Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Proton Exchange Membrane Fuel Cell Engineering Model Powerplant. Test Report: Benchmark Tests in Three Spatial Orientations

Proton exchange membrane (PEM) fuel cell technology is the leading candidate to replace the aging alkaline fuel cell technology, currently used on the Shuttle, for future space missions. This test effort marks the final phase of a 5-yr development program that began under the Second Generation Reusable Launch Vehicle (RLV) Program, transitioned into the Next Generation Launch Technologies (NGLT) Program, and continued under Constellation Systems in the Exploration Technology Development Program. Initially, the engineering model (EM) powerplant was evaluated with respect to its performance as compared to acceptance tests carried out at the manufacturer. This was to determine the sensitivity of the powerplant performance to changes in test environment. In addition, a series of tests were performed with the powerplant in the original standard orientation. This report details the continuing EM benchmark test results in three spatial orientations as well as extended duration testing in the mission profile test. The results from these tests verify the applicability of PEM fuel cells for future NASA missions. The specifics of these different tests are described in the following sections.

Loyselle, Patricia↗

Advanced Prototype Fan Operating Experience, Post Test Evaluation, and Refurbishment for PLSS 2.0 Test Use

NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.

Hodgson, Edward↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Rutishauser, David↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully Integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Epp, Chirold D.↗

Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process, nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations, both the Russian and U.S. sides have implemented testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement, and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November. Testing included: (1) a sit-tostand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 min while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness were collected for analysis. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

European Service Module - Structural Test Article (E-STA) Building Block Test Approach and Model Correlation Observations

The Orion European Service Module - Structural Test Article (E-STA) underwent sine vibration testing in 2016 using the Mechanical Vibration Facility (MVF) multi-axis shaker system at NASA Glenn Research Center’s (GRC) Plum Brook Station (PBS) Space Power Facility (SPF). The main objective was to verify the structural integrity of the European Service Module (ESM) under sine sweep dynamic qualification vibration testing. A secondary objective was to perform a fixed-base modal survey, while E-STA was still mounted to MVF, in order to achieve a test correlate the finite element model (FEM). To facilitate the E-STA system level correlation effort, a building block test approach was implemented. Modal tests were performed on two major subassemblies, the crew module/launch abort structure (CM/LAS) and the crew module adapter (CMA) mass simulators. These subassembly FEMs were individually correlated and then integrated into the E-STA FEM prior to the start of the E-STA sine vibration test. This paper summarizes the modal testing and model correlation efforts of both of these subassemblies and how the building block approach assisted in the overall correlation of the E-STA FEM. This paper will also cover modeling practices that should be avoided, recommended instrumentation positioning on complex structures, and the importance of the FEM geometrically matching CAD in sufficient detail in order to adequately replicate internal load paths. The goal of this paper is to inform the reader of the hard earned lessons learned and pitfalls to avoid when applying a building block test approach.

Winkel, James P.↗

Vertical Climb Testing of a Full-Scale Proprotor on the Tiltrotor Test Rig

The Tiltrotor Test Rig (TTR) is a new NASA facility for testing full-scale proprotors. The first test campaign in the National Full-Scale Aerodynamics Facility (NFAC) concluded in November 2018. The wind-tunnel test included vertical climb conditions; that is, axial flow at low airspeeds (true hover is not possible in the NFAC). The rotor tested was the Bell Model 699, a 609 rotor modified specifically for wind-tunnel testing. The rotor was tested under a variety of NFAC configurations, some unprecedented and unique to vertical climb. Researchers must understand the differences in configuration if they are to make proper use of the data. This paper presents results for several different test configurations, including assessments of data quality. Comparisons with earlier tests of a similar rotor, the 0.656- scale Joint Vertical Experimental (JVX) rotor, are included to provide additional insights into rotor and wind tunnel behavior.

