programs and their successes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Material Balance Approaches for Hanford Direct-Feed Low Activity Waste Processing - 20022

The Hanford Site has accumulated millions of gallons of tank waste from reprocessing spent fuel to recover plutonium, uranium, cesium, and strontium. The supernatant from the accumulated tank waste will be treated using a Direct Feed Low-Activity Waste approach. The supernatant will be treated to remove solids and cesium in the Tank-Side Cesium Removal process in the Hanford tank farm, then vitrified in a semi-batch process in the Hanford Waste Treatment and Immobilization Plant (WTP). Currently, each batch of feed is sampled at three locations prior to being fed to the melter: the feed qualification tank in the Hanford tank farm as well as the concentrate receipt vessel (CRV) and melter feed preparation vessel (MFPV) in the WTP. The feed qualification sample is taken from a large batch of accumulated feed, only two to three samples are expected each year. Approximately 275 samples from the CRVs and 1100 samples from the MFPV are expected each year. An evaluation was performed to determine if a material balance based on the feed qualification sample could replace most of the sampling in the CRVs and MFPVs. The evaluation consisted of three elements: (1) determination of the practicality of using a material balance to estimate the stream composition of the CRV and MFPV contents, (2) evaluation of whether the material balance could be automated using the existing process control system, and (3) determination of the uncertainty in glass composition using the material balance approach. It is assumed that periodic sampling at the CRV and MFPV would be performed periodically to re-baseline the material balance, evaluations are in progress to determine the frequency of this periodic sampling. Process sample locations downstream of the melter were reviewed as well, but the partitioning of semi-volatile species in the melter was determined to preclude extending the material balance approach past the melter. It was determined that replacement of the CRV sample location was feasible and did not increase process uncertainty or significantly impact waste loading. Replacement of the MFPV sample was also determined to be feasible, but that measurement of the glass former chemical addition may be needed prior to addition of these chemicals to the MFPV. This measurement could be performed by an in situ laser-induced breakdown spectroscopy (LIBS) system. Limited tests were performed to evaluate LIBS for direct measurements of the low-activity waste melter feed. The use of a material balance would eliminate over 1200 samples each year if only 10% of the CRV and MFPV batches are sampled and could likely allow the WTP laboratory to operate on days only versus 24/7 operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration Test Report: Vacuum Thermal Desorption (VTD) Testing to Support West Area Waste Feed Test 2

Approximately 54 million gallons of radioactive and hazardous waste are stored in underground storage tanks at the U.S. Department of Energy’s (DOE’s) Hanford Site in southeastern Washington State. The Hanford Waste Treatment and Immobilization Plant (WTP) is being constructed to immobilize the waste in glass waste forms. The baseline configuration of the WTP includes a Pretreatment Facility to separate the wastes into a small volume of high-level waste (HLW) containing most of the radioactivity and a larger volume of low-activity waste (LAW) containing most of the non-radioactive chemicals. The HLW will be converted to glass in the HLW vitrification facility for ultimate disposal at a federal repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 133: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (R1.18)

This panel focused on post-closure impacts to the long-term site workforce and communities in DoE's approach to accelerated site cleanup and expedited reduction of long-term financial liabilities. At sites where Cold-War workers shifted from weapons production to the cleanup effort, a more holistic approach to the workforce transition Post-EM cleanup is needed. This holistic approach would include incentives for expedited closure, trade re-training, and a vision for future site commercial activities. The panel discussed the importance of the right workforce incentives that includes appropriate training for displaced workers so that they can be integrated into a next job. A key aspect of this discussion was to re-assess the current and future land use opportunities related to land re-use concepts. By re-arranging cleanup sequencing is it possible to divest land sooner than originally projected for productive commercial use hence reducing the DOE long-term liability and consequently increasing an economic soft landing for those Cold-War workers. Panelists with presentations: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (Sean Todd); Sustaining, Growing and Re-Developing DOD/DOD Facilities and Assets (Jonathan Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Treatment of Defense Waste Processing Facility Recycle via Reuse of Existing Liquid Waste Facilities - 20097

The Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) has been immobilizing high level waste since 1996. The chemical process within DWPF generates a large volume of condensate, which is recycled to the SRS H-Area Tank Farm. The recycle stream includes a small quantity of sludge solids, as well as soluble cesium that is volatilized during melter operation. The recycle waste is currently received into a large, underground waste tank that separates insoluble solids via decanting. The supernate is treated by an evaporator with a concentrate stream that is stored for future processing. The evaporator overheads are collected and sent to the Effluent Treatment Project (ETP) for final polishing and testing prior to discharge to local surface water. Recycle storage and treatment as described above complicates the overall mission within the tank farms, which are primarily engaged in waste retrieval and preparation activities that support sludge and salt disposition, as well as tank characterization and closure. The need to devote a portion of available storage space to recycle treatment limits operational flexibility, and ultimately the DWPF recycle stream must be diverted to fully close all the SRS waste tanks. An alternative treatment process is being explored to decouple the recycle stream from the tank farm. The proposed treatment process will accomplish solids separation via crossflow filtration and will utilize a wiped film evaporator to volume-reduce the filtrate stream. Evaporator overheads will continue to be further processed in ETP while the solids stream and evaporator concentrate stream will be returned for reprocessing with the DWPF and Salt Waste Processing Facility (SWPF). This process will utilize existing facilities within DWPF and the tank farm that were previously dedicated to Interim Salt Disposition (ISD), but no longer have an identified mission with the startup of SWPF. The reuse of these facilities will remove several constraints from the current Liquid Waste (LW) System Plan without expanding the current footprint of Department of Energy Environmental Management (EM) infrastructure within LW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 134: Stakeholder Involvement in Consolidated ISF Storage, Disposal, and Transportation Initiatives

Planning of activities related to waste storage, transportation, and disposal requires involvement and engagement on the parts of both regulators and stakeholders. There have been challenges felt by both parties, which has led to discussions about how to best proceed with projects not just from a technical perspective, but how to create better relationships between the general public and scientific community. This panel was designed to highlight lessons learned, best practices, and next steps in anticipated projects. This panel focused on the current efforts undertaken by initiatives to involve stakeholders for the success of ISF Storage and Disposal facilities. For example, two license applications were submitted to the US NRC by two private entities - Interim Storage Partners (WCS, Inc, and Orano) and Holtec, Inc./ELLA - for consolidated ISF in West Texas and in NM (respectively). This panel discussed elements needed for success in engaging various stakeholders at all levels of the project life cycle, and can include lessons learned from previous projects. Panelists with presentations: Stakeholder Engagement in SNF Storage and Disposal (Miriam Juckett); Stakeholders, Siting and Nuclear Waste Disposal -Thoughts on a Path Forward (Jim Hamilton)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