Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

TPSAS-NF1676L-11456-DND

NASA’s precision scheduling and spacing research has matured to show the high potential of merging efficient flows in high density operations - Precision scheduling and efficient delay distribution minimizes early descent from enroute altitude and low-altitude vectoring - Precision merging and spacing control improves throughput - Enables the extended use of flight path optimization based procedures FAA/NASA/Industry collaboration is needed to accelerate implementation of ADS-B applications in a way that achieves the full benefit of NextGen operations to those that equip in high density airspace Integrated precision scheduling and spacing will to offer immediate and systematic benefits to airlines in many environments, even with different equipage levels and traffic densities

Harry Swenson↗

Integrated Planning and Scheduling for NASA’s Deep Space Network – from Forecasting to Real-time

Over a period of several years, the software systems that plan and schedule the use of NASA’s Deep Space Network (DSN) for the projects it serves have been upgraded from a disparate set of decades-old software components, to an integrated suite covering long-range planning and forecasting, all the way to real-time scheduling. The most recent component of this suite is known as LAPS, for Loading Analysis and Planning Software, and is responsible for long-term planning and forecasting, including studies and analysis of new missions, changed mission requirements, downtime, and new or changed antenna capabilities. This paper discusses the architecture of LAPS and its interfaces with other elements of DSN planning and scheduling, its user interfaces, and some lessons learned from development and deployment.

Lad, Jigna↗

NextGen Operations in a Simulated NY Area Airspace

A human-in-the-loop simulation conducted in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center explored the feasibility of a Next Generation Air Transportation System (NextGen) solution to address airspace and airport capacity limitations in and around the New York metropolitan area. A week-long study explored the feasibility of a new Optimal Profile Descent (OPD) arrival into the airspace as well as a novel application of a Terminal Area Precision Scheduling and Spacing (TAPSS) enhancement to the Traffic Management Advisor (TMA) arrival scheduling tool to coordinate high volume arrival traffic to intersecting runways. In the simulation, four en route sector controllers and four terminal radar approach control (TRACON) controllers managed traffic inbound to Newark International Airport's primary runway, 22L, and its intersecting overflow runway, 11. TAPSS was used to generate independent arrival schedules for each runway and a traffic management coordinator participant adjusted the arrival schedule for each runway 11 aircraft to follow one of the 22L aircraft. TAPSS also provided controller-managed spacing tools (slot markers with speed advisories and timelines) to assist the TRACON controllers in managing the arrivals that were descending on OPDs. Results showed that the tools significantly decreased the occurrence of runway violations (potential go-arounds) when compared with a Baseline condition with no tools. Further, the combined use of the tools with the new OPD produced a peak arrival rate of over 65 aircraft per hour using instrument flight rules (IFR), exceeding the current maximum arrival rate at Newark Liberty International Airport (EWR) of 52 per hour under visual flight rules (VFR). Although the participants rated the workload as relatively low and acceptable both with and without the tools, they rated the tools as reducing their workload further. Safety and coordination were rated by most participants as acceptable in both conditions, although the TRACON Runway Coordinator (TRC) rated neither as acceptable in the Baseline condition. Regarding the role of the TRC, the two TRACON controllers handling the 11 arrivals indicated that the TRC was very much needed in the Baseline condition without tools, but not needed in the condition with tools. This indicates that the tools were providing much of the sequencing and spacing information that the TRC had supplied in the Baseline condition.

NextGen↗

A survey of planning and scheduling research at the NASA Ames Research Center

NASA Ames Research Center has a diverse program in planning and scheduling. This paper highlights some of our research projects as well as some of our applications. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

Zweben, Monte↗

A survey of planning and scheduling research at the NASA Ames Research Center

NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

Zweben, Monte↗

Collaborative Resource Allocation

Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.

Wang, Yeou-Fang↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

Jaap, John↗

Temperature-Driven Shape Changes of the Near Earth Asteroid Scout Solar Sail

Near Earth Asteroid Scout (NEA Scout) is a NASA deep space Cubesat, scheduled to launch on the Exploration Mission 1 flight of the Space Launch System. NEA Scout will use a deployable solar sail as its primary propulsion system. The sail is a square membrane supported by rigid metallic tapespring booms, and analysis predicts that these booms will experience substantial thermal warping if they are exposed to direct sunlight in the space environment. NASA has conducted sunspot chamber experiments to confirm the thermal distortion of this class of booms, demonstrating tip displacement of between 20 and 50 centimeters in a 4-meter boom. The distortion behavior of the boom is complex and demonstrates an application for advanced thermal-structural analysis. The needs of the NEA Scout project were supported by changing the solar sail design to keep the booms shaded during use of the solar sail, and an additional experiment in the sunspot chamber is presented in support of this solution.

