Search NASA⌕ Search

SEARCH · Search NASA

Results for “TILE OBSERVATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

150 records · Page 9

Clementine High Resolution Camera Mosaicking Project: CL 6022; 80 deg S to 90 deg S Latitude, South Periapsis - Volume 22

This compact disk (CD) is part of the Clementine I high resolution (HiRes) camera lunar image mosaics developed by Malin Space Science Systems (MSSS). These mosaics were developed through calibration and semi-automated registration against the recently released geometrically and photometrically controlled Ultraviolet/Visible (UV/Vis) Basemap Mosaic, which is available through the PDS, as CD-ROM volumes CL_3001-3015. The HiRes mosaics are compiled from non-uniformity corrected, 750 nanometer ("D") filter high resolution observations from the HiRes imaging system onboard the Clementine Spacecraft. The geometric control is provided by the U.S. Geological Survey (USGS) Clementine Basemap Mosaic compiled from the 750 nm Ultraviolet/Visible Clementine imaging system. Calibration was achieved by removing the image nonuniformity largely caused by the HiRes system's light intensifier. Also provided are offset and scale factors, achieved by a fit of the HiRes data to the corresponding photometrically calibrated UV/Vis basemap that approximately transform the 8-bit HiRes data to photometric units. The mosaics on this CD are compiled from polar data (latitudes greater than 80 degrees), and are presented in the stereographic projection at a scale of 30 m/pixel at the pole, a resolution 5 times greater than that (150 m/pixel) of the corresponding UV/Vis polar basemap. This 5:1 scale ratio is in keeping with the sub-polar mosaic, in which the HiRes and UV/Vis mosaics had scales of 20 m/pixel and 100 m/pixel, respectively. The equal-area property of the stereographic projection made this preferable for the HiRes polar mosaic rather than the basemap's orthographic projection. Thus, a necessary first step in constructing the mosaic was the reprojection of the UV/Vis basemap to the stereographic projection. The HiRes polar data can be naturally grouped according to the orbital periapsis, which was in the south during the first half of the mapping mission and in the north during the second half. Images in each group have generally uniform intrinsic resolution, illumination, exposure and gain. Rather than mingle data from the two periapsis epochs, separate mosaics are provided for each, a total of 4 polar mosaics. The mosaics are divided into 100 square tiles of 2250 pixels (approximately 2.2 deg near the pole) on a side. Not all squares of this grid contain HiRes mosaic data, some inevitably since a square is not a perfect representation of a (latitude) circle, others due to the lack of HiRes data. This CD also contains ancillary data files that support the HiRes mosaic. These files include browse images with UV/Vis context stored in a Joint Photographic Experts Group (JPEG) format, index files ('imgindx.tab' and 'srcindx.tab') that tabulate the contents of the CD, and documentation files. For more information on the contents and organization of the CD volume set refer to the "FILES, DIRECTORIES AND DISK CONTENTS" section of this document. The image files are organized according to NASA's Planetary Data System (PDS) standards. An image file (tile) is organized as a PDS labeled file containing an "image object".

Malin, Michael↗

Clementine High Resolution Camera Mosaicking Project: CL 6020; 80 deg N to 90 deg N Latitude, South Periapsis - Volume 20

