At least 163 records · Page 9

Computational and Experimental Examination of Simulated Core Damage and Relocation Dynamics of a BWR Fuel Assembly - 16013

The Japan Atomic Energy Agency (JAEA) plans a large-scale test to evaluate damage and relocation behavior of Boiling Water Reactor (BWR) core materials consisting of fuel rods (zirconia as fuel simulant), channel boxes, control blade assemblies as well as lower core-support structures. Its purpose is to contribute to the understanding of the core material relocation behavior in the event of severe accidents with the BWR design conditions for which existing experimental database is quite limited. Prior to large-scale testing anticipated at JAEA in the future, JAEA desires preliminary investigations to examine melting test pieces, being composed of a mixture of zirconia and metals by a non-transferred thermal plasma heating system. The purpose of such tests is to verify the materials and test piece will be heated by plasma as a primary heat source to the target temperature of ca. 2900 K and to collect data about the relocation behavior of the high-temperature materials. This paper describes the first in a series of tests demonstrating the effective use of thermal plasma technology to recreate the dynamics of a typical fuel core bundle channel assembly section. Results from preliminary computational simulations of simplified fuel bundle assemblies are presented illustrating the effectiveness of a 150 kW, non transferred (NTR) configuration of a thermal plasma argon jet to heat the assembly within a highly-insulated containment vessel. An experimental test program using the computational analyses as a basis and a Phoenix Solutions Co (PSC) commercial model PT150, 150 kW plasma torch is described and the test results are presented illustrating the time versus temperature history of the fuel bundle assembly melting dynamics. Details on plasma operation are discussed including: power requirements, current flow, voltage levels achieved, argon gas flow rates, processing times and standoff distances of the torch discharge from the top of the fuel bundle assembly (achieved with remote control of the axial (vertical) translation of the torch within the containment processing chamber). Photos taken from the top of the processing chamber are presented illustrating the various phases of melting characteristics of the zircaloy-clad, zirconium oxide filled fuel tubes, all within a stainless steel tube bundle channel centered within an insulated zirconia crucible. Based on lessons learned from this initial test campaign, a brief discussion of the requirements and features of a follow-on Phase II test program is provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline Radiological Conditions for the Transient Reactor Test (TREAT) Restart

The Transient Reactor Test (TREAT) facility, located on the Idaho National Laboratory (INL), northwest of the Materials and Fuels Complex (MFC), has been in programmatic shutdown for more than twenty-three years. Construction of TREAT by the Teller Construction Co., Portland, Oregon, was started in February, 1958, and completed in early November, 1958. The reactor first achieved criticality on February 23, 1959. Operations continued until April 28, 1994, when the reactor was shut down due to the lack of a programmatic mission. Recently, the U.S. Department of Energy (DOE) identified a need to resume transient testing of new reactor fuels. The Resumption of Transient Testing Program (RTTP) has readied the TREAT facility to resume transient testing operations. The first reactor criticality since the shut down in 1994 was achieved on November 14, 2017. This report details the radiological measurements taken in the TREAT Reactor Building and the surrounding environment prior to and just after its restart in order to characterize the radiological conditions that existed prior to and during the initial restart operations. The authors would like to acknowledge the support from RTTP Management and the TREAT Operations staff for allowing the extensive radiological surveys, as well as the health physics technicians from the INL Radiological Control organization who performed many of the measurements referenced in this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Characterization, Leaching, and Filtration Testing for Tributyl Phosphate (TBP, Group 7) Actual Waste Sample Composites

.A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. The actual waste-testing program included homogenizing the samples by group, characterizing the solids and aqueous phases, and performing parametric leaching tests. The tributyl phosphate sludge (TBP, Group 7) is the subject of this report. The Group 7 waste was anticipated to be high in phosphorus as well as aluminum in the form of gibbsite. Both are believed to exist in sufficient quantities in the Group 7 waste to address leaching behavior. Thus, the focus of the Group 7 testing was on the removal of both P and Al. The waste-type definition, archived sample conditions, homogenization activities, characterization (physical, chemical, radioisotope, and crystal habit), and caustic leaching behavior as functions of time, temperature, and hydroxide concentration are discussed in this report. Testing was conducted according to TP-RPP-WTP-467.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US Nuclear Testing: Health Consequences and Policy Decisions