Acree, C. W.↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

Research Problems Associated with Limiting the Applied Force in Vibration Tests and Conducting Base-Drive Modal Vibration Tests

The intent of this paper is to make a case for developing and conducting vibration tests which are both realistic and practical (a question of tailoring versus standards). Tests are essential for finding things overlooked in the analyses. The best test is often the most realistic test which can be conducted within the cost and budget constraints. Some standards are essential, but the author believes more in the individual's ingenuity to solve a specific problem than in the application of standards which reduce problems (and technology) to their lowest common denominator. Force limited vibration tests and base-drive modal tests are two examples of realistic, but practical testing approaches. Since both of these approaches are relatively new, a number of interesting research problems exist, and these are emphasized herein.

tests tailored tests cost analysis↗

Shake Test Results and Dynamic Calibration Efforts for the Large Rotor Test Apparatus

Prior to the full-scale wind tunnel test of the UH-60A Airloads rotor, a shake test was completed on the Large Rotor Test Apparatus. The goal of the shake test was to characterize the oscillatory response of the test rig and provide a dynamic calibration of the balance to accurately measure vibratory hub loads. This paper provides a summary of the shake test results, including balance, shaft bending gauge, and accelerometer measurements. Sensitivity to hub mass and angle of attack were investigated during the shake test. Hub mass was found to have an important impact on the vibratory forces and moments measured at the balance, especially near the UH-60A 4/rev frequency. Comparisons were made between the accelerometer data and an existing finite-element model, showing agreement on mode shapes, but not on natural frequencies. Finally, the results of a simple dynamic calibration are presented, showing the effects of changes in hub mass. The results show that the shake test data can be used to correct in-plane loads measurements up to 10 Hz and normal loads up to 30 Hz.

Large Rotor Test Apparatus↗

High-Speed Wind Tunnel Tests of a Full-Scale Proprotor on the Tiltrotor Test Rig

The Tiltrotor Test Rig (TTR) is a NASA project, joint with the U.S. Army and Air Force, to develop a new, large scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The first wind-tunnel entry was completed in November 2018 with a modern, 26-ft diameter proprotor. The primary purpose was to complete the development of the TTR, including systems integration with the NFAC. The TTR and rotor were tested up to 273 knots in axial flow. This is the highest airspeed ever achieved by a full-scale proprotor in any wind tunnel. Extensive conversion-mode data were also acquired, and hover/climb conditions were explored. Additional testing included aerodynamic tares, motor tests, thermal tests, modal vibration tests, and other checkout activities. This paper summarizes the results of the test, including examples of the most significant data.

Wind Tunnel Tests↗

A Summary of Test Results from a NASA Lift + Cruise eVTOL Crash Test

On November 9, 2022, the National Aeronautics and Space Administration (NASA) conducted a full-scale crash test of the NASA Lift+Cruise (LPC) reference vehicle at the NASA Langley Research Center Landing and Impact Research Facility (LandIR) under combined vertical and horizontal impact conditions to simulate a severe but survivable crash. The LPC test article is a carbon-composite skin/frame structure design, developed and fabricated for the cabin section only. The test utilized various configurations of seats and Anthropomorphic Test Devices (ATDs, a.k.a. crash test dummies) intended to encompass a variety of occupant conditions. In addition, an in-house developed energy absorbing subfloor was utilized for the evaluation of load attenuation. Overhead mass was simulated using attached lifting hardware and other systems were simulated using ballast mass. The test article impacted the ground with velocities of 38.1 ft/s horizontal and 31.4 ft/s vertical. During the first approximately 38 milliseconds (ms), the cabin section experienced a large amount of acceleration on the belly which was attenuated by the subfloor structures and seats. Over the next approximately 160 ms, the test article experienced failure in the a-, b- and c-pillars, leading to a partial collapse of the overhead structure. Test data was collected on the belly, floors, seats, overhead mass, and tail. In addition, there was high speed full-field digital image correlation analysis data collected on the port side skin surface. Collected ATD data showed that the ATDs seated in the energy absorbing seats experienced loads at limits below the those in current regulations. Even without an energy absorbing seat, the energy absorbing subfloors crushed as intended, and limited the load on the large 95 th percentile ATD to 10% over suggested limits. The collapse of the roof did affect the 95 th percentile ATD, which showed high neck loading values due to head contact, whereas survivable volume was maintained for the other ATDs. While the energy absorbing subfloor and energy absorbing seats both contributed to occupant load attenuation, further optimization is suggested to increase their robustness.