This compact disk (CD) is part of the Clementine I high resolution (HiRes) camera lunar image mosaics developed by Malin Space Science Systems (MSSS). These mosaics were developed through calibration and semi-automated registration against the recently released geometrically and photometrically controlled Ultraviolet/Visible (UV/Vis) Basemap Mosaic, which is available through the PDS, as CD-ROM volumes CL_3001-3015. The HiRes mosaics are compiled from non-uniformity corrected, 750 nanometer ("D") filter high resolution observations from the HiRes imaging system onboard the Clementine Spacecraft. The geometric control is provided by the U.S. Geological Survey (USGS) Clementine Basemap Mosaic compiled from the 750 nm Ultraviolet/Visible Clementine imaging system. Calibration was achieved by removing the image nonuniformity largely caused by the HiRes system's light intensifier. Also provided are offset and scale factors, achieved by a fit of the HiRes data to the corresponding photometrically calibrated UV/Vis basemap that approximately transform the 8-bit HiRes data to photometric units. The mosaics on this CD are compiled from polar data (latitudes greater than 80 degrees), and are presented in the stereographic projection at a scale of 30 m/pixel at the pole, a resolution 5 times greater than that (150 m/pixel) of the corresponding UV/Vis polar basemap. This 5:1 scale ratio is in keeping with the sub-polar mosaic, in which the HiRes and UV/Vis mosaics had scales of 20 m/pixel and 100 m/pixel, respectively. The equal-area property of the stereographic projection made this preferable for the HiRes polar mosaic rather than the basemap's orthographic projection. Thus, a necessary first step in constructing the mosaic was the reprojection of the UV/Vis basemap to the stereographic projection. The HiRes polar data can be naturally grouped according to the orbital periapsis, which was in the south during the first half of the mapping mission and in the north during the second half. Images in each group have generally uniform intrinsic resolution, illumination, exposure and gain. Rather than mingle data from the two periapsis epochs, separate mosaics are provided for each, a total of 4 polar mosaics. The mosaics are divided into 100 square tiles of 2250 pixels (approximately 2.2 deg near the pole) on a side. Not all squares of this grid contain HiRes mosaic data, some inevitably since a square is not a perfect representation of a (latitude) circle, others due to the lack of HiRes data. This CD also contains ancillary data files that support the HiRes mosaic. These files include browse images with UV/Vis context stored in a Joint Photographic Experts Group (JPEG) format, index files ('imgindx.tab' and 'srcindx.tab') that tabulate the contents of the CD, and documentation files. For more information on the contents and organization of the CD volume set refer to the "FILES, DIRECTORIES AND DISK CONTENTS" section of this document. The image files are organized according to NASA's Planetary Data System (PDS) standards. An image file (tile) is organized as a PDS labeled file containing an "image object".

Malin, Michael↗

Clementine High Resolution Camera Mosaicking Project: CL 6021; 80 deg S to 90 deg S Latitude, North Periapsis - Volume 21

This compact disk (CD) is part of the Clementine I high resolution (HiRes) camera lunar image mosaics developed by Malin Space Science Systems (MSSS). These mosaics were developed through calibration and semi-automated registration against the recently released geometrically and photometrically controlled Ultraviolet/Visible (UV/Vis) Basemap Mosaic, which is available through the PDS, as CD-ROM volumes CL_3001-3015. The HiRes mosaics are compiled from non-uniformity corrected, 750 nanometer ("D") filter high resolution observations from the HiRes imaging system onboard the Clementine Spacecraft. The geometric control is provided by the U. S. Geological Survey (USGS) Clementine Basemap Mosaic compiled from the 750 nm Ultraviolet/Visible Clementine imaging system. Calibration was achieved by removing the image nonuniformity largely caused by the HiRes system's light intensifier. Also provided are offset and scale factors, achieved by a fit of the HiRes data to the corresponding photometrically calibrated UV/Vis basemap that approximately transform the 8-bit HiRes data to photometric units. The mosaics on this CD are compiled from polar data (latitudes greater than 80 degrees), and are presented in the stereographic projection at a scale of 30 m/pixel at the pole, a resolution 5 times greater than that (150 m/pixel) of the corresponding UV/Vis polar basemap. This 5:1 scale ratio is in keeping with the sub-polar mosaic, in which the HiRes and UV/Vis mosaics had scales of 20 m/pixel and 100 m/pixel, respectively. The equal-area property of the stereographic projection made this preferable for the HiRes polar mosaic rather than the basemap's orthographic projection. Thus, a necessary first step in constructing the mosaic was the reprojection of the UV/Vis basemap to the stereographic projection. The HiRes polar data can be naturally grouped according to the orbital periapsis, which was in the south during the first half of the mapping mission and in the north during the second half. Images in each group have generally uniform intrinsic resolution, illumination, exposure and gain. Rather than mingle data from the two periapsis epochs, separate mosaics are provided for each, a total of 4 polar mosaics. The mosaics are divided into 100 square tiles of 2250 pixels (approximately 2.2 deg near the pole) on a side. Not all squares of this grid contain HiRes mosaic data, some inevitably since a square is not a perfect representation of a (latitude) circle, others due to the lack of HiRes data. This CD also contains ancillary data files that support the HiRes mosaic. These files include browse images with UV/Vis context stored in a Joint Photographic Experts Group (JPEG) format, index files ('imgindx.tab' and 'srcindx.tab') that tabulate the contents of the CD, and documentation files. For more information on the contents and organization of the CD volume set refer to the "FILES, DIRECTORIES AND DISK CONTENTS" section of this document. The image files are organized according to NASA's Planetary Data System (PDS) standards. An image file (tile) is organized as a PDS labeled file containing an "image object".