With the approval of President Franklin D. Roosevelt to begin the research on a nuclear bomb in 1941 to the last test conducted by the U.S. in 1992, the fifty-year history of the nuclear weapons testing program has been an expansive topic of research. The program's growth is credited to the race to build the first atomic weapon for war. The termination of the Soviet Union and many other factors, including concerns about the adverse health effects of radioactive fallout, influenced the decline of the need for the program. The discovery of the negative health effects caused by low-level radiation and the subsequent studies influenced sitting U.S. presidents in passing policies that significantly impacted the nuclear weapons testing program.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

LANL Phase 3 Container Loading in Support of the Fire-Induced Pressure Response and Failure Characterization of PCV/SCV/3013 Containers

The PCV/SCV/3013 Thermal Test Program is intended to determine the pressure response of packaged 3013 containers when exposed to a facility fire in the K-Area Complex (KAC) at the Savannah River Site. The fire tests support the KAC safety basis and must be bounding of the maximum pressure that would result from any 3013 container exposed to a KAC facility fire. The testing program has the following objectives: “To increase understanding of the pressure and temperature conditions at which failure occurs; To determine the allowable moisture for which failure will not occur under specified fire conditions, and; To increase understanding regarding the effects of salts on the pressurization, corrosion, and potential failure of the container.”

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oxy-Combustion Boiler Material Development

Under U.S. Department of Energy Cooperative Agreement No. DE-NT0005262 Foster Wheeler North America Corp conducted a laboratory test program to determine the effect of oxy-combustion on boiler tube corrosion. In this program, CFD modeling was used to predict the gas compositions that will exist throughout and along the walls of air-fired and oxy-fired boilers operating with low to high sulfur coals. Test coupons of boiler tube materials were coated with deposits representative of those coals and exposed to the CFD predicted flue gases for up to 1000 hours. The tests were conducted in electric tube furnaces using oxy-combustion and air-fired flue gases synthesized from pressurized cylinders. Following exposure, the test coupons were evaluated to determine the total metal wastage experienced under air and oxy-combustions conditions and materials recommendations were made. Similar to air-fired operation, oxy-combustion corrosion rates were found to vary with the boiler material, test temperature, deposit composition, and gas composition. Despite this, comparison of air-fired and oxy-fired corrosion rates showed that oxy-firing rates were, for the most part, similar to, if not lower than those of air-firing; this finding applied to the seven furnace waterwall materials (wrought and weld overlay) and the ten superheater/reheater materials (wrought and weld overlay) that were tested. The results of the laboratory oxy-combustion tests, which are based on a maximum bulk flue gas SO 2 level of 3200 ppmv (wet) / 4050 ppmv (dry), suggest that, from a corrosion standpoint, the materials used in conventional subcritical and supercritical, air-fired boilers should also be suitable for oxy-combustion retrofits. Although the laboratory test results are encouraging, they are only the first step of a material evaluation process and it is recommended that follow-on corrosion tests be conducted in coal-fired boilers operating under oxy-combustion to provide longer term (one to two year) data. The test program details and data are presented herein.