evtol↗

A Summary of Test Results from a NASA Lift + Cruise eVTOL Crash Test

On November 9, 2022, the National Aeronautics and Space Administration (NASA) conducted a full-scale crash test of the NASA Lift+Cruise (LPC) reference vehicle at the NASA Langley Research Center Landing and Impact Research Facility (LandIR) under combined vertical and horizontal impact conditions to simulate a severe but survivable crash. The LPC test article is a carbon-composite skin/frame structure design, developed and fabricated for the cabin section only. The test utilized various configurations of seats and Anthropomorphic Test Devices (ATDs, a.k.a. crash test dummies) intended to encompass a variety of occupant conditions. In addition, an in-house developed energy absorbing subfloor was utilized for the evaluation of load attenuation. Overhead mass was simulated using attached lifting hardware and other systems were simulated using ballast mass. The test article impacted the ground with velocities of 38.1 ft/s horizontal and 31.4 ft/s vertical. During the first approximately 38 milliseconds (ms), the cabin section experienced a large amount of acceleration on the belly which was attenuated by the subfloor structures and seats. Over the next approximately 160 ms, the test article experienced failure in the a-, b- and c-pillars, leading to a partial collapse of the overhead structure. Test data was collected on the belly, floors, seats, overhead mass, and tail. In addition, there was high speed full-field digital image correlation analysis data collected on the port side skin surface. Collected ATD data showed that the ATDs seated in the energy absorbing seats experienced loads at limits below the those in current regulations. Even without an energy absorbing seat, the energy absorbing subfloors crushed as intended, and limited the load on the large 95 th percentile ATD to 10% over suggested limits. The collapse of the roof did affect the 95 th percentile ATD, which showed high neck loading values due to head contact, whereas survivable volume was maintained for the other ATDs. While the energy absorbing subfloor and energy absorbing seats both contributed to occupant load attenuation, further optimization is suggested to increase their robustness.

evtol↗

Scalable Asset Discovery, Vulnerability Scanning, and Penetration Testing for Remote Sites and Wireless Spectrums Utilizing an Embedded Linux Plug - PwniPlug and the Raspberry Pi B+ as a Sample Pen Test

All devices attached to the NASA KSC network are subject to security vulnerability scanning and/or penetration testing. In today's changing environment, vulnerable and/or unprotected systems can easily be overlooked. Systems that are not properly managed can become a potential threat to the operational integrity of our systems and networks. This includes all NASA (internal and external) information systems within NASA KSC Internet Protocol (IP) address space, and NASA KSC facilities. The Office of the Chief Information Officer (OCIO) recommends that all NASA Centers and information systems be subject to penetration testing on a regular interval in accordance with the guidelines identified by the National Institute of Standards and Technology (NIST). (ITS-HBK-2810.04-02A) Protecting information and equipment at NASA is an area of increasing concern. In addition to the CPU's on the network; Supervisory, Control and Data Acquisition (SCADA) systems are especially vulnerable because these systems have lacked standards, use embedded controllers with little computational power and informal software, are connected to physical processes, have few operators, and are increasingly also being connected to corporate networks. The scope of work is comprised of several individual components which together build upon previous work by Drew Branch, NASA KSC Intern. The Pwn Plug is the selected COTS (Commercial-Off-The-Shelf) device chosen to test simplification of mandatory IT Security tasks. The device will be utilized to provide services to NASA KSC and enable an assessment of infrastructure soundness and regulatory compliance in an efficient, economical, and business responsive manner. The Pwn Plug is designed as a pen testing appliance which provides a hardware platform that can support commercial penetration testing efforts at significantly reduced costs. The expected outcomes are: 1) External Penetration Testing, 2) Social Engineering, 3) Procedural Documentation, 4) Recommended Remediation Action Plan, 5) System Retest & Remediation Attestation and 6) Final Reports, out briefing and Presentation. Due to physical and material constraints beyond intern and mentor control, the project was redefined as a working pen-test scenario. Limitations of lab availability and tools dictated an academic exercise. This report was developed within the scenario guidelines suggested by the project mentor. The guidelines were to be creative in developing a Pen Test program for a client.

