Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Guidelines and Suggestions for Balloon Gondola Design

This paper discusses the current gondola design requirements for the Columbia Scientific Balloon Facility (CSBF). The CSBF is responsible for launching and supporting balloon borne scientific instruments and has some current updated guidelines that will be discussed in this presentation. As the sophistication of Payload systems have increased in size and complexity new guidelines have been implemented in order to make these instruments stay within the acceptable launch risks. Additionally, there is a requirement to submit a proper stress analysis report that states the flight design requirements have been met. Suggestions are discussed in this presentation that establish the proper guidelines to submit these.

Guidelines for Balloon Gondola Design↗

Radiation Hardness Assurance (RHA): Challenges and New Considerations

Use of commercial-off-the-shelf (COTS) components and emerging technologies often require space flight missions to accept elevated risk. The Radiation Hardness Assurance (RHA) flow includes environment definition, hazard evaluation, requirements definition, evaluation of design, and design trades to accommodate and mitigate the risk a project or program takes. Depending on the mission profile and environment, different missions may not necessarily benefit from the same risk reduction efforts or cost reduction attempts. While this poses challenges for the radiation engineer, it also presents opportunities to tailor the RHA flow to minimize risk based on the environment or design criticality while remaining within budget. This presentation will focus on an approach to RHA amidst the present challenges, using the same RHA flow as in the past, with examples from recent radiation test results. The current challenges and the types of risk will be identified. How these risks drive requirements development and realization will be explained with examples of device results and data for single event effects (SEE) and in one case total ionizing dose (TID).

Radiation Hardness Assurance (RHA); Risk Managemen↗

SLS-SPEC-159 Cross-Program Design Specification for Natural Environments (DSNE) Revision E

The DSNE completes environment-related specifications for architecture, system-level, and lower-tier documents by specifying the ranges of environmental conditions that must be accounted for by NASA ESD Programs. To assure clarity and consistency, and to prevent requirements documents from becoming cluttered with extensive amounts of technical material, natural environment specifications have been compiled into this document. The intent is to keep a unified specification for natural environments that each Program calls out for appropriate application. This document defines the natural environments parameter limits (maximum and minimum values, energy spectra, or precise model inputs, assumptions, model options, etc.), for all ESD Programs. These environments are developed by the NASA Marshall Space Flight Center (MSFC) Natural Environments Branch (MSFC organization code: EV44). Many of the parameter limits are based on experience with previous programs, such as the Space Shuttle Program. The parameter limits contain no margin and are meant to be evaluated individually to ensure they are reasonable (i.e., do not apply unrealistic extreme-on-extreme conditions). The natural environments specifications in this document should be accounted for by robust design of the flight vehicle and support systems. However, it is understood that in some cases the Programs will find it more effective to account for portions of the environment ranges by operational mitigation or acceptance of risk in accordance with an appropriate program risk management plan and/or hazard analysis process. The DSNE is not intended as a definition of operational models or operational constraints, nor is it adequate, alone, for ground facilities which may have additional requirements (for example, building codes and local environmental constraints). "Natural environments," as the term is used here, refers to the environments that are not the result of intended human activity or intervention. It consists of a variety of external environmental factors (most of natural origin and a few of human origin) which impose restrictions or otherwise impact the development or operation of flight vehicles and destination surface systems.

Roberts, Barry C.↗

Improved Calibration through SMAP RFI Change Detection

Anthropogenic Radio-Frequency Interference (RFI) drove both the SMAP (Soil Moisture Active Passive) microwave radiometer hardware and Level 1 science algorithm designs to use new technology and techniques for the first time on a spaceflight project. Care was taken to provide special features allowing the detection and removal of harmful interference in order to meet the error budget. Nonetheless, the project accepted a risk that RFI and its mitigation would exceed the 1.3-K error budget. Thus, RFI will likely remain a challenge afterwards due to its changing and uncertain nature. To address the challenge, we seek to answer the following questions: How does RFI evolve over the SMAP lifetime? What calibration error does the changing RFI environment cause? Can time series information be exploited to reduce these errors and improve calibration for all science products reliant upon SMAP radiometer data? In this talk, we address the first question.