20 FOSSIL-FUELED POWER PLANTS↗

Oxy-Combustion Boiler Material Development

Under U.S. Department of Energy Cooperative Agreement No. DE-NT0005262 Foster Wheeler North America Corp conducted a laboratory test program to determine the effect of oxy-combustion on boiler tube corrosion. In this program, CFD modeling was used to predict the gas compositions that will exist throughout and along the walls of air-fired and oxy-fired boilers operating with low to high sulfur coals. Test coupons of boiler tube materials were coated with deposits representative of those coals and exposed to the CFD predicted flue gases for up to 1000 hours. The tests were conducted in electric tube furnaces using oxy-combustion and air-fired flue gases synthesized from pressurized cylinders. Following exposure, the test coupons were evaluated to determine the total metal wastage experienced under air and oxy-combustions conditions and materials recommendations were made. Similar to air-fired operation, oxy-combustion corrosion rates were found to vary with the boiler material, test temperature, deposit composition, and gas composition. Despite this, comparison of air-fired and oxy-fired corrosion rates showed that oxy-firing rates were, for the most part, similar to, if not lower than those of air-firing; this finding applied to the seven furnace waterwall materials (wrought and weld overlay) and the ten superheater/reheater materials (wrought and weld overlay) that were tested. The results of the laboratory oxy-combustion tests, which are based on a maximum bulk flue gas SO2 level of 3200 ppmv (wet) / 4050 ppmv (dry), suggest that, from a corrosion standpoint, the materials used in conventional subcritical and supercritical, air-fired boilers should also be suitable for oxy-combustion retrofits. Although the laboratory test results are encouraging, they are only the first step of a material evaluation process and it is recommended that follow-on corrosion tests be conducted in coal-fired boilers operating under oxy-combustion to provide longer term (one to two year) data. The test program details and data are presented herein.

36 MATERIALS SCIENCE↗

Regulatory Gap Analysis of Select NUREG-0800 Chapters for Applicability to Molten Salt Reactors

The past licensing approach for advanced reactors was based on adapting the current LWR-based NRC process that exists today to the advanced reactor concept. This is the approach used by advanced technologies such as the Pebble Bed Reactor licensing application, the Clinch River Breeder Reactor licensing application, and more recently the NuScale licensing application. Current Standard Review Plan (SRP) guidance for large LWRs is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: Light Water Reactor (LWR) Edition. However, the SRP is cumbersome to apply to liquid-fueled molten salt reactor (MSR) technologies. Therefore, a thoughtful licensing approach for MSRs is necessary.This report documents for DOE-NE an additional regulatory gap analysis of select chapters from the LWR SRP to further inform a generic nonpower MSR test program. Although the review process outlined in NUREG-0800 is LWR-specific, the plant functions and processes to be reviewed will be similar for the MSR. Therefore, a well-planned nonpower MSR test program can provide the performance data needed to better facilitate the eventual commercial-sized MSR review. The LWR SRP chapters dealing with the reactor, reactor coolant, engineered safety features, auxiliary systems, and waste management systems were reviewed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Advanced Fuel Cycle Technology: Special Session in Honor of Dr. Michael Lineberry

The US DOE recently initiated an effort to develop accident tolerant fuel designs for potential use in commercial power reactors. Evaluation of various fuel design concepts will require a broad array of testing that will include performance attributes at both steady state and transient irradiation conditions. The first stage of the transient testing program is intended to establish the relative performance limits of each proposed concept and to support development of first-draft fuel performance models. It is anticipated that this data can subsequently be used as the basis for larger scale qualification testing. This initial stage of the testing program is outlined in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep Vadose Zone Treatability Test of Soil Desiccation for the Hanford Central Plateau: Final Report

Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths where direct exposure pathways are not of concern, but may need to be remediated to protect groundwater. The Department of Energy developed a treatability test program for technologies to address Tc-99 and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment, have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. The treatability test of desiccation described herein was conducted as an element of the deep vadose zone treatability test program. Desiccation was shown to be a potentially effective vadose zone remediation technology to protect groundwater when used in conjunction with a surface infiltration barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Combined Cyclone and Gas Filtration System for Particulate Removal in the Gasification Process

The Wabash gasification facility, owned and operated by sgSolutions LLC, is one of the largest single train solid fuel gasification facilities in the world capable of transforming 2,000 tons per day of petroleum coke or 2,600 tons per day of bituminous coal into synthetic gas for electrical power generation. The Wabash plant utilizes Phillips66 proprietary E-Gas™ Gasification Process to convert solid fuels such as petroleum coke or coal into synthetic gas that is fed to a combined cycle combustion turbine power generation facility. During plant startup in 1995, reliability issues were realized in the gas filtration portion of the gasification process. To address these issues, a slipstream test unit was constructed at the Wabash facility to test various filter designs, materials and process conditions for potential reliability improvement. The char filtration slipstream unit provided a way of testing new materials, maintenance procedures, and process changes without the risk of stopping commercial production in the facility. It also greatly reduced maintenance expenditures associated with full scale testing in the commercial plant. This char filtration slipstream unit was installed with assistance from the United States Department of Energy (built under DOE Contract No. DE-FC26-97FT34158) and began initial testing in November of 1997. It has proven to be extremely beneficial in the advancement of the E-Gas™ char removal technology by accurately predicting filter behavior and potential failure mechanisms that would occur in the commercial process. After completing four (4) years of testing various filter types and configurations on numerous gasification feed stocks, a decision was made to investigate the economic and reliability effects of using a particulate removal gas cyclone upstream of the current gas filtration unit. A paper study had indicated that there was a real potential to lower both installed capital and operating costs by implementing a char cyclone-filtration hybrid unit in the E-Gas™ gasification process. These reductions would help to keep the E-Gas™ technology competitive among other coal-fired power generation technologies. The Wabash combined cyclone and gas filtration slipstream test program was developed to provide design information, equipment specification and process control parameters of a hybrid cyclone and candle filter particulate removal system in the E-Gas™ gasification process that would provide the optimum performance and reliability for future commercial use. The test program objectives were as follows: 1. Evaluate the use of various cyclone materials of construction; 2. Establish the optimal cyclone efficiency that provides stable long term gas filter operation; 3. Determine the particle size distribution of the char separated by both the cyclone and candle filters. This will provide insight into cyclone efficiency and potential future plant design; 4. Determine the optimum filter media size requirements for the cyclone-filtration hybrid unit; 5. Determine the appropriate char transfer rates for both the cyclone and filtration portions of the hybrid unit; 6. Develop operating procedures for the cyclone-filtration hybrid unit; and, 7. Compare the installed capital cost of a scaled-up commercial cyclone-filtration hybrid unit to the current gas filtration design without a cyclone unit, such as currently exists at the Wabash facility.

01 COAL, LIGNITE, AND PEAT↗

A Critical Review of High Burnup Fuel Fragmentation, Relocation, and Dispersal under Loss-Of-Coolant Accident Conditions

High burnup fuel in excess of ~6268 GWd/MTU has been observed to severely fragment when subjected to temperature transient conditions as in a loss-of-coolant accident. In the event of cladding failure, the severely fragmented fuel can relocate into the balloon region and potentially disperse through the burst opening into the reactor’s primary system. This observation has led to implementation of several independent test programs designed to focus on various aspects of fuel fragmentation, relocation, and dispersal. The purpose of this review is to perform a critical, holistic assessment of fuel fragmentation, relocation, and dispersal under loss-of-coolant conditions to identify data gaps in the experimental data base. Phenomena have been identified and well defined through the various testing programs, and general agreement regarding the governing parameters (temperature, burnup, heating rate, cladding deformation, etc.) has been established. However, there is a significant data gap connecting research to commercial application. Furthermore, previous research attempted to evaluate the problem holistically, but has yet to provide a comprehensive understanding of the problem. Major identified data gaps consist of (1) a comprehensive understanding of pretransient fuel rod conditions (fuel temperature, fuel stress, rod internal pressures, microstructure, etc.), (2) definition of prototypic loss-of-coolant accident conditions (heating rate, fuel temperatures, fuel stress), (3) identification of the differences between nuclear and electrical integral loss-of-coolant accident tests, and connection of fuel rod performance (cladding ballooning, burst opening, potential relocation, fragmentation susceptibility, etc.) to fuel fragmentation, relocation, and dispersal severity. Finally, the content of this manuscript provides a clear path for connecting testing and data acquisition to commercial application by providing concrete means for filling data gaps and prioritized testing regimes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Underground test coordination at the waste isolation pilot plant - 15229

