Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Current Scientific Progress and Future Scientific Prospects Enabled by Spaceborne Precipitation Radar Measurements

First, we examine current scientific progress and understanding that have been possible through use of spaceborne precipitation radar measurements being provided by the TRMM and CloudSat satellites. Second, we look across a future 20-year time frame to assess how and why anticipated improvements in space radar systems will further advance scientific progress into topic areas once considered beyond the realm of space-based remote sensing. JAXA's 13.8 GHz Ku-band cross-track scanning Precipitation Radar (PR) developed for flight on NASA's non-sun-synchronous, diurnally-precessing TRMM satellite, was the first Earth radar flown in space that was designed specifically for precipitation measurement. Its proven accuracy in measuring global rainfall in the tropics and sub-tropics and its unanticipated longevity in continuing these measurements beyond a full decade have established the standards against which all follow-up and future space radars will be evaluated. In regards to the current PR measurement time series, we will discuss a selection of major scientific discoveries and impacts which have set the stage for future radar measuring systems. In fact, the 2nd contemporary space radar applicable for terrestrial precipitation measurement, i.e., JPL-CSA's 94 GHz nadir-staring Cloud Profiling Radar (CPR) flown on NASA's sun-synchronous CloudSat satellite, although designed primarily for measurement of non-precipitating cloud hydrometeors and aerosols, has also unquestionably advanced precipitation measurement because CPR's higher frequency and greatly increased sensitivity (approximately 30 dBZ) has enabled global observations of light rain rate spectrum processes (i.e., rain rates below 0.05 mm per hourand of precipitation processes in the high troposphere (particularly ice phase processes). These processes are beyond reach of the TRMM radar because the PR sensitivity limit is approximately 17 dBZ which means its lower rain rate cutoff is around 0.3 mm per hour and its vertical profiling acuity is greatly limited above the melting layer. Thus, the newer CPR measurements have become important for a variety of scientific reasons that will be highlighted and assessed. In considering scientific progress likely to stem from future precipitation radar systems, we will specifically examine possible scientific impacts from three anticipated missions for which NASA and various of its space agency partners are expected to lead the way. These three missions are: (1) the nearterm Global Precipitation Measuring (GPM) Mission; (2) the decadal timeline Aerosol and Cloud Experiment (ACE) Mission; and the post-decadal timeline NEXRAD in Space (NIS) Mission. The observational capabilities of the planned radar systems for each of these three satellite missions are distinct from each other and each provides progressive improvements in precipitation measuring and scientific research capabilities relative to where we are now -- insofar as TRMM PR and the CloudSat CPR capabilities. The potential innovations in scientific research will be discussed in a framework of likely synergisms between next-generation radar capabilities and accessible dynamical and microphysical properties that have heretofore evaded detection.

Smith, Eric A.↗

Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

Hase, Chris↗

Integration and Testing of the Lunar Reconnaissance Orbiter Attitude Control System

Throughout the Lunar Reconnaissance Orbiter (LRO) Integration and Testing (I&T) phase of the project, the Attitude Control System (ACS) team completed numerous tests on each hardware component in ever more flight like environments. The ACS utilizes a select group of attitude sensors and actuators. This paper chronicles the evolutionary steps taken to verify each component was constantly ready for flight as well as providing invaluable trending experience with the actual hardware. The paper includes a discussion of each ACS hardware component, lessons learned of the various stages of I&T, a discussion of the challenges that are unique to the LRO project, as well as a discussion of work for future missions to consider as part of their I&T plan. LRO ACS sensors were carefully installed, tested, and maintained over the 18 month I&T and prelaunch timeline. Care was taken with the optics of the Adcole Coarse Sun Sensors (CSS) to ensure their critical role in the Safe Hold mode was fulfilled. The use of new CSS stimulators provided the means of testing each CSS sensor independently, in ambient and vacuum conditions as well as over a wide range of thermal temperatures. Extreme bright light sources were also used to test the CSS in ambient conditions. The integration of the two SELEX Galileo Star Trackers was carefully planned and executed. Optical ground support equipment was designed and used often to check the performance of the star trackers throughout I&T in ambient and thermal/vacuum conditions. A late discovery of potential contamination of the star tracker light shades is discussed in this paper. This paper reviews how each time the spacecraft was at a new location and orientation, the Honeywell Miniature Inertial Measurement Unit (MIMU) was checked for data output validity. This gyro compassing test was performed at several key testing points in the timeline as well as several times while LRO was on the launch pad. Sensor alignment tests were completed several times to ensure that hardware remained on a rigid platform.