Malin, Michael↗

Clementine High Resolution Camera Mosaicking Project: CL 6019; 80 deg N to 90 deg N Latitude, North Periapsis - Volume 19

This compact disk (CD) is part of the Clementine I high resolution (HiRes) camera lunar image mosaics developed by Malin Space Science Systems (MSSS). These mosaics were developed through calibration and semi-automated registration against the recently released geometrically and photometrically controlled Ultraviolet/Visible (UV/Vis) Basemap Mosaic, which is available through the PDS, as CD-ROM volumes CL_3001-3015. The HiRes mosaics are compiled from non-uniformity corrected, 750 nanometer ("D") filter high resolution observations from the HiRes imaging system onboard the Clementine Spacecraft. The geometric control is provided by the U. S. Geological Survey (USGS) Clementine Basemap Mosaic compiled from the 750 nm Ultraviolet/Visible Clementine imaging system. Calibration was achieved by removing the image nonuniformity largely caused by the HiRes system's light intensifier. Also provided are offset and scale factors, achieved by a fit of the HiRes data to the corresponding photometrically calibrated UV/Vis basemap that approximately transform the 8-bit HiRes data to photometric units. The mosaics on this CD are compiled from polar data (latitudes greater than 80 degrees), and are presented in the stereographic projection at a scale of 30 m/pixel at the pole, a resolution 5 times greater than that (150 m/pixel) of the corresponding UV/Vis polar basemap. This 5:1 scale ratio is in keeping with the sub-polar mosaic, in which the HiRes and UV/Vis mosaics had scales of 20 m/pixel and 100 m/pixel, respectively. The equal-area property of the stereographic projection made this preferable for the HiRes polar mosaic rather than the basemap's orthographic projection. Thus, a necessary first step in constructing the mosaic was the reprojection of the UV/Vis basemap to the stereographic projection. The HiRes polar data can be naturally grouped according to the orbital periapsis, which was in the south during the first half of the mapping mission and in the north during the second half. Images in each group have generally uniform intrinsic resolution, illumination, exposure and gain. Rather than mingle data from the two periapsis epochs, separate mosaics are provided for each, a total of 4 polar mosaics. The mosaics are divided into 100 square tiles of 2250 pixels (approximately 2.2 deg near the pole) on a side. Not all squares of this grid contain HiRes mosaic data, some inevitably since a square is not a perfect representation of a (latitude) circle, others due to the lack of HiRes data. This CD also contains ancillary data files that support the HiRes mosaic. These files include browse images with UV/Vis context stored in a Joint Photographic Experts Group (JPEG) format, index files ('imgindx.tab' and 'srcindx.tab') that tabulate the contents of the CD, and documentation files. For more information on the contents and organization of the CD volume set refer to the "FILES, DIRECTORIES AND DISK CONTENTS" section of this document. The image files are organized according to NASA's Planetary Data System (PDS) standards. An image file (tile) is organized as a PDS labeled file containing an "image object".

