Search NASASearch

SEARCH · Search NASA

Results for “Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

NASA scheduling technologies

This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

Adair, Jerry R.

Planning as a Precursor to Scheduling for Space Station Payload Operations

Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

Howell, Eric

A System for Automatically Generating Scheduling Heuristics

The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

Morris, Robert

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.

Mission Operations Planning and Scheduling System (MOPSS)

MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

Wood, Terri

Assessment of New Load Schedules for the Machine Calibration of a Force Balance

New load schedules for the machine calibration of a six-component force balance are currently being developed and evaluated at the NASA Ames Balance Calibration Laboratory. One of the proposed load schedules is discussed in the paper. It has a total of 2082 points that are distributed across 16 load series. Several criteria were applied to define the load schedule. It was decided, for example, to specify the calibration load set in force balance format as this approach greatly simplifies the definition of the lower and upper bounds of the load schedule. In addition, all loads are assumed to be applied in a calibration machine by using the one-factor-at-a-time approach. At first, all single-component loads are applied in six load series. Then, three two-component load series are applied. They consist of the load pairs (N1, N2), (S1, S2), and (RM, AF). Afterwards, four three-component load series are applied. They consist of the combinations (N1, N2, AF), (S1, S2, AF), (N1, N2, RM), and (S1, S2, RM). In the next step, one four-component load series is applied. It is the load combination (N1, N2, S1, S2). Finally, two five-component load series are applied. They are the load combination (N1, N2, S1, S2, AF) and (N1, N2, S1, S2, RM). The maximum difference between loads of two subsequent data points of the load schedule is limited to 33 % of capacity. This constraint helps avoid unwanted load "jumps" in the load schedule that can have a negative impact on the performance of a calibration machine. Only loadings of the single- and two-component load series are loaded to 100 % of capacity. This approach was selected because it keeps the total number of calibration points to a reasonable limit while still allowing for the application of some of the more complex load combinations. Data from two of NASA's force balances is used to illustrate important characteristics of the proposed 2082-point calibration load schedule.

wind tunnel testing

Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

MSL

Systematic Hybrid Network Scheduling for Multiple Traffic Classes with Host Timing and Phase Constraints

Systems and methods for systematic hybrid network scheduling for multiple traffic classes with host timing and phase constraints are provided. In certain embodiments, a method of scheduling communications in a network comprises scheduling transmission of virtual links pertaining to a first traffic class on a global schedule to coordinate transmission of the virtual links pertaining to the first traffic class across all transmitting end stations on the global schedule; and scheduling transmission of each virtual link pertaining to a second traffic class on a local schedule of the respective transmitting end station from which each respective virtual link pertaining to the second traffic class is transmitted such that transmission of each virtual link pertaining to the second traffic class is coordinated only at the respective end station from which each respective virtual link pertaining to the second traffic class is transmitted.

Varadarajan, Srivatsan

Scheduling and Operations of the Orbiting Carbon Observatory-3 Mission

This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) Orbiting Carbon Observatory-3 (OCO-3) Mission. OCO-3 measures atmospheric carbon dioxide from space. Made from the spare instrument built as a backup to the Orbiting Carbon Observatory-2 (OCO-2), OCO-3 extends the rich set of data collected by OCO-2. OCO-3 is outfitted with an agile Pointing Mirror Assembly (PMA) that allows for more detailed types of observations and rapid mode transitions. The mission uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system for scheduling nominal operations, as well as a separate automated scheduling system developed for scheduling observations for the calibration of the PMA. CLASP is used to schedule the four types of observational modes: Nadir, Glint, Target, and Snapshot Area Map. OCO-3 has a variety of complex mission-specific geometric constraints that were incorporated into CLASP to produce schedules that ensure instrument safety.

Moy, Alan

Ground and Onboard Automated Scheduling for the Mars 2020 Rover Mission

The Mars 2020 Rover mission is using automated scheduling in two capacities. As of March 2021 a ground-based scheduler automatically schedules rover wake/sleep and preheats to support Mars 2020 daily operations. Included in the ground system is an explainable scheduling tool that allows users in-sight into the schedule developed by the automated scheduler. An onboard scheduler that will allow the rover autonomously better account for variations in execution is in development for use later in the mission.