Simpson, Jim↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

Orion Active Thermal Control System Dynamic Modeling Using Simulink/MATLAB

This paper presents dynamic modeling of the crew exploration vehicle (Orion) active thermal control system (ATCS) using Simulink (Simulink, developed by The MathWorks). The model includes major components in ATCS, such as heat exchangers and radiator panels. The mathematical models of the heat exchanger and radiator are described first. Four different orbits were used to validate the radiator model. The current model results were compared with an independent Thermal Desktop (TD) (Thermal Desktop, PC/CAD-based thermal model builder, developed in Cullimore & Ring (C&R) Technologies) model results and showed good agreement for all orbits. In addition, the Orion ATCS performance was presented for three orbits and the current model results were compared with three sets of solutions- FloCAD (FloCAD, PC/CAD-based thermal/fluid model builder, developed in C&R Technologies) model results, SINDA/FLUINT (SINDA/FLUINT, a generalized thermal/fluid network-style solver ) model results, and independent Simulink model results. For each case, the fluid temperatures at every component on both the crew module and service module sides were plotted and compared. The overall agreement is reasonable for all orbits, with similar behavior and trends for the system. Some discrepancies exist because the control algorithm might vary from model to model. Finally, the ATCS performance for a 45-hr nominal mission timeline was simulated to demonstrate the capability of the model. The results show that the ATCS performs as expected and approximately 2.3 lb water was consumed in the sublimator within the 45 hr timeline before Orion docked at the International Space Station.

Wang, Xiao-Yen J.↗

NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

Letchworth, Gary↗

Intelligent Data Visualization for Cross-Checking Spacecraft System Diagnosis

Any reasoning system is fallible, so crew members and flight controllers must be able to cross-check automated diagnoses of spacecraft or habitat problems by considering alternate diagnoses and analyzing related evidence. Cross-checking improves diagnostic accuracy because people can apply information processing heuristics, pattern recognition techniques, and reasoning methods that the automated diagnostic system may not possess. Over time, cross-checking also enables crew members to become comfortable with how the diagnostic reasoning system performs, so the system can earn the crew s trust. We developed intelligent data visualization software that helps users cross-check automated diagnoses of system faults more effectively. The user interface displays scrollable arrays of timelines and time-series graphs, which are tightly integrated with an interactive, color-coded system schematic to show important spatial-temporal data patterns. Signal processing and rule-based diagnostic reasoning automatically identify alternate hypotheses and data patterns that support or rebut the original and alternate diagnoses. A color-coded matrix display summarizes the supporting or rebutting evidence for each diagnosis, and a drill-down capability enables crew members to quickly view graphs and timelines of the underlying data. This system demonstrates that modest amounts of diagnostic reasoning, combined with interactive, information-dense data visualizations, can accelerate system diagnosis and cross-checking.