Penetration Testing↗

Integrated Test and Evaluation (ITE) Flight Test Series 4

The integrated Flight Test 4 (FT4) will gather data for the UAS researchers Sense and Avoid systems (referred to as Detect and Avoid in the RTCA SC 228 ToR) algorithms and pilot displays for candidate UAS systems in a relevant environment. The technical goals of FT4 are to: 1) perform end-to-end traffic encounter test of pilot guidance generated by DAA algorithms; 2) collect data to inform the initial Minimum Operational Performance Standards (MOPS) for Detect and Avoid systems. FT4 objectives and test infrastructure builds from previous UAS project simulations and flight tests. NASA Ames (ARC), NASA Armstrong (AFRC), and NASA Langley (LaRC) Research Centers will share responsibility for conducting the tests, each providing a test lab and critical functionality. UAS-NAS project support and participation on the 2014 flight test of ACAS Xu and DAA Self Separation (SS) significantly contributed to building up infrastructure and procedures for FT3 as well. The DAA Scripted flight test (FT4) will be conducted out of NASA Armstrong over an eight-week period beginning in April 2016.

ITE↗

Shake Test Results and Dynamic Characterization of the Large Rotor Test Apparatus in the NFAC 40- by 80-Foot Wind Tunnel

Prior to the full-scale wind tunnel test of the UH-60A Airloads rotor, a shake test was completed on the Large Rotor Test Apparatus. The goal of the shake test was to characterize the oscillatory response of the test rig and provide a dynamic calibration of the balance to permit accurate measurement of vibratory hub loads. This paper provides a summary of the shake test results, including balance, shaft bending gauge, and accelerometer measurements. Sensitivity to hub mass and angle of attack were investigated during the shake test. Hub mass was found to have an important impact on the vibratory forces and moments measured at the balance, especially near the UH-60A 4/rev frequency. Comparisons were made between the accelerometer data and an existing finite-element model, showing agreement on mode shapes, but not on natural frequencies. The results suggest that the shake test data can be used to correct in-plane loads measurements up to 10 Hz and normal loads up to 30 Hz.

Shake Test↗

Test Capabilities of the NASA Langley Direct Connect Supersonic Combustion Test Facility with Historical Perspective

In 1969, a combustion-heated direct-connect test facility was assembled at the NASA Langley Research Center to conduct basic research in ramjet and scramjet propulsion systems. The facility was initially used in assessing the mixing, ignition, flame holding, and combustion characteristics of various ramjet and scramjet combustors. Over the years, the facility was updated and modified to conduct increasingly longer and more complicated tests. Today, the facility is known as the Direct Connect Supersonic Combustion Test Facility and is part of the NASA Langley Scramjet Test Complex. More recently, the facility has been used by external customers to test fuel-cooled and uncooled, flight-like test articles. Tests have been conducted at ramjet flight conditions for up to 15 minutes of continuous operation. Even though the facility is nearly 50 years old, it remains a viable and useful tool in the support of various U.S. hypersonic programs.

direct connect test facility↗

The V-3 contamination test of the chamber A facility and a subsequent cryogenic/vacuum study of the V-3 test quartz crystal microbalance

The areas of orbital and ground contamination of flight experiment hardware have been well established. This report relates directly to results of vacuum chamber testing for the ground evaluation of flight experiment hardware performance. First, the data obtained during the V-3 contamination testing in the Johnson Space Center's Chamber A space simulation test facility are presented. Second, during the V-3 contamination tests, the MSFC Space Sciences Laboratory's quartz crystal microbalance exhibited two periods of anomalous readings. Therefore, a subsequent small chamber tests was conducted in a controlled cryogenic/vacuum environment. The objective was to reproduce with known parameters the anomalous behavior patterns of the V-3 test data. Analyses of the anomalous readings are made on the basis of these tests. Additionally, as a by-product of the small chamber tests, calibration curves then existing for the quartz crystal microbalance were empirically extended, and certain data-formatting aids were documented.

Moore, W. W., Jr.↗