Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Automatic planning concept - An analysis of optimum scheduling

Study considers resource costs, mission constraints, and experiment results as linear functions, insofar as possible, in an effort to develop optimum scheduling by the use of linear programming. It involves a mathematical approach in which a number of constraints are considered operative.

Rebelein, P. R.↗

Updated System-Availability and Resource-Allocation Program

A second version of the Availability, Cost and Resource Allocation (ACARA) computer program has become available. The first version was reported in an earlier tech brief. To recapitulate: ACARA analyzes the availability, mean-time-between-failures of components, life-cycle costs, and scheduling of resources of a complex system of equipment. ACARA uses a statistical Monte Carlo method to simulate the failure and repair of components while complying with user-specified constraints on spare parts and resources. ACARA evaluates the performance of the system on the basis of a mathematical model developed from a block-diagram representation. The previous version utilized the MS-DOS operating system and could not be run by use of the most recent versions of the Windows operating system. The current version incorporates the algorithms of the previous version but is compatible with Windows and utilizes menus and a file-management approach typical of Windows-based software.

Viterna, Larry↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

Scaling Optimal Allocation of Cloud Resources Using Lagrange Relaxation

The rapid growth of Cloud Computing (CC) has increased the variety of computing resources, storage, and communication services that pose significant new challenges for the efficient use of cloud resources. The cost-efficient allocation of cloud resources has become a decisive premise for the adoption of CC services. The cost-efficient selection and scheduling of these resources to meet the demands of a scientific workflow is a challenging problem that is exacerbated by the inclusion of multiple CC providers. In this paper, we present a novel strategy for the cost-efficient selection of CC resources using Lagrange relaxation. Our approach is based on preselection of resources and demand decomposition to create a series of smaller sub-problems, which allow the estimation of the best cost-structures and selection of CC service providers for a subset of the time period of the planning horizon. Decomposition of the demand is achieved through the boundary analysis of a continuous relaxation of the problem. Using the metrics defined in terms of the cost and time of completion, we demonstrate excellent performance in relation to optimal solutions. Our method reduced the computational time from hours to seconds for a representative 36-month problem and provided high-quality solutions (< 0.05% relative error). Given the importance of selecting resources and scheduling complex scientific workflows, we believe that this novel strategy will be beneficial for many researchers and users of cloud computing resources.

De La Torre, Luis↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

NLR HPC Kestrel Jobs Data

Overview: Anonymized job-level records from the Kestrel HPC system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, utilization, energy estimates, and efficiency metrics. Sensitive fields (user, account, job name, submit line, working directory, submit script, and job type) are replaced with 7-character cryptographic hashes. System & Timeframe: Kestrel is located at the NLR campus. Standard compute nodes have 104 cores and 256 GB RAM; bigmem nodes have 2,000 GB. GPU nodes (gpu-h100 partition) use NVIDIA H100 GPUs. Data covers jobs submitted August 2023 through December 2025. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.kestrel.job-anon.zip — Anonymized job records (Hive-partitioned Parquet) datacard.md — Full dataset documentation ~11 million rows, 50 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct with timezone-aware export (SLURM_TIME_FORMAT="%Y-%m-%dT%H:%M:%S%z"), loaded into PostgreSQL. Calculated columns updated via database triggers and batch functions. All timestamps use timestamptz and correctly handle DST transitions. Preprocessing: Anonymization of name, user, account, submit_line, work_dir, submit_script, and job_type via 7-char hex hashes Derived columns: queue_wait, cpu_eff, max/min/avg_mem_eff, energy estimates Simplified job state mapping (e.g., "CANCELLED by 132357" → "CANCELLED") Boolean flags: python_job, reframe_job Temporal decomposition: year, month, day, day_of_week, hour, minute from submit_time Shared node tracking: shared_job_count, nodes_shared, jobs_shared Key Variables: Scheduling: job_id, partition, state_simple, submit_time, start_time, end_time, queue_wait Resources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max/min/avg_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, consumed_energy_raw_joules, consumed_energy_raw_watt_hours Sharing: shared_job_count, nodes_shared, jobs_shared Partitions: short, standard, debug, gpu-h100 Job States: CANCELLED, COMPLETED, FAILED, PENDING, RUNNING QoS Levels: normal, high Important Notes: Timestamps include timezone offsets; DST transitions are handled correctly, though adding intervals across DST boundaries requires offset adjustment shared_job_count reflects physical node co-residency, not use of the shared partition Job step records and raw Slurm JSONB fields are excluded Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

Real-Time Charging Strategies for an Electric Vehicle Aggregator to Provide Ancillary Services

Real-time charging strategies, in the context of vehicle to grid (V2G) technology, are needed to enable the use of electric vehicle (EV) fleets batteries to provide ancillary services (AS). Here, we develop tools to manage charging and discharging in a fleet to track an Automatic Generation Control (AGC) signal when aggregated. We also propose a real-time controller that considers bidirectional charging efficiency and extend it to study the effect of looking ahead when implementing Model Predictive Control (MPC). Simulations show that the controller improves tracking error as compared with benchmark scheduling algorithms, as well as regulation capacity and battery cycling.

33 ADVANCED PROPULSION SYSTEMS↗

Software for Analyzing Laminar-to-Turbulent Flow Transitions

Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software. This is achieved by combining two prior programs in an innovative manner

Chang, Chau-Lyan↗

Software for Optimizing Quality Assurance of Other Software

Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software.

Feather, Martin↗

The Nature of Procedural Interrupts in Ground Operations in Aerospace Systems

This study proposes a methodology for characterizing the causal context and consequences of procedural interrupts in ground operations tasks. Behavioral science researchers observed 26 tasks at NASA's Kennedy Space Center. From these tasks, 81 procedural interrupts were identified and coded for the following information: source of the interrupt, circumstances surrounding the interrupt, and consequences of the interrupt. We found that more interrupts were equipment or personnel-related than procedure-related. More interrupts were due to unavailable resources or resources being incorrect than resources being inaccessible, and most interrupts resulted in some action being taken. Variation in duration of procedural interrupts across causal categories was also examined. The characterization process helps to identify those interrupts that are disruptive, those that cannot be avoided, and those that may have been prevented through better planning or scheduling of resources. Implications for the use of the methodology and suggestions for further research are discussed.

Irwin, Cheryl M.↗

Estimating The Cost Of Developing Software

Software Cost Estimation Model program, SOFTCOST, developed to provide consistent automated resource-and-schedule mathematical model more formalized than guesswork model. Combines several software-cost models found in open literature into one comprehensive set of algorithms compensating for nearly 50 implementation factors relative to size of task, inherited baseline, organizational and system environment, and difficulty of task. Produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Written in Microsoft BASIC.

Tausworthe, Robert C.↗

DSN Scheduling Engine

The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

Clement, Bradley↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.↗

Using Apex To Construct CPM-GOMS Models

process for automatically generating computational models of human/computer interactions as well as graphical and textual representations of the models has been built on the conceptual foundation of a method known in the art as CPM-GOMS. This method is so named because it combines (1) the task decomposition of analysis according to an underlying method known in the art as the goals, operators, methods, and selection (GOMS) method with (2) a model of human resource usage at the level of cognitive, perceptual, and motor (CPM) operations. CPM-GOMS models have made accurate predictions about behaviors of skilled computer users in routine tasks, but heretofore, such models have been generated in a tedious, error-prone manual process. In the present process, CPM-GOMS models are generated automatically from a hierarchical task decomposition expressed by use of a computer program, known as Apex, designed previously to be used to model human behavior in complex, dynamic tasks. An inherent capability of Apex for scheduling of resources automates the difficult task of interleaving the cognitive, perceptual, and motor resources that underlie common task operators (e.g., move and click mouse). The user interface of Apex automatically generates Program Evaluation Review Technique (PERT) charts, which enable modelers to visualize the complex parallel behavior represented by a model. Because interleaving and the generation of displays to aid visualization are automated, it is now feasible to construct arbitrarily long sequences of behaviors. The process was tested by using Apex to create a CPM-GOMS model of a relatively simple human/computer-interaction task and comparing the time predictions of the model and measurements of the times taken by human users in performing the various steps of the task. The task was to withdraw $80 in cash from an automated teller machine (ATM). For the test, a Visual Basic mockup of an ATM was created, with a provision for input from (and measurement of the performance of) the user via a mouse. The times predicted by the automatically generated model turned out to approximate the measured times fairly well (see figure). While these results are promising, there is need for further development of the process. Moreover, it will also be necessary to test other, more complex models: The actions required of the user in the ATM task are too sequential to involve substantial parallelism and interleaving and, hence, do not serve as an adequate test of the unique strength of CPM-GOMS models to accommodate parallelism and interleaving.

John, Bonnie↗

A BI-LEVEL APPROACH TO FUTURE POWER SYSTEM CO-OPTIMIZATION WITH HIGH PENETRATION OF RENEWABLE ENERGY AND RESPONSIVE DEMAND

Electricity generation accounts for nearly half of the total CO2 emissions in the United States. For this reason, the development and integration of renewable resources will play an essential role in achieving the societal objective of mitigating climate change through reduction of greenhouse gas emissions. In conjunction with the environmental benefits of renewable energy, the most common renewable sources, such as wind and solar, also increase the uncertainties surrounding generation in power systems, which adds significant challenges to the system operation and planning. The uncertainties and forecasting errors surrounding renewable generation are normally addressed through the use of reserves from traditional generators. At greater levels of renewable penetration, sufficient generator reserves may not be available or economically viable. In contrast, the promise of demand-side resources in this arena lies in the spatially widespread availability, rapid response potential, and lower cost of features that already exist in the system. However, the challenge of responsive demand arises from the need to understand, manage, and incentivize a very large number of resources to participate effectively in efficient operation of the complex power system. Since demand response comes from the distribution system, microgrids as the basic building blocks of future distribution systems will be a critical environment for the study of demand response. To support integration of microgrids with flexible loads in future power systems, the operational mode of power systems will need to evolve. Therefore, it is going to be critical to have new and efficient co-optimization methods for coordination of the various power market participants and the scheduling of resources in the power systems of the future. Motivated by the rapid increase in renewable penetration, the need for effective demand response programs, and a changing system structure, this dissertation seeks to define a new strategy that supports co-optimization of various participants in power systems with emphasis on high renewable penetration and demand response. This strategy has three components; 1) an exploration of the capabilities of different types of demand response programs in a microgrid, 2) development and implementation of a bi-level framework for co-optimization of the main grid with high renewable penetration and a microgrid with demand response capabilities, and 3) expansion of the bi-level framework from a microgrid to a general distribution system to explore the advantages of the bi-level co-optimization approach over the traditional optimization approach. Conclusions of this work illustrate that the stochastic rolling horizon approach could effectively manage the operation of a microgrid with various demand response programs. In addition, the bi-level approach is a promising co-optimization framework for the transmission and distribution levels that could increase system renewable penetration and reduce operation costs. Compared to the traditional framework, the bi-level framework yields more equitable cost sharing patterns among the market participants as well as better support for the power system evolution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