Stohlman, Olive R.↗

Humans in space

Information is given in viewgraph form on humans in space. Information is given on extravehicular activity/space suit project objectives and program schedule, and space human factors objectives and products.

Jenkins, James P.↗

Joint ASI/NASA efforts on tether flight demonstrations

Technological and organizational aspects of joint efforts by NASA and the Italian space agency ASI to develop tethered spacecraft systems are briefly discussed. The members of the ASI/NASA Task Group for Tether Flight Demonstrations are listed; the history of Task Group activities since 1986 is reviewed; and the current status of the main projects is indicated in a series of charts. Particular attention is given to the Tether Initiated Space Recovery System, a 450-lb spacecraft with a 20-km tether scheduled for Space Shuttle or Delta II launch to a 250-km 27.5-deg circular orbit in 1992.

Loria, Alberto↗

How to Compute a Slot Marker - Calculation of Controller Managed Spacing Tools for Efficient Descents with Precision Scheduling

This paper describes the underlying principles and algorithms for computing the primary controller managed spacing (CMS) tools developed at NASA for precisely spacing aircraft along efficient descent paths. The trajectory-based CMS tools include slot markers, delay indications and speed advisories. These tools are one of three core NASA technologies integrated in NASAs ATM technology demonstration-1 (ATD-1) that will operationally demonstrate the feasibility of fuel-efficient, high throughput arrival operations using Automatic Dependent Surveillance Broadcast (ADS-B) and ground-based and airborne NASA technologies for precision scheduling and spacing.

efficient arrivals↗

In-Space Crew-Collaborative Task Scheduling

As humans venture farther from earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, there are many reasons why the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

Jaap, John↗

In-Space Crew-Collaborative Task Scheduling

As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

Jaap, John↗

Space Telescope mission planning

Planning and scheduling for the Space Telescope astronomy mission involves a combination of concerns regarding orbital environment constraints and spacecraft operational characteristics. In many cases proper selection or sequencing of observations can minimize the impact of disadvantageous orbital geometry with respect to targets of interest or of repeatedly encountered environmental factors such as spacecraft passages through high radiant regions on the earth's upper atmosphere. An overview is presented of the characteristics of viewing celestial targets from low earth orbit and the principal effects and operational considerations which constrain or restrict the scheduling of observations of them.

Sherrill, T. J.↗

A Novel Application of TMA to Converging Runway Operations in a Simulated NextGen Environment

In 2013, the Airspace Operations Laboratory at NASA Ames Research Center conducted a human-in-the-loop simulation that examined the feasibility of applying a number of Next Generation Air Transportation System (NextGen) solutions to complex arrival operations in and around the New York metroplex. The delivery of arrivals to Newark Liberty International Airport (EWR) was the focus of this simulation, which involved extending the Terminal Sequencing and Spacing (TSS) scheduling capability to precisely schedule arrivals to intersecting runways 22 Left and 11. An important enabler for the concept was the availability of a dependent runway scheduler that was able to coordinate arrival times between aircraft landing on intersecting runways. At the time of the study, there was no functionality within the TSS scheduler to automatically create the dependent runway schedules. Instead, a Traffic Management Coordinator (TMC) manually created a de-conflicted schedule, which allowed for the concept to be tested as well as provided valuable insight into the tool requirements for a dependent runway scheduler. Throughout the course of preparations for the simulation, the individual serving as the TMC developed a number of strategies and procedures for manually adjusting the Scheduled Time of Arrival (STA) of the EWR arrivals in order to ensure that adequate spacing was provided between runway 22L and 11 arrival pairs. This paper describes the strategies and procedures that were developed and details how they were successfully applied during the simulation. Results will also be presented that shed additional light on exactly how the schedules were manipulated and their impact on delivery performance and safety. Ideas for additional TSS enhancements and next steps, based on participant feedback, will also be presented.

Homola, Jeffrey↗