Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPEARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

160 records · Page 9

NASA's Space Launch System: Opportunities for Small Satellites to Deep Space Destinations

The first flight of NASA's new exploration-class launch vehicle, the Space Launch System (SLS), will test a myriad of systems designed to enable the next generation of deep space human spaceflight, while also providing the rare opportunity for 13 6U CubeSat-class payloads to be deployed in several locations along the flight path. The first mission of SLS and NASA's new Orion crew vehicle, Exploration Mission-1 (EM-1), will launch from upgraded facilities at Kennedy Space Center no earlier than fiscal year 2020. The initial Block 1 configuration for EM-1 will be capable of lofting at least 26 metric tons (t) of payload to the moon, with propulsion supplied by twin five-segment solid rocket boosters, four RS-25 engines and an Interim Cryogenic Propulsion Stage (ICPS). SLS will send Orion into a distant retrograde lunar orbit, paving the way for future missions to cislunar space and eventually Mars. The multidisciplinary small satellites for EM-1 derive from NASA research, as well as from international partners, industry and academia. Research subjects for the various smallsats include the moon, sun and an asteroid. Science objectives vary from characterizing the effects of radiation on living organisms (yeast) to landing the smallest spacecraft yet on the moon to supporting space weather research. Some of the payloads are technology demonstrations that will pave the way for more ambitious future missions that will be deployed by the more powerful SLS Block 1B configuration.

Robinson, Kimberly F.↗

Space Launch System Artemis I CubeSats: SmallSat Vanguards of Exploration, Science and Technology

When NASA’s Space Launch System (SLS) rocket launches in 2021 with the Orion crew vehicle, it will lay the foundation for NASA’s goal of landing the first woman and the next man on the Moon as part of the Artemis program. This first flight—Artemis I—will also mark a milestone for smallsats. Thirteen6U CubeSats are manifested on the Artemis I flight, the first fleet of CubeSats carried as a ride share opportunity to deep space.(NASA’s first CubeSats to deep space, the twin Mars Cube One [MarCO] spacecraft, were an integral part of the InSight Mars lander mission). The Artemis I CubeSat manifest represents a diverse collection of smallsats performing an array of science missions and technology demonstrations. Payloads from NASA, international partners, academia and industry will execute a variety of experiments. Several smallsats will perform lunar-focused missions that may return data that addresses Strategic Knowledge Gaps (SKGs) in the agency’s lunar exploration program. Indeed, the Artemis I CubeSats will be in the vanguard of the agency’s 21st-century lunar program. The Artemis I missions will produce data to support space radiation awareness,crewed landings and in-situ resource utilization, helping to support a sustained human lunar presence. Several of the Artemis I CubeSats are demonstrating new technologies, including propulsion capabilities. Among the Artemis I CubeSats are three selected through NASA’s Cube Quest Challenge, part of the Centennial Challenges program. These three missions will compete for prize money while meeting specific technical development goals. Payloads from the Japanese and Italian space agencies provide an early opportunity for international involvement in the Artemis program. Student involvement in almost half of the payloads allow STEM engagement with NASA’s Artemis program. The SLS Block 1 vehicle for the Artemis I flight is manufactured with several elements delivered to Kennedy Space Center (KSC) and being prepared for stacking and integration. The new-development of the program, the 212-footcore stage with its four RS-25 engines installed is currently at Stennis Space Center (SSC) for “green run” testing. Following the green run test campaign, the stage will ship to KSC, where it will be integrated with the rest of the vehicle, including the upper stage adapter, where the Artemis I smallsats will be housed.

Kimberly F Robinson↗

The Mars Pathfinder Mission

On July 4th, 1997, Mars Pathfinder became the third spacecraft to successfully land on the planet Mars. The mission's primary objective was to demonstrate a low-cost system for delivering a small science payload to the surface of Mars, and to test the operation of a rover.

composition↗

Back to Mars: The Mars Pathfinder Mission

Mars Pathfinder successfully landed on the surface of Mars on July 4, 1997, and ushered in a new era in Mars exploration. This era will feature numberous low cost missions which will perform important science investigations and engage the world's population in the excitement of planetary exploration.

Mars↗

Mars Pathfinder Project Progress Report

This paper reports on thestatus of Mars Pathfinder's drive to space qualify its flight system for launch on December 2, 1996 under a cost cap- in particular how the project is dealing with qualification fo its entry, descent and landing event and the surface operations phase as well as the normal launch and space flight phases. It also reports on its landing site selection and science plan.

Mars↗

Progress Report on Mars Pathfinder Project Approach

Mars Pathfinder, launching on December 2, 1996 and landing on Mars on July 4, 1997, will demonstrate a low-cost delivery system to the surface of Mars. Historically, spacecraft that orbit or land on a distant body carry massive amounts of fuel for braking at the planet. Pathfinder requires fuel only to navigate to Mars; the spacecraft aerobrakes into the Mars atmosphere directly from Earth-Mars transfer trajectory, deploys a parachute at 10 km above the surface and, within 100 m of the surface, fires solid rockets for final braking prior to deployment of airbags that cushion touchdown. After landing, petals open to upright the lander, followed by deployment of a small rover and several science instruments.

Mars↗

Mars Pathfinder Science Investigations and Objectives

Pathfinder's primary ojective is to demonstrate an inexpensive system for curise, entry, descent, and landing on mars. Additional objective include the deployent and operation of various science instruments: a stereoscopic imager with filters on a pop up mast, and alpha proton x-ray spectometer (APXS), and an atmospheric structure instrument/meteorology package

Mars↗

Mesur Pathfinder: Steps Toward U.S. Return To The Surface Of Mars

The Mars Environmental Survey (MESUR) project has been established to deliver and emplace a network of small landers on Mars. A key requisite for this mission is the development of a low cost, simple, robust delivery system for payloads to the Martian surface.

Mars↗