Towey, Shannon

SatNet: A Benchmark for Satellite Scheduling Optimization

Satellites provide essential services such as networking and weather tracking, and the number of near-earth and deep space satellites are expected to grow rapidly in the coming years. Communications with terrestrial ground stations is one of the critical functionalities of any space mission. Satellite scheduling is a problem that has been scientifically investigated since the 1970s. A central aspect of this problem is the need to consider resource contention and satellite visibility constraints as they require line of sight. Due to the combinatorial nature of the problem, prior solutions such as linear programs and evolutionary algorithms require extensive compute capabilities to output a feasible schedule for each scenario. Machine learning based scheduling can provide an alternative solution by training a model with historical data and generating a schedule quickly with model inference. We present SatNet, a benchmark for satellite scheduling optimization based on historical data from the NASA Deep Space Network. We propose formulation of the satellite scheduling problem as a Markov Decision Process and use reinforcement learning (RL) policies to generate schedules. The nature of constraints imposed by SatNet differ from other combinatorial optimization problems such as vehicle routing studied in prior literature. Our initial results indicate that RL is an alternative optimization approach that can generate candidate solutions of comparable quality to existing state-of-the-practice results. However, we also find that RL policies overfit to the training dataset and do not generalize well to new data, thereby necessitating continued research on reusable and generalizable agents.

Wilson, Brian

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule

Comparison of First-Come First-Served and Optimization Based Scheduling Algorithms for Integrated Departure and Arrival Management

Korea Aerospace Research Institute (KARI) and National Aeronautics and Space Administration (NASA) are investigating scheduling algorithms that will be a part of an integrated arrival and departure management system. Inha University, one of the Korean collaborators of KARI, developed an Extended First-Come First-Served (EFCFS) algorithm that is robust and efficient. However, since the EFCFS algorithm sequentially computes the schedule based on priority, the end results may not be optimal for system efficiency. The approach based on Mixed Integer Linear Programming (MILP) originally developed by NASA and modified by KARI is known to produce better schedules at the expense of computational cost. In this paper, the two different scheduling approaches are compared using common traffic scenarios and constraints at Incheon International Airport. Capabilities to apply weight class based wake turbulence runway separation minima and Miles-in-Trail (MIT) restrictions at selected meter fixes are added to the previously developed EFCFS scheduler. Based on historic data, 40 departures and 20 arrivals are chosen in a one-hour period and 100 scenarios were created by randomly assigning gate numbers, gate departure times, and runway landing times. With the current runway separation requirements, MILP resulted in about ten to twenty percent smaller average delays depending on the constraints. With artificially increased separation minima, the difference between MILP and EFCFS became more noticeable. However, the EFCFS was about ten times faster with smaller variations among different scenarios and constraints. The comparison suggests that the MILP-based algorithm has a small advantage at the current traffic level; however, has potential to be more effective in higher demand or severe weather situations. The EFCFS algorithm may be better suited for real-time applications or investigating larger scale scheduling problems.

air traffic optimization

A Scheduling Algorithm Compatible with a Distributed Management of Arrivals in the National Airspace System

The current system used by the FAA to schedule arrivals is the Traffic Based Flow Manager (TBFM). It is a centralized system that gives an operator (airline) no influence over scheduled times of arrival assigned to its flights. Future systems for managing arrival scheduling are proposed as distributed systems. Such a system is called upon to give operators influence to schedule and negotiate resources for their flights, and to resolve other technical challenges, such as eliminating a single point of failure. A distributed system for managing diverse air traffic will need the capability of computing a schedule for the given arriving flights in a way that complies with the operational constraints. This paper contributes an algorithm that computes such a schedule. Although developed as part of an effort toward a distributed system, the algorithm itself is neither inherently distributed nor inherently centralized and can be used in either type of system.

negotiation

(abstract) FASTER -- A Tool for DSN Forecasting and Scheduling

FASTER, the Forecasting And Scheduling Tool for Earth-based Resources is a suite of software tools developed at JPL to aid in the process of allocating DSN 70 and 34 meter antennas and equipment to support deep space satellites and ground based astronomy. FASTER has been designed for use by a diverse user community, including mid-level managers, data entry and analysis teams, and project scheduling personnel. The system helps to automate many of the previously labor intensive tasks and ensure proper analysis and consistency throughout all phases of the allocation process. FASTER implements an interactive environment for both forecasting and scheduling. This paper will discuss technical aspects of the FASTER system, including forecasting and scheduling algorithms, issues related to large scale use of a scheduling and forecasting system, implications to the process in which a forecasting and scheduling system is embedded, and lessons learned and implications to similar systems.

forecasting

FASTER -- A Tool for DSN Forecasting and Scheduling

FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling of JPL's DSN. The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER is a MS-Windows based program that replaces two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to "look ahead" at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

forecasting

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned