Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic Resource Scheduling in Mobile Edge Cloud with Cloud Radio Access Network

Nowadays, by integrating the cloud radio access network (C-RAN) with the mobile edge cloud computing (MEC) technology, mobile service provider (MSP) can efficiently handle the increasing mobile traffic and enhance the capabilities of mobile devices. But the power consumption has become skyrocketing for MSP and it gravely affects the profit of MSP. Previous work often studied the power consumption in C-RAN and MEC separately while less work had considered the integration of C-RAN with MEC. In this paper, we present an unifying framework for the power-performance tradeoff of MSP by jointly scheduling network resources in C-RAN and computation resources in MEC to maximize the profit of MSP. To achieve this objective, we formulate the resource scheduling issue as a stochastic problem and design a new optimization framework by using an extended Lyapunov technique. Specially, because the standard Lyapunov technique critically assumes that job requests have fixed lengths and can be finished within each decision making interval, it is not suitable for the dynamic situation where the mobile job requests have variable lengths. To solve this problem, we extend the standard Lyapunov technique and design the VariedLen algorithm to make online decisions in consecutive time for job requests with variable lengths. Furthermore, our proposed algorithm can reach time average profit that is close to the optimum with a diminishing gap (1/V) for the MSP while still maintaining strong system stability and low congestion. With extensive simulations based on a real world trace, we demonstrate the efficacy and optimality of our proposed algorithm.

97 MATHEMATICS AND COMPUTING↗

An agent-based deployment decision-support system for electric vehicle services

METS-R ADDSEVS simulator is a high fidelity, parallel, agent-based evacuation simulator for multi-modal energy-optimal trip scheduling in real-time (METS-R) at transportation hubs. It consists of two modules. The first one is the traffic simulator module; the second one is the high-performance computing (HPC) module. More details can be found at https://umnilab.github.io/METS-R_doc/.

Lei, Zengxiang↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Sault Tribe Building Efficiency Energy Audits

The Sault Ste. Marie Tribe of Chippewa Indians is working to reduce energy consumption and expense in Tribally-owned governmental buildings. The Sault Ste. Marie Tribe of Chippewa Indians will conduct energy audits of nine Tribally-owned governmental buildings in three counties in the Upper Peninsula of Michigan to provide a basis for evaluating and selecting the technical and economic viability of energy efficiency improvement options. The Sault Ste. Marie Tribe of Chippewa Indians will follow established Tribal procurement policies and procedures to secure the services of a qualified provider to conduct energy audits of nine designated buildings. The contracted provider will be required to provide a progress schedule to the Tribe prior to commencing the project and submit an updated schedule with their monthly billings. Findings and analysis reports will be required for buildings as completed, and a complete Energy Audit Summary Report will be required to be submitted with the provider?s final billing. Conducting energy audits of the nine governmental buildings will disclose building inefficiencies to prioritize and address, resulting in reduced energy consumption and expense. These savings will allow Tribal resources to be reallocated to direct services, which will benefit Tribal members and families.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Integrated Platform for Wind Plant Operations: From Atmosphere to Electrons to the Grid

Under the Atmosphere to Electrons to Grid project (A2e2g), the National Renewable Energy Laboratory (NREL) is developing an optimization platform for wind plant operations. The platform merges forecasting tools with aerodynamic and economic models in order to identify optimal operating schedules and controller functions that will maximize a wind plant's value streams for energy and other grid services. In this presentation, we will describe functionalities of the platform. We will also discuss the implications the use of the platform might have for understanding and valuing the capabilities of wind resources for power system operations.

A2E2G↗

PDPTW-DB: MILP-Based Offline Route Planning for PDPTW with Driver Breaks

The Pickup and Delivery Problem with Time Windows (PDPTW) involves optimizing routes for vehicles to meet pickup and delivery requests within specific time constraints, a challenge commonly faced in logistics and transportation. Microtransit, a flexible and demand-responsive service using smaller vehicles within defined zones, can be effectively modeled as a PDPTW. Yet, the need for driver breaks—a key human constraint—is frequently overlooked in PDPTW solutions, despite being necessary for regulatory compliance. This study presents a novel mixed-integer linear programming formulation for the Pickup and Delivery Problem with Time Windows and Driver Breaks (PDPTW-DB). To the best of our knowledge this formulation is the first to consider mandatory periodic driver breaks within optimized Microtransit routes. The proposed model incorporates regulatory compliant break scheduling directly within the vehicle routing optimization framework. By considering driver break requirements as an integral component of the optimization process, rather than as a post-processing step, the model enables the generation of routes that respect hours of service regulations while minimizing operational costs. This integrated approach facilitates the generation of schedules that are operationally efficient and prioritize driver welfare through driver breaks. We work with a public transit agency from the southern USA, and highlight the specific nuances of driver break optimization, and present a Pickup and Delivery Problem with Time Windows formulation for optimizing Microtransit operations and scheduling driver breaks. We validate our approach using real-world data from the transit agency. Our results validate our formulation in producing cost-effective, and regulation-compliant solutions.