Malin, Michael↗

Vehicle Assembly Building Fire Mishap Investigation Report. Volume I of V

On January 13, 2005, at approximately 1355, smoke was noticed on the 4th floor of D Tower in the Vehicle Assembly Building (VAB). Subsequently, a 911 call was made, a fire alarm pull station was activated, and the VAB was evacuated. The source of the smoke was determined to be a fire on the Low Bay M/N section roof near the Launch Control Center (LCC) Crossover. Due to the high visibility of the mishap, the KSC Center Director appointed a Mishap Investigation Board. Damage to government property was limited to the roof and a small number of ceiling tiles that were damaged by the fire fighters during the response. At the time of the mishap, there were hazardous commodities in the VAB including Solid Rocket Motors (SRMs) with open grain due to Solid Rocket Booster (SRB) igniter inspections. The Board agrees with the SGS Fire Services' theory that large amounts of smoke concentrated in the VAB D Tower and moved downward into the cable tunnel. The Board determined the proximate cause of this incident to be torching. HRI was installing a torch applied roof membrane which resulted in the ignition of combustible materials under the membrane near a wooden roof expansion joint. The torch applied roofing method is a universally accepted safe industry practice when applied to non-combustible surfaces. The combination of an open flame torch and combustible materiaLs presents an increased level of risk even with skilled applicators. The addition of high winds to this combination results in a risk the Board thinks can not be adequately mitigated. An appropriate risk assessment and analysis must be performed on the proposed roofing method to be used on high visibility facilities which represent unique national assets even when using common industry practices for repair and modification. The Board identified three root causes which contributed to or created the proximate cause and, if eliminated or modified, would have prevented the mishap: 1. Combustible materials in existing roof system 2. Wind speed and direction 3. Inadequate fire watch technique. Two contributing factors were identified which may have contributed to the occurrence but, if eliminated or modified, would not have prevented the occurrence: 1. HRI rushed to dry in and seal the roof on January 13 because heavy rain was predicted for the next day 2. No guidance on torching in windy conditions A total of 17 significant observations were noted during this investigation, which could lead to another mishap, or increase the severity of a mishap, but were not contributing factors in this mishap.

Kight, Ira↗

The Namibia Early Flood Warning System, A CEOS Pilot Project

Over the past year few years, an international collaboration has developed a pilot project under the auspices of Committee on Earth Observation Satellite (CEOS) Disasters team. The overall team consists of civilian satellite agencies. For this pilot effort, the development team consists of NASA, Canadian Space Agency, Univ. of Maryland, Univ. of Colorado, Univ. of Oklahoma, Ukraine Space Research Institute and Joint Research Center(JRC) for European Commission. This development team collaborates with regional , national and international agencies to deliver end-to-end disaster coverage. In particular, the team in collaborating on this effort with the Namibia Department of Hydrology to begin in Namibia . However, the ultimate goal is to expand the functionality to provide early warning over the South Africa region. The initial collaboration was initiated by United Nations Office of Outer Space Affairs and CEOS Working Group for Information Systems and Services (WGISS). The initial driver was to demonstrate international interoperability using various space agency sensors and models along with regional in-situ ground sensors. In 2010, the team created a preliminary semi-manual system to demonstrate moving and combining key data streams and delivering the data to the Namibia Department of Hydrology during their flood season which typically is January through April. In this pilot, a variety of moderate resolution and high resolution satellite flood imagery was rapidly delivered and used in conjunction with flood predictive models in Namibia. This was collected in conjunction with ground measurements and was used to examine how to create a customized flood early warning system. During the first year, the team made use of SensorWeb technology to gather various sensor data which was used to monitor flood waves traveling down basins originating in Angola, but eventually flooding villages in Namibia. The team made use of standardized interfaces such as those articulated under the Open Cloud Consortium (OGC) Sensor Web Enablement (SWE) set of web services was good [1][2]. However, it was discovered that in order to make a system like this functional, there were many performance issues. Data sets were large and located in a variety of location behind firewalls and had to be accessed across open networks, so security was an issue. Furthermore, the network access acted as bottleneck to transfer map products to where they are needed. Finally, during disasters, many users and computer processes act in parallel and thus it was very easy to overload the single string of computers stitched together in a virtual system that was initially developed. To address some of these performance issues, the team partnered with the Open Cloud Consortium (OCC) who supplied a Computation Cloud located at the University of Illinois at Chicago and some manpower to administer this Cloud. The Flood SensorWeb [3] system was interfaced to the Cloud to provide a high performance user interface and product development engine. Figure 1 shows the functional diagram of the Flood SensorWeb. Figure 2 shows some of the functionality of the Computation Cloud that was integrated. A significant portion of the original system was ported to the Cloud and during the past year, technical issues were resolved which included web access to the Cloud, security over the open Internet, beginning experiments on how to handle surge capacity by using the virtual machines in the cloud in parallel, using tiling techniques to render large data sets as layers on map, interfaces to allow user to customize the data processing/product chain and other performance enhancing techniques. The conclusion reached from the effort and this presentation is that defining the interoperability standards in a small fraction of the work. For example, once open web service standards were defined, many users could not make use of the standards due to security restrictions. Furthermore, once an interoperable sysm is functional, then a surge of users can render a system unusable, especially in the disaster domain.

Mandl, Daniel↗