Underground test coordination is a critical component of safe and efficient conduct of testing operations in a working underground research laboratory (URL). This is particularly important when planning and implementing large, multi-organizational field-scale test programs, when the URL is co-located with an operating repository, or when the host facility, such as the Waste Isolation Pilot Plant (WIPP), is recovering from off-normal events. As such, the Department of Energy Carlsbad Field Office developed an Integrated Project Team (IPT) charter in late 2013 establishing the WIPP underground Test Coordination Office (TCO). The IPT was established to ensure that underground science activities are coordinated, implemented, and managed in an integrated, consistent, efficient, cost-effective, safe, and environmentally compliant manner that maintains quality assurance standards. This is done while ensuring testing operations do not interfere with the WIPP's primary mission, the disposal of transuranic (TRU) waste, and at present, the recovery of WIPP operations. This paper reports the current status of the WIPP underground science and testing programs within the framework of the WIPP stabilization and recovery activities and describes the role of the TCO for current activities as well as for the long-term success of an underground research laboratory. As a result of the underground fire and radiological incident of early February 2014, during this recent period of WIPP recovery, the TCO is ensuring the requirements of the scientific programs are met and that work activities are planned and implemented in compliance with enhanced work control processes and corrective actions imposed at WIPP. This paper addresses the impacts of the accidents at WIPP on the many science experiments that were in process when the events occurred. It presents the plans for their recovery in concert with WIPP's recovery plans, and summarizes the impacts of new underground processes and procedures that will be imposed on the science work as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report: LAW Simulant Development for Cast Stone Screening Test

More than 56 million gallons of radioactive and hazardous waste are stored in 177 underground storage tanks at the U.S. Department of Energy’s (DOE’s) Hanford Site in southeastern Washington State. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the wastes and immobilize them in a glass waste form. The WTP includes a pretreatment facility to separate the wastes into a small volume of high-level waste (HLW) containing most of the radioactivity and a larger volume of low-activity waste (LAW) containing most of the nonradioactive chemicals. The HLW will be converted to glass in the HLW vitrification facility for ultimate disposal at an offsite federal repository. At least a portion (~35%) of the LAW will be converted to glass in the LAW vitrification facility and will be disposed of onsite at the Integrated Disposal Facility (IDF). The pretreatment and HLW vitrification facilities will have the capacity to treat and immobilize the wastes destined for each facility. However, a second facility will be needed for the expected volume of additional LAW requiring immobilization. A cementitious waste form known as Cast Stone is being considered to provide the required additional LAW immobilization capacity. The Cast Stone waste form must be acceptable for disposal in the IDF. The Cast Stone waste form and immobilization process must be tested to demonstrate that the final Cast Stone waste form can comply with waste acceptance criteria for the IDF disposal facility and that the immobilization processes can be controlled to consistently provide an acceptable waste form product. Further, the waste form must be tested to provide the technical basis for understanding the long term performance of the waste form in the IDF disposal environment. These waste form performance data are needed to support risk assessment and performance assessment (PA) analyses of the long-term environmental impact of the waste disposal in the IDF. A testing program was developed in fiscal year (FY) 2012 describing in some detail the work needed to develop and qualify Cast Stone as a waste form for the solidification of Hanford LAW (Westsik et al. 2012). Included within Westsik et al. (2012) is a section on the near-term needs to address Tri-Party Agreement Milestone M-062-40ZZ. The objectives of the testing program to be conducted in FY 2013 and FY 2014 are to: • Determine an acceptable formulation for the LAW Cast Stone waste form. • Evaluate sources of dry materials for preparing the LAW Cast Stone. • Demonstrate the robustness of the Cast Stone waste form for a range of LAW compositions. • Demonstrate the robustness of the formulation for variability in the Cast Stone process. • Provide Cast Stone contaminant release data for PA and risk assessment evaluations. The first step in determining an acceptable formulation for the LAW Cast Stone waste form is to conduct screening tests to examine expected ranges in pretreated LAW composition, waste stream concentrations, dry-materials sources, and mix ratios of waste feed to dry blend. A statistically designed test matrix will be used to evaluate the effects of these key parameters on the properties of the Cast Stone as it is initially prepared and after curing. The second phase of testing will focus on selection of a baseline Cast Stone formulation for LAW and demonstrating that Cast Stone can meet expected waste form requirements for disposal in the IDF. It is expected that this testing will use the results of the screening tests to define a smaller suite of tests to refine the composition of the baseline Cast Stone formulation (e.g. waste concentration, water to dry mix ratio, waste loading).