Applied Computing, Transportation↗

Evaluating Quality of Service Traffic Classes on the Megafly Network

An emerging trend in High Performance Computing (HPC) systems that use hierarchical topologies (such as dragonfly) is that the applications are increasingly exhibiting high run-to-run performance variability. This poses a significant challenge for application developers, job schedulers, and system maintainers. One approach to address the performance variability is to use newly proposed network topologies such as megafly (or dragonfly+) that offer increased path diversity compared to a traditional fully connected dragonfly. Yet another approach is to use quality of service (QoS) traffic classes that ensure bandwidth guarantees. In this work, we select HPC application workloads that have exhibited performance variability on current 2-D dragonfly systems. We evaluate the baseline performance expectations of these workloads on megafly and 1-D dragonfly network models with comparably similar network configurations. Our results show that the megafly network, despite using fewer virtual channels (VCs) for deadlock avoidance than a dragonfly, performs as well as a fully connected 1-D dragonfly network. We then exploit the fact that megafly networks require fewer VCs to incorporate QoS traffic classes. We use bandwidth capping and traffic differentiation techniques to introduce multiple traffic classes in megafly networks. In some cases, our results show that QoS can completely mitigate application performance variability while causing minimal slowdown to the background network traffic.

Mubarak, Misbah↗

Minimizing Energy Use of Mixed-Fleet Public Transit for Fixed-Route Service

Affordable public transit services are crucial for communities since they enable residents to access employment, education, and other services. Unfortunately, transit services that provide wide coverage tend to suffer from relatively low utilization, which results in high fuel usage per passenger per mile, leading to high operating costs and environmental impact. Electric vehicles (EVs) can reduce energy costs and environmental impact, but most public transit agencies have to employ them in combination with conventional, internal-combustion engine vehicles due to the high upfront costs of EVs. To make the best use of such a mixed fleet of vehicles, transit agencies need to optimize route assignments and charging schedules, which presents a challenging problem for large transit networks. We introduce a novel problem formulation to minimize fuel and electricity use by assigning vehicles to transit trips and scheduling them for charging, while serving an existing fixed-route transit schedule. We present an integer program for optimal assignment and scheduling, and we propose polynomial-time heuristic and meta-heuristic algorithms for larger networks. We evaluate our algorithms on the public transit service of Chattanooga, TN using operational data collected from transit vehicles. Our results show that the proposed algorithms are scalable and can reduce energy use and, hence, environmental impact and operational costs. For Chattanooga, the proposed algorithms can save $145,635 in energy costs and 576.7 metric tons of CO 2 emission annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SciDAC's Earth System Grid Center for Enabling Technologies Semi-Annual Progress Report for the Period April 1, 2009 through September 30, 2009

This report summarizes work carried out by the ESG-CET during the period April 1, 2009 through September 30, 2009. It includes discussion of highlights, overall progress, period goals, collaborations, papers, and presentations. To learn more about our project, and to find previous reports, please visit the Earth System Grid Center for Enabling Technologies (ESG-CET) website. This report will be forwarded to the DOE SciDAC program management, the Office of Biological and Environmental Research (OBER) program management, national and international collaborators and stakeholders (e.g., the Community Climate System Model (CCSM), the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5), the Climate Science Computational End Station (CCES), the SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science, the North American Regional Climate Change Assessment Program (NARCCAP), and other wide-ranging climate model evaluation activities). During this semi-annual reporting period, the ESG-CET team continued its efforts to complete software components needed for the ESG Gateway and Data Node. These components include: Data Versioning, Data Replication, DataMover-Lite (DML) and Bulk Data Mover (BDM), Metrics, Product Services, and Security, all joining together to form ESG-CET's first beta release. The launch of the beta release is scheduled for late October with the installation of ESG Gateways at NCAR and LLNL/PCMDI. Using the developed ESG Data Publisher, the ESG II CMIP3 (IPCC AR4) data holdings - approximately 35 TB - will be among the first datasets to be published into the new ESG enterprise system. In addition, the NCAR's ESG II data holdings will also be published into the new system - approximately 200 TB. This period also saw the testing of the ESG Data Node at various collaboration sites, including: the British Atmospheric Data Center (BADC), the Max-Planck-Institute for Meteorology, the University of Tokyo Center for Climate System Research, and the Australian National University. This period, a total of 14 national and international sites installed an ESG Data Node for testing. During this period, we also continued to provide production-level services to the community, providing researchers worldwide with access to CMIP3 (IPCC AR4), CCES, and CCSM, Parallel Climate Model (PCM), Parallel Ocean Program (POP), and Cloud Feedback Model Intercomparison Project (CFMIP), and NARCCAP data.