Passive L-band radiometer↗

Realistic Covariance Generation for the GPM Spacecraft

A covariance realism process for NASA's Global Precipitation Measurement (GPM) spacecraft is detailed. The GPM spacecraft is in a low earth orbit, and performs collision avoidance maneuvers few times a year. Currently GPM is below the International Space Station (ISS). So, in addition to cataloged debris objects, GPM must contend with smallsat/cubesat objects that are deployed from the ISS. Both operational scenarios require complete knowledge of the expected GPM prediction errors as a function of time. In this study, we present a method for generating realistic predicted covariance that uses linear propagation of the covariance with the addition of process noise. Further analyses are presented for the process noise ''tuning'' that generates an inflation factor based on the observed error statistics of the predictive satellite trajectories when compared to the definitive ones. Different tuning strategies are considered and compared via a Goodness-of-Fit testing for the Gaussian properties of the scaled covariance. SpaceNav's realistic covariance generation approach takes into account the contribution of predicted maneuver errors in the increased propagation uncertainty. Corresponding maneuver uncertainty is injected into the state uncertainty, and is used within the collision avoidance process to determine the collision risk for close approach events that follow a maneuver. This is a critical step in the maneuver planning process that provides the satellite operator with an accurate quantification of the collision probability for planned maneuvers. Using this information, an informed decision can be made to proceed with a maneuver if the collision risk is acceptable. This approach is validated by Monte-Carlo simulations and results are presented.

spacecraft uncertainty propagation↗

Developments and activities in solar sail propulsion

NASA's drive to reduce mission costs and accept the risk of incorporating innovative, high payoff technologies into its missions while simultaneously undertaking ever more difficult missions has sparked a greatly renewed interest in solar sails. This paper summarizes these on-going developments in solar sails.

solar↗

Having a Come-Apart: Lessons Learned from Additively Manufactured Hardware Failures

NASA has been engaged with additively manufactured (AM) process and component development since the 2000’s. AM offers various technical advantages, such as enhanced hardware design complexity, part consolidation, and processing of novel alloys in addition to programmatic advantages for reduction in processing time and cost. The focus of much of the AM development at NASA has been to mature the various processes, characterize material properties, develop standards, produce demonstrator parts, and integrate AM hardware in liquid rocket engines. These aspects have been demonstrated through process and design iterations using a methodical characterization, test-fail-fix cycles, as well as application and dissemination of lessons learned. In addition to these fundamental demonstrations of the AM process and hardware development, alloys that provide performance advantages in the high temperature and high-pressure environments have been matured for use in rocket engines. These environments are challenging for any alloy and any design, and the AM process is required to fully meet the intended design requirements. The importance of proper AM process was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality resulted from an AM process issue. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. In part, such concerns motivate the AM certification approach that NASA has recently adopted in NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems”. This presentation provides an overview of the previously mentioned failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. The objective of this presentation is to provide awareness to the community working critical and non-critical AM components and the lessons learned on proper implementation of AM.

Additive Manufacturing↗

Metal Additive Manufacturing for Rocket Engines: Successes and Failures

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

L-PBF↗

Successes and Failures of Metal Additive Manufacturing for Rocket Engines

NASA has been developing additive manufacturing (AM) for various technical and programmatic advantages for complex rocket engine and aerospace components. This maturation has focused on various AM processes, new alloys, characterizing material properties, developing standards, producing demonstrator parts, and integrating AM hardware in liquid rocket engines through test-fail-fix cycles, as well as application and dissemination of lessons learned of the AM lifecycle. The importance of proper AM processing was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. This presentation provides an overview of the development failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. This presentation with provide critical awareness to the community lessons learned on proper implementation of AM.

Additive Manufacturing↗

How NASA Accounts for Weather Throughout Artemis Mission

Development and operations of NASA spacecraft and launch vehicles are influenced by the natural environment (i.e. weather) across all applicable mission phases. Defining the natural environments provides engineers the applicable factors, along with exposure ranges, that must be accounted for in the hardware design. Effects from exposure to these environments must be addressed through structural design of the hardware, mitigated through operational controls, or accepted as risk by the governing program. Managing and mitigating these environmental factors was crucial to ensure the safe and successful launch of the Space Launch System (SLS) rocket, the transit of the Multi-Purpose Crew Vehicle (MPCV) around the moon and the recovery of MPCV after landing off the California coast in November 2022. A summary of how the Artemis I mission accounts for both the terrestrial and space environments, as well as the impacts, will be provided.

Ryan K Decker↗

TBIRD, a rapid prototyping approach for design, assembly, and test of a LEO-to-ground lasercom CubeSat

The TeraByte InfraRed Delivery (TBIRD) system is a 3U payload on a 6U CubeSat launched in May 2022 which has now demonstrated space to ground links of >1 Terabyte (TB) per pass at a max data rate of 200Gbps. As a CubeSat mission, the development of the TBIRD payload was focused on low SWaP and a “rapid prototyping” approach which accepted higher risks to accelerate the schedule and reduce costs. The optomechanical design process followed standard in-house processes to develop a system that would be robust to LEO environmental loads, with a focus on the stability of the transmit (Tx) and receive (Rx) channel performance metrics. The driving requirement of maintaining 20μrad pointing error between the TX and Rx channels forced specific attention to thermal and mechanical load changes over operational conditions, which drove major design decisions. This paper describes some of engineering challenges overcome and approaches used to make TBIRD a successful program, as well as some of the tradeoffs of rapid prototyping precision optical payloads. TBIRD successfully met and exceeded the total downlink requirements listed above, with a bandwidth of 200Gbps and a total downlink of 4.8TB of information in a single pass.

TBIRD↗

Computing Risk of Pyrotechnic Devices Using Lot Acceptance Testing

This paper presents an application of statistical engineering to solve the problem of determining the effects of reducing test sample sizes and environment levels in lot acceptance testing (LAT) of ordnance devices used by NASA and DoD space systems. Unlike environmental testing of dedicated qualification hardware, ordnance devices have a test-like-you-fly exception and use lot acceptance sampling or LAT. LAT is performed by randomly selecting a predefined number of devices from an individual lot and exposing them to a more severe dynamic shock and vibration testing environments than flight (sometimes as high as 6 decibels over flight environments) and then performing a destructive test on the device. Recent trends have been suggested to reduce LAT costs by reducing environment test levels or the number of devices per LAT, or both. A method is given here to compute flight risk, so the proposed methods can be compared by subject matter experts to the baseline LAT methods. In addition, this method can be used to determine the best methods to include in future LAT standards for pyrotechnic devices.

Computing Risk↗

A Subjective Assessment of Alternative Mission Architecture Operations Concepts for the Human Exploration of Mars at NASA Using a Three-Dimensional Multi-Criteria Decision Making Model

The primary driver for developing missions to send humans to other planets is to generate significant scientific return. NASA plans human planetary explorations with an acceptable level of risk consistent with other manned operations. Space exploration risks can not be completely eliminated. Therefore, an acceptable level of cost, technical, safety, schedule, and political risks and benefits must be established for exploratory missions. This study uses a three-dimensional multi-criteria decision making model to identify the risks and benefits associated with three alternative mission architecture operations concepts for the human exploration of Mars identified by the Mission Operations Directorate at Johnson Space Center. The three alternatives considered in this study include split, combo lander, and dual scenarios. The model considers the seven phases of the mission including: 1) Earth Vicinity/Departure; 2) Mars Transfer; 3) Mars Arrival; 4) Planetary Surface; 5) Mars Vicinity/Departure; 6) Earth Transfer; and 7) Earth Arrival. Analytic Hierarchy Process (AHP) and subjective probability estimation are used to captures the experts belief concerning the risks and benefits of the three alternative scenarios through a series of sequential, rational, and analytical processes.

Tavana, Madjid↗

Method for Tracking and Communicating Aggregate Risk Through the Use of Model-Based Systems Engineering (MBSE) Tools

Large, complex projects can identify a significant number and variety of risks, throughout the project life cycle. These risks are analyzed, mitigated, closed or accepted as independent uncertainties. Once closed or accepted, it is easy for projects to lose awareness of their impact. In reality, each of these risks contributes some amount to the overall risk posture of the project. The ability to track and effectively communicate this aggregate risk has represented a challenge to project management. There have been previous attempts to create a schema to communicate the aggregate effect of risks, without notable success. Most of these attempts have centered on some additive metric derived from the scoring of likelihood and consequence values. This, in and of itself, is a logical approach, but all too often the scores were then aggregated to a level where all context was lost. One weakness has been a lack of attempt to create linkages or logical groups of the risks upon which useful aggregation could then occur. The overall move to model-based (systems) engineering (MBSE) has opened up a vast frontier of opportunities to better integrate all project data. MBSE provides an underlying layer that links data items to each other. Objectives link to requirements, which then link to functions, functions to physical architecture items, and so on, as far down as projects want to model. While it started with a focus on modeling requirements based on things like use cases, efforts are now underway to integrate safety and mission assurance (S&MA) information and analyses, such as risks. This effort, called Model Based Mission Assurance (MBMA), is yielding models that are more useful and are a more accurate representations of the systems. MBSE models, with this ability to link related items, provide a new means of tracking and communicating aggregate risks. In the proposed method, risks are added into the models as distinct items, having attributes that communicate a scoring derived from the likelihood and consequence values as charted on the standard NASA 5x5 risk matrix. Like earlier efforts, each box in the 5x5 has an associated scoring, which may include both a current score and potential post-mitigation/control score. The risk items are then linked to elements of the model, such as system objectives/goals, requirements, functions, or physical architecture items, with "Risk to" relationships. These risks will then be communicated by use of reports generated from the model, detailing all risks and/or hazards linked to model elements. These reports can include aggregate impacts, including a current scoring and potential future state scoring based on the planned mitigations and/or controls. These reports will show all risks, open, accepted, and closed, linked to project objectives or requirements. When run as part of an upcoming risk acceptance discussion, these reports will serve to remind the team of all previous risks that relate to the effected portion of the system. When included as part of periodic program or project reviews, risk reviews, and safety reviews, this method can improve the overall understanding of the system's true risk posture. This proposed method takes full advantage of the advances that modern modeling techniques provide, with a minimal investment of additional time. Utilizing the model environment also enables a near constant access to current state of aggregate risks.

model based mission assurance↗

Space Radiation Cancer Risks

Space radiation presents major challenges to astronauts on the International Space Station and for future missions to the Earth s moon or Mars. Methods used to project risks on Earth need to be modified because of the large uncertainties in projecting cancer risks from space radiation, and thus impact safety factors. We describe NASA s unique approach to radiation safety that applies uncertainty based criteria within the occupational health program for astronauts: The two terrestrial criteria of a point estimate of maximum acceptable level of risk and application of the principle of As Low As Reasonably Achievable (ALARA) are supplemented by a third requirement that protects against risk projection uncertainties using the upper 95% confidence level (CL) in the radiation cancer projection model. NASA s acceptable level of risk for ISS and their new lunar program have been set at the point-estimate of a 3-percent risk of exposure induced death (REID). Tissue-averaged organ dose-equivalents are combined with age at exposure and gender-dependent risk coefficients to project the cumulative occupational radiation risks incurred by astronauts. The 95% CL criteria in practice is a stronger criterion than ALARA, but not an absolute cut-off as is applied to a point projection of a 3% REID. We describe the most recent astronaut dose limits, and present a historical review of astronaut organ doses estimates from the Mercury through the current ISS program, and future projections for lunar and Mars missions. NASA s 95% CL criteria is linked to a vibrant ground based radiobiology program investigating the radiobiology of high-energy protons and heavy ions. The near-term goal of research is new knowledge leading to the reduction of uncertainties in projection models. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. The current model for projecting space radiation cancer risk relies on the three assumptions of linearity, additivity, and scaling along with the use of population averages. We describe uncertainty estimates for this model, and new experimental data that sheds light on the accuracy of the underlying assumptions. These methods make it possible to express risk management objectives in terms of quantitative metrics, i.e., the number of days in space without exceeding a given risk level within well defined confidence limits. The resulting methodology is applied to several human space exploration mission scenarios including lunar station, deep space outpost, and a Mars mission. Factors that dominate risk projection uncertainties and application of this approach to assess candidate mitigation approaches are described.

Cucinotta, Francis A.↗