Russell, Renee L.↗

Nuclear Weapons and the Atmospheric Test Era

The era of atmospheric testing defies a simple description. Beginning with the goal of proving fission, the United States’ test program grew in complexity as scientists explored thermonuclear reactions, met the military demand for a variety of weapons for an increasing number of delivery platforms, and reacted to the ever-growing public fear of fallout. And, of course, political considerations were always present, first in the prosecution of World War II and later in the Cold War. To understand the atmospheric test program, then, is to understand how science, politics, and the public shaped our society in ways that are still difficult to fully understand.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Predictable SCR co-benefits for mercury control

A test program, performed in cooperation with Dominion Power and the Babcock and Wilcox Co., was executed at Dominion Power's Mount Storm power plant in Grant County, W. Va. The program was focused on both the selective catalytic reduction (SCR) catalyst capability to oxide mercury as well as the scrubber's capability to capture and retain the oxidized mercury. This article focuses on the SCR catalyst performance aspects. The Mount Storm site consists of three units totaling approximately 1,660 MW. All units are equipped with SCR systems for NOx control. A full-scale test to evaluate the effect of the SCR was performed on Unit 2, a 550 MWT-fired boiler firing a medium sulfur bituminous coal. This test program demonstrated that the presence of an SCR catalyst can significantly affect the mercury speciation profile. Observation showed that in the absence of an SCR catalyst, the extent of oxidation of element a mercury at the inlet of the flue gas desulfurization system was about 64%. The presence of a Cornertech SCR catalyst improved this oxidation to levels greater than 95% almost all of which was captured by the downstream wet FGD system. Cornertech's proprietary SCR Hg oxidation model was used to accurately predict the field results. 1 ref., 2 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

Cable Diagnostic Focused Initiative

This report summarizes an extensive effort made to understand how to effectively use the various diagnostic technologies to establish the condition of medium voltage underground cable circuits. These circuits make up an extensive portion of the electric delivery infrastructure in the United States. Much of this infrastructure is old and experiencing unacceptable failure rates. By deploying efficient diagnostic testing programs, electric utilities can replace or repair circuits that are about to fail, providing an optimal approach to improving electric system reliability. This is an intrinsically complex topic. Underground cable systems are not homogeneous. Cable circuits often contain multiple branches with different cable designs and a range of insulation materials. In addition, each insulation material ages differently as a function of time, temperature and operating environment. To complicate matters further, there are a wide variety of diagnostic technologies available for assessing the condition of cable circuits with a diversity of claims about the effectiveness of each approach. As a result, the benefits of deploying cable diagnostic testing programs have been difficult to establish, leading many utilities to avoid the their use altogether. This project was designed to help address these issues. The information provided is the result of a collaborative effort between Georgia Tech NEETRAC staff, Georgia Tech academic faculty, electric utility industry participants, as well as cable system diagnostic testing service providers and test equipment providers. Report topics include: •How cable systems age and fail, •The various technologies available for detecting potential failure sites, •The advantages and disadvantages of different diagnostic technologies, •Different approaches for utilities to employ cable system diagnostics. The primary deliverables of this project are this report, a Cable Diagnostic Handbook (a subset of this report) and an online knowledge based system (KBS) that helps utilities select the most effective diagnostic technologies for a given cable circuit and circuit conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