54 ENVIRONMENTAL SCIENCES↗

A Digital Twin of Scalable Quantum Clouds

Quantum computing has emerged as a transformative technology capable of solving complex problems beyond the limit of classical systems. The rapid development of quantum processors has led to the proliferation of cloud-based quantum computing services offered by platforms such as IBM, Google, and Amazon. These platforms introduce unique challenges in resource allocation, job scheduling, and multi-device orchestration as quantum workloads become increasingly complex. In this work, we present a digital twin of quantum cloud infrastructures: a framework designed to model and simulate the behavior of real quantum cloud systems. Developed in Python using the SimPy discrete-event simulation library, the framework replicates key aspects of quantum cloud environments, including detailed quantum device modeling, job lifecycle management, and job fidelity. It incorporates noise-aware fidelity estimation, making it the first of its kind to simulate superconducting gate-based quantum cloud systems at an administrative level with job fidelity. We present use cases as proof of concept, demonstrating that our quantum cloud simulation framework can act as a digital twin of a quantum cloud and support the modeling and implementation of practical systems.

Luo, Waylon [Kent State University]↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies (Presentation)

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies: Preprint

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

A novel large-scale EV charging scheduling algorithm considering V2G and reactive power management based on ADMM

Electric vehicle aggregators (EVAs) that utilize vehicle-to-grid (V2G) technologies can function as both controllable loads and virtual power plants, providing key energy management services to the distribution system operator (DSO). EVAs can also balance the grid’s reactive power as a virtual static VAR compensator (SVC) and provide voltage stability by utilizing advanced electric vehicle (EV) chargers that are capable of four-quadrant operations to provide reactive power management. Finally, managed charging can benefit EVAs themselves by minimizing power factor penalties in their electricity bills. In this paper, we propose a novel EV charging scheduling algorithm based on a hierarchical distributed optimization framework that minimizes peak load and provides reactive power compensation for the DSO by collaboration with EVAs that manage both the active and the reactive charging and discharging power of participating EVs. Utilizing the alternative direction method of multipliers (ADMM), the proposed distributed optimization approach scales well with increased EV charging infrastructure by balancing active and reactive power while decreasing computational burden. In our proposed hierarchical approach, each EVA schedules the active and reactive EV charging and discharging power for 1) reactive power compensation in order to minimize power factor penalty and electricity cost accrued by the EVA, 2) satisfaction of each EV’s energy demand at minimal charging cost, and 3) peak shaving and load management for the DSO. When compared with an uncoordinated charging model, the efficacy of this proposed model is successfully demonstrated through a 300% decreased peak EV load for the DSO, 28% lower electricity costs for EV users, and 98.55% smaller power factor penalty, along with 17.58% lower overall electricity costs, for EVAs. The performance of our approach is validated in a case study with 50 EVs at multiple EVAs in an IEEE 13-bus test case and compared the results with uncoordinated EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secure mmWave Spectrum Sharing with Autonomous Beam Scheduling for 5G and Beyond

Spectrum Sharing (SS) has seen a renewed set of initiatives in 5G with the availability of shared and unlicensed spectrum bands that can be used by multiple cellular service providers and private cellular networks. Beam based transmission, instead of the traditional sector based transmission in conjunction with the spectrum agility of the 5G New Radio (NR) has brought new opportunities to optimized sharing of spectrum. Currently in the U.S., a centralized Spectrum Access Server (SAS) is used to co-ordinate spectrum sharing among networks sharing the same spectrum band. However, SAS becomes a focal point for security attacks and a performance bottleneck. In addition, SAS relies on an Environmental Sensor Network (ESN), separate from the 5G network. Without trusted spectral occupancy information, false reporting of spectrum sensing data can create sub-optimal and unfair spectrum usage. This paper summarizes our recent research findings in using a decentralized scheme for multiple networks to securely share spectrum with autonomous beam scheduling : 1) A new stochastic network framework based on Lyapunov Optimization approach is developed to optimize scheduling at the base stations; 2) Game theoretic (GT) approach is used to formulate the distributed scheduler; 3) Another distributed scheduler with Q-learning is presented that utilizes the Reinforcement Learning (RL) approach; 4) The performance and convergence rate of these distributed solutions to use shared and unlicensed spectrum are compared with existing solutions. Conditions under which the performance of these schedulers approach the theoretical upper bound, which is the performance possible with no interference among the operators sharing the spectrum, are presented; 5) The ability of a base station to use its own user equipment as sensors, for optimal spectrum sharing with base stations in other operator networks, is demonstrated to be an effective approach.

5G↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