Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Engineering and Integrations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

System Safety Analysis of Complex NASA Systems with Model-Based Engineering

The emergence of model-based engineering is transforming design and analysis methodologies [5]. A recognized benefit of model-based engineering is the existence of a “single source of truth” about the system that becomes the authoritative source of data and information for designers, analysts, and developers. This promotes consistency and efficiency as the design emerges and can be used to further optimize the design. Integrating System Safety Engineers to the “single source of truth” will ensure that the outputs of their assessments and analyses are relevant to the design as it evolves. Use of an integrated system model enables near immediate evaluation of a design change as well as development of operational processes for risk assessment and communication. Such models can enable efficient and timely analysis of system hazards (e.g., hazard fault tree analysis and procedure simulations) and produce complete, accurate, and more consistent products (e.g., hazard reports and safety requirement evaluations). Therefore, an agency-sponsored team at Goddard Space Flight Center (GSFC) recently completed a System Safety Study of modeling and testing capabilities as part of a Model-Based Safety and Mission Assurance Initiative (MBSMAI). Using an existing model developed for reliability analyses [1], GSFC modeling and system safety experts performed system safety analysis/modeling and produced safety products. The team evaluated model-based feasibility to support System Safety Engineering, developed safety analysis modeling processes, and identified tool capability advancement/development needs. These study results indicate model-based engineering is valid and useable for System

NASA↗

System Safety Analysis of Complex NASA Systems with Model Based Engineering

The emergence of model-based engineering is transforming design and analysis methodologies [5]. A recognized benefit of model-based engineering is the existence of a “single source of truth” about the system that becomes the authoritative source of data and information for designers, analysts, and developers. This promotes consistency and efficiency as the design emerges and can be used to further optimize the design. Integrating System Safety Engineers to the “single source of truth” will ensure that the outputs of their assessments and analyses are relevant to the design as it evolves. Use of an integrated system model enables near immediate evaluation of a design change as well as development of operational processes for risk assessment and communication. Such models can enable efficient and timely analysis of system hazards (e.g., hazard fault tree analysis and procedure simulations) and produce complete, accurate, and more consistent products (e.g., hazard reports and safety requirement evaluations). Therefore, an agency-sponsored team at Goddard Space Flight Center (GSFC) recently completed a System Safety Study of modeling and testing capabilities as part of a Model-Based Safety and Mission Assurance Initiative (MBSMAI). Using an existing model developed for reliability analyses [1], GSFC modeling and system safety experts performed system safety analysis/modeling and produced safety products. The team evaluated model-based feasibility to support System Safety Engineering, developed safety analysis modeling processes, and identified tool capability advancement/development needs. These study results indicate model-based engineering is valid and useable for System

Model Based Engineering↗

The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

Culbertson, Andrew↗

Spring 2013 Graduate Engineering Internship Summary

In the spring of 2013, I participated in the National Aeronautics and Space Administration (NASA) Pathways Intern Employment Program at the Kennedy Space Center (KSC) in Florida. This was my final internship opportunity with NASA, a third consecutive extension from a summer 2012 internship. Since the start of my tenure here at KSC, I have gained an invaluable depth of engineering knowledge and extensive hands-on experience. These opportunities have granted me the ability to enhance my systems engineering approach in the field of payload design and testing as well as develop a strong foundation in the area of composite fabrication and testing for repair design on space vehicle structures. As a systems engineer, I supported the systems engineering and integration team with final acceptance testing of the Vegetable Production System, commonly referred to as Veggie. Verification and validation (V and V) of Veggie was carried out prior to qualification testing of the payload, which incorporated the process of confirming the system's design requirements dependent on one or more validation methods: inspection, analysis, demonstration, and testing.

Ehrlich, Joshua↗

Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

Anderson, Herbert A.↗

An Open Avionics and Software Architecture to Support Future NASA Exploration Missions

The presentation describes an avionics and software architecture that has been developed through NASAs Advanced Exploration Systems (AES) division. The architecture is open-source, highly reliable with fault tolerance, and utilizes standard capabilities and interfaces, which are scalable and customizable to support future exploration missions. Specific focus areas of discussion will include command and data handling, software, human interfaces, communication and wireless systems, and systems engineering and integration.

AE↗

The long term energy problem and aeronautics

The projected increase in energy consumption by transportation in general and civil aviation in particular is directly opposed to the dwindling supplies of natural petroleum crude oil currently used to produce aircraft fuels. This fact dictates the need to develop even more energy conservative aircraft and propulsion systems than are currently available and to explore the potential of alternative fuels to replace the current petroleum derived hydrocarbons. Advances in technology are described in the areas of improved component efficiency, aircraft and engine integration, control systems, and advanced lightweight materials that are needed to maximize performance and minimize fuel usage. Also, improved turbofan and unconventional engine cycles which can provide significant fuel usage reductions are described. These advancements must be accomplished within expected environmental constraints such as noise and pollution limits. Alternative fuels derived from oil shale and coal are described, and the possible technological advancements needed to use these fuels in aircraft engines are discussed and evaluated with relation to potential differences in fuel characteristics.

Rudey, R. A.↗

NASA's Man-Systems Integration Standards: A Human Factors Engineering Standard for Everyone in the Nineties

During the second half of the 1980s, a document was created by the National Aeronautics and Space Administration (NASA) to aid in the application of good human factors engineering and human interface practices to the design and development of hardware and systems for use in all United States manned space flight programs. This comprehensive document, known as NASA-STD-3000, the Man-Systems Integration Standards (MSIS), attempts to address, from a human factors engineering/human interface standpoint, all of the various types of equipment with which manned space flight crew members must deal. Basically, all of the human interface situations addressed in the MSIS are present in terrestrially based systems also. The premise of this paper is that, starting with this already created standard, comprehensive documents addressing human factors engineering and human interface concerns could be developed to aid in the design of almost any type of equipment or system which humans interface with in any terrestrial environment. Utilizing the systems and processes currently in place in the MSIS Development Facility at the Johnson Space Center in Houston, TX, any number of MSIS volumes addressing the human factors / human interface needs of any terrestrially based (or, for that matter, airborne) system could be created.

Cletis R. Booher↗

Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'.

Bickford, R. L.↗

Fall 2012 Graduate Engineering Internship Summary

In the fall of 2012, I participated in the National Aeronautics and Space Administration (NASA) Pathways Intern Employment Program at the Kennedy Space Center (KSC) in Florida. This was my second internship opportunity with NASA, a consecutive extension from a summer 2012 internship. During my four-month tenure, I gained valuable knowledge and extensive hands-on experience with payload design and testing as well as composite fabrication for repair design on future space vehicle structures. As a systems engineer, I supported the systems engineering and integration team with the testing of scientific payloads such as the Vegetable Production System (Veggie). Verification and validation (V&V) of the Veggie was carried out prior to qualification testing of the payload, which incorporated a lengthy process of confirming design requirements that were integrated through one or more validatjon methods: inspection, analysis, demonstration, and testing. Additionally, I provided assistance in verifying design requirements outlined in the V&V plan with the requirements outlined by the scientists in the Science Requirements Envelope Document (SRED). The purpose of the SRED was to define experiment requirements intended for the payload to meet and carry out.