Ong, James C.↗

NASA's Lunar Polar Ice Prospector, RESOLVE: Mission Rehearsal in Apollo Valley

After the completion of the Apollo Program, space agencies didn't visit the moon for many years. But then in the 90's, the Clementine and Lunar Prospector missions returned and showed evidence of water ice at the poles. Then in 2009 the Lunar Crater Observation and Sensing Satellite indisputably showed that the Cabeus crater contained water ice and other useful volatiles. Furthermore, instruments aboard the Lunar Reconnaissance Orbiter (LRO) show evidence that the water ice may also be present in areas that receive several days of continuous sunlight each month. However, before we can factor this resource into our mission designs, we must understand the distribution and quantity of ice or other volatiles at the poles and whether it can be reasonably harvested for use as propellant or mission consumables. NASA, in partnership with the Canadian Space Agency (CSA), has been developing a payload to answer these questions. The payload is named RESOLVE. RESOLVE is on a development path that will deliver a tested flight design by the end of 2014. The team has developed a Design Reference Mission using LRO data that has RESOLVE landing near Cabeus Crater in May of2016. One of the toughest obstacles for RESOLVE's solar powered mission is its tight timeline. RESOLVE must be able to complete its objectives in the 5-7 days of available sunlight. The RESOLVE team must be able to work around obstacles to the mission timeline in real time. They can't afford to take a day off to replan as other planetary missions have done. To insure that this mission can be executed as planned, a prototype version of RESOLVE was developed this year and tested at a lunar analog site on Hawaii, known as Apollo Valley, which was once used to train the Apollo astronauts. The RESOLVE team planned the mission with the same type of orbital imagery that would be available from LRO. The simulation team prepositioned a Lander in Apollo Valley with RESOLVE on top mounted on its CSA rover. Then the mission simulation began as the operations team's consoles came alive with data and images. They executed the mission just like the real mission with lunar communications delays and limited bandwidth and a realistic remote mission control room. This paper will describe the RESOLVE payload in detail and describe the results of the mission simulation in Hawaii.

Larson, William E.↗

An Analysis of Shuttle Crew Scheduling Violations

From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

Bristol, Douglas↗

Simulation for Prediction of Entry Article Demise (SPEAD): an Analysis Tool for Spacecraft Safety Analysis and Ascent/Reentry Risk Assessment

For the purpose of performing safety analysis and risk assessment for a probable offnominal suborbital/orbital atmospheric reentry resulting in vehicle breakup, a synthesis of trajectory propagation coupled with thermal analysis and the evaluation of node failure is required to predict the sequence of events, the timeline, and the progressive demise of spacecraft components. To provide this capability, the Simulation for Prediction of Entry Article Demise (SPEAD) analysis tool was developed. This report discusses the capabilities, modeling, and validation of the SPEAD analysis tool. SPEAD is applicable for Earth or Mars, with the option for 3 or 6 degrees-of-freedom (DOF) trajectory propagation. The atmosphere and aerodynamics data are supplied in tables, for linear interpolation of up to 4 independent variables. The gravitation model can include up to 20 zonal harmonic coefficients. The modeling of a single motor is available and can be adapted to multiple motors. For thermal analysis, the aerodynamic radiative and free-molecular/continuum convective heating, black-body radiative cooling, conductive heat transfer between adjacent nodes, and node ablation are modeled. In a 6- DOF simulation, the local convective heating on a node is a function of Mach, angle-ofattack, and sideslip angle, and is dependent on 1) the location of the node in the spacecraft and its orientation to the flow modeled by an exposure factor, and 2) the geometries of the spacecraft and the node modeled by a heating factor and convective area. Node failure is evaluated using criteria based on melting temperature, reference heat load, g-load, or a combination of the above. The failure of a liquid propellant tank is evaluated based on burnout flux from nucleate boiling or excess internal pressure. Following a component failure, updates are made as needed to the spacecraft mass and aerodynamic properties, nodal exposure and heating factors, and nodal convective and conductive areas. This allows the trajectory to be propagated seamlessly in a single run, inclusive of the trajectories of components that have separated from the spacecraft. The node ablation simulates the decreasing mass and convective/reference areas, and variable heating factor. A built-in database provides the thermo-mechanical properties of For the purpose of performing safety analysis and risk assessment for a probable offnominal suborbital/orbital atmospheric reentry resulting in vehicle breakup, a synthesis of trajectory propagation coupled with thermal analysis and the evaluation of node failure is required to predict the sequence of events, the timeline, and the progressive demise of spacecraft components. To provide this capability, the Simulation for Prediction of Entry Article Demise (SPEAD) analysis tool was developed. This report discusses the capabilities, modeling, and validation of the SPEAD analysis tool. SPEAD is applicable for Earth or Mars, with the option for 3 or 6 degrees-of-freedom (DOF) trajectory propagation. The atmosphere and aerodynamics data are supplied in tables, for linear interpolation of up to 4 independent variables. The gravitation model can include up to 20 zonal harmonic coefficients. The modeling of a single motor is available and can be adapted to multiple motors. For thermal analysis, the aerodynamic radiative and free-molecular/continuum convective heating, black-body radiative cooling, conductive heat transfer between adjacent nodes, and node ablation are modeled. In a 6- DOF simulation, the local convective heating on a node is a function of Mach, angle-ofattack, and sideslip angle, and is dependent on 1) the location of the node in the spacecraft and its orientation to the flow modeled by an exposure factor, and 2) the geometries of the spacecraft and the node modeled by a heating factor and convective area. Node failure is evaluated using criteria based on melting temperature, reference heat load, g-load, or a combination of the above. The failure of a liquid propellant tank is evaluated based on burnout flux from nucleate boiling or excess internal pressure. Following a component failure, updates are made as needed to the spacecraft mass and aerodynamic properties, nodal exposure and heating factors, and nodal convective and conductive areas. This allows the trajectory to be propagated seamlessly in a single run, inclusive of the trajectories of components that have separated from the spacecraft. The node ablation simulates the decreasing mass and convective/reference areas, and variable heating factor. A built-in database provides the thermo-mechanical properties of