Ehrlich, Joshua↗

System Modeling of a Lunar Molten Regolith Electrolysis Plant

Introduction: In-Situ Resource Utilization (ISRU) is the process of extracting local resources to produce commodities for propulsion, life support systems, and off-planet construction rather than transporting consumables from Earth. Molten Regolith Electrolysis (MRE) is a novel ISRU method of extracting oxygen gas and metal alloy from lunar regolith. The MRE process involves placing lunar regolith between two electrodes, through which current is passed, to melt the regolith and reduce the metal oxide constituents by direct electrolysis (e.g. FeO, SiO2, MgO, Al2O3) into oxygen gas and metal alloys. The oxygen is liquefied and used as propellant for landers, while the metals (e.g. Ferro-alloys) are further processed and used in structural building materials and parts manufacturing. A system model was developed that accounted for the major processes of an MRE plant (from excavation of raw materials to storage of products) to assess the feasibility of a lunar MRE plant. The System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team utilized its previously documented system sizing model, the Mission Analysis and Integration Tool (MAIT) [1] as framework of the system model. MAIT uses MATLAB/Simulink to integrate subsystem models into a complete system model of the MRE plant. Total mass, volume, and power requirements were computed for numerous iterations of a MRE plant. System Model: Figure 1: MRE Plant Block Diagram The regolith excavation model determines the mass and power needed to excavate sufficient regolith. The preheating auger initiates the regolith heating process before regolith enters the MRE re-actor to reduce the energy required to turn the solid into a molten liquid. The MRE reactor is modeled in COMSOL Multiphysics and based on the research by Dominguez, Sibille, and Schreiner [2, 3, 4]. This preliminary reactor model provides an accurate calculation of thermal equilibrium during electrochemical operation of the reactor system to assess the optimal mass and power required to process the inlet flow of regolith. The model also computes the outlet flowrates of oxygen and molten products. For this analysis, the primary components of the metal alloy considered were iron and silicon. The oxygen is then purified using an Yttrium Stabilized Zirconia (YSZ) electrode, followed by liquefaction using a 90K cryocooler to be stored as liquid oxygen in insulated cylindrical tanks. In future iterations of the system model, the molten metal tapped from the MRE reactor will undergo additional processing or refinement. However, downstream handling of metals is currently a technology gap that is missing a high TRL subsystem model. Therefore, for this analysis, the accumulated metal alloy stream terminates after leaving the MRE reactor. Study Goals: This analysis investigates multiple input variables to the system to determine the sensitivity of a (near) complete plant at full-scale. This preliminary investigation ran parametric sweeps on the MRE reactor geometry, electrical current supply, layers of multi-layer insulation (MLI) on the reactor, size of the electrodes in the oxygen purification model, and regolith composition (based on landing site location). Three production targets of oxygen (1,000, 10,000, and 50,000 kg/yr) were investigated for this analysis. The parametric sweeps conducted in this analysis provide valuable insight into the expected impact of the various model inputs on plant size. This information can be used to identify the most critical components of the plant and guide future decisions on allocating funding for research and development, providing subsystem developers with appropriate interfaces with downstream and upstream processes, and assessing the overall feasibility of MRE when compared to other ISRU plants. References: [1] Carlson, A. et al. (2024) ICES, ICES-2024-53. [2] Dominguez, D.A., and Sibille, L. (2011) AIAA, AIAA-2011-700. [3] Schreiner, S.S. (2015) MIT, Dissertation. [4] Schreiner, S.S. et al. (2016) ASR, 57(7), pp.1585-1603.

ISRU↗

State Machine Modeling of the Space Launch System Solid Rocket Boosters

The Space Launch System is a Shuttle-derived heavy-lift vehicle currently in development to serve as NASA's premiere launch vehicle for space exploration. The Space Launch System is a multistage rocket with two Solid Rocket Boosters and multiple payloads, including the Multi-Purpose Crew Vehicle. Planned Space Launch System destinations include near-Earth asteroids, the Moon, Mars, and Lagrange points. The Space Launch System is a complex system with many subsystems, requiring considerable systems engineering and integration. To this end, state machine analysis offers a method to support engineering and operational e orts, identify and avert undesirable or potentially hazardous system states, and evaluate system requirements. Finite State Machines model a system as a finite number of states, with transitions between states controlled by state-based and event-based logic. State machines are a useful tool for understanding complex system behaviors and evaluating "what-if" scenarios. This work contributes to a state machine model of the Space Launch System developed at NASA Ames Research Center. The Space Launch System Solid Rocket Booster avionics and ignition subsystems are modeled using MATLAB/Stateflow software. This model is integrated into a larger model of Space Launch System avionics used for verification and validation of Space Launch System operating procedures and design requirements. This includes testing both nominal and o -nominal system states and command sequences.

model-based systems engineering↗

Evaluating Lunar Water Processing System Model Configurations for Small Scale Oxygen and Hydrogen Production Within JAXA'S ISRU Technology

Introduction: In-Situ Resource Utilization (ISRU) refers to novel methods of extracting and processing local resources for use in life support and propulsion systems, reducing or eliminating the required consumables to be transferred from Earth. Current estimates of water-ice availability embedded in regolith within the Moon’s permanently shadowed regions (PSR’s) range between 1-5% by weight. However, the composition and characteristics of the “wet” regolith is unknown. Alternate ISRU excavation techniques and Concept of Operations (ConOps) must be explored to optimize surface system operations based on these factors. To assess the feasibility of different ISRU subsystem technologies and compare system architecture configurations, an interchangeable system model was generated to incorporate technologies spanning excavation of raw materials to storage of products and determine optimal arrangement of total system processing needs. Total Mass, Volume, and Power (M/V/P) requirements were computed for 168 design iterations of this water processing plant. System Model: In FY24, the System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team developed a lunar water processing system model using the Mission Analysis and Integration Tool (MAIT) to estimate the M/V/P for ISRU subsystems operating under a wide range of Hydrogen (H2) and Oxygen (O2) production targets for the Space Technology Mission Directorate (STMD) [1]. Based on Japan Aerospace Exploration Agency’s (JAXA) surface operational requirements, this system architecture was modified to include the ability to excavate consolidated icy regolith (versus granular ice excavation using Kennedy Space Center’s (KSC) ISRU Pilot Excavator, IPEx) and explore the feasibility of processing the lunar water both inside and outside of the PSR. For the consolidated icy regolith case study, excavation was performed via a mobility transport chassis outfitted with The Regolith Ice Drill for Exploring New Terrain (TRIDENT) for drilling [2] and the Cold Operable Lunar Deployable Arm (COLDArm) [3] for regolith transfer. The system model determines the required rover and payload. M/V/P to handle the required regolith processing rates. The regolith is then sorted and heated to sublimate the ice (via an auger dryer). The exiting high temperature, low pressure vapor is cleaned of volatiles (via cold trap) and electrolyzed to produce H2 and O2. These products are then dried, liquified with 20 K and 90 K cryocoolers (for H2 and O2, respectively), and stored in cylindrical tanks. Study Goals: Due to the different ConOps options of regolith transport to the ridge for processing versus processing it directly inside the PSR, as well as the unknown regolith/water-ice composition, new excavation techniques and their power configurations are being evaluated within a ISRU system architecture for production targets less than NASA’s pilot plant (1 mT). This analysis investigates the feasibility of numerous excavation techniques, power architectures, and logistical operations and determines an optimal system configuration with regards to M/V/P. It aims to investigate which parameters, both locally and globally, have the greatest effect on each subsystem within the plant. This can be used to identify the most critical components of the plant, and guide future decisions on allocating funding for research and development. The results from this study may provide subsystem developers with appropriate interfaces with excavation subsystems and downstream processes, and assessing the overall feasibility of each excavation technique, power architecture, and logistical timeframe. References: [1] Carlson, A. et. al. (2024) ICES. [2] Zacny, K., et. al. (2024) “ASCE Earth and Space”. [3] McCormick, R., et. Al. (2024) IEEE Xplore.

ISRU↗

EPOP: The Electric Propulsion Orbital Platform

This paper describes the results of a one-year feasibility study for an Electric Propulsion Orbital Platform (EPOP), whose primary objective is to provide an instrumented platform for testing electric propulsion devices in space. The first flight, EPOP-1, is planned aboard the Shuttle-deployed Wake Shield Facility in March 1995, and will be designed around a commercial 1.8 kW, 0.5 hydrazine arcjet system. Specific subsystems are described, namely the arcjet and the power conditioning unit, the propellant and power systems, and Wake Shield Facility. Also, system engineering and integration issues are discussed. In an accompanying paper, the diagnostics and data acquisition and control systems are described in more detail.

Friedly, V. J.↗

Model Based Systems Analysis and Engineering (MBSA/E) Overview

This presentation provides an overview of the Model-Based Systems Analysis and Engineering work to be completed by the Advanced Air Transportation Technology Project, Systems Analysis and Integration team. The work aims to develop an integrated systems analysis and engineering capability that will be used to digitally integrate and evaluate subsonic aircraft technologies being developed by projects comprising the Sustainable Flight National Partnership.

System Analysis↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.

Caruso, Pamela W.↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