Ling, Lisa↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

Cassini Titan Science Integration: Getting a 'Jumpstart' on the Process

The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.

Steadman, Kimberly B.↗

Systems Engineering Lessons Learned for Class D Missions

One of NASA's goals within human exploration is to determine how to get humans to Mars safely and to live and work on the Martian surface. To accomplish this goal, several smaller missions act as stepping-stones to the larger end goal. NASA uses these smaller missions to develop new technologies and learn about how to survive outside of Low Earth Orbit for long periods. Additionally, keeping a cadence of these missions allows the team to maintain proficiency in the complex art of bringing spacecraft to fruition. Many of these smaller missions are robotic in nature and have smaller timescales, whereas there are others that involve crew and have longer mission timelines. Given the timelines associated with these various missions, different levels of risk and rigor need to be implemented to be more in line with what is appropriate for the mission. Thus, NASA has four different classifications that range from Class A to Class D based on the mission details. One of these projects is the Resource Prospector (RP) Mission, which is a multi-center and multi-institution collaborative project to search for volatiles in the polar regions of the Moon. The RP mission is classified as a Class D mission and as such, has the opportunity to more tightly manage, and therefore accept, greater levels of risk. The requirements for Class D missions were at the forefront of the design and thus presented unique challenges in vehicle development and systems engineering processes. This paper will discuss the systems engineering process at NASA and how that process is tailored for Class D missions, specifically the RP mission.

Rojdev, Kristina↗

NEEMO 18-20: Analog Testing for Mitigation of Communication Latency During Human Space Exploration

NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of communication latencies on operations concepts, timelines, and tasks were studied. METHODS: Twelve subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science team (ST) to provide input and direction during exploration activities. Exploration traverses were preplanned based on precursor data. Subjects completed science-related tasks including pre-sampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were designed to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, ST assimilation time (defined as time available for ST to discuss data/imagery after data acquisition). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for pre-sampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across communication latencies and can be done with minimal crew idle time. Imagery and contextual information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide meaningful feedback and instruction to the crew regarding sampling priorities, additional tasks, and changes to the EVA timeline. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency.

Chappell, Steven P.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

Round-Trip Solar Electric Propulsion Missions for Mars Sample Return

Mars Sample Return (MSR) missions could benefit from the high specific impulse of Solar Electric Propulsion (SEP) to achieve lower launch masses than with chemical propulsion. SEP presents formulation challenges due to the coupled nature of launch vehicle performance, propulsion system, power system, and mission timeline. This paper describes a SEP orbiter-sizing tool, which models spacecraft mass & timeline in conjunction with low thrust round-trip Earth-Mars trajectories, and presents selected concept designs. A variety of system designs are possible for SEP MSR orbiters, with large dry mass allocations, similar round-trip durations to chemical orbiters, and reduced design variability between opportunities.

Solar Electric Propulsion↗