Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transfer trajectory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

NASA's Microwave Anisotropy Probe (MAP) was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta expendable launch vehicle into a 185-km circular orbit with a 28.7deg inclination. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a lissajous orbit about the Earth-Sun L2 Lagrange point, about 1.5 million km from Earth. Because of its complex orbital characteristics, the mission provided a unique challenge for orbit determination (OD) support in many orbital regimes. This paper summarizes the premission trajectory covariance error analysis, as well as actual OD results. The use and impact of the various tracking stations, systems, and measurements will be also discussed. Important lessons learned from the MAP OD support team will be presented. There will be a discussion of the challenges presented to OD support including the effects of delta-Vs at apogee as well as perigee, and the impact of the spacecraft attitude mode on the OD accuracy and covariance analysis.

Bauer, Frank↗

Initialization of Formation Flying Using Primer Vector Theory

In this paper, we extend primer vector analysis to formation flying. Optimization of the classical rendezvous or free-time transfer problem between two orbits using primer vector theory has been extensively studied for one spacecraft. However, an increasing number of missions are now considering flying a set of spacecraft in close formation. Missions such as the Magnetospheric MultiScale (MMS) and Leonardo-BRDF (Bidirectional Reflectance Distribution Function) need to determine strategies to transfer each spacecraft from the common launch orbit to their respective operational orbit. In addition, all the spacecraft must synchronize their states so that they achieve the same desired formation geometry over each orbit. This periodicity requirement imposes constraints on the boundary conditions that can be used for the primer vector algorithm. In this work we explore the impact of the periodicity requirement in optimizing each spacecraft transfer trajectory using primer vector theory. We first present our adaptation of primer vector theory to formation flying. Using this method, we then compute the AV budget for each spacecraft subject to different formation endpoint constraints.

Mailhe, Laurie↗

Servicing and Deployment of National Resources in Sun-Earth Libration Point Orbits

Spacecraft travel between the Sun-Earth system, the Earth-Moon system, and beyond has received extensive attention recently. The existence of a connection between unstable regions enables mission designers to envision scenarios of multiple spacecraft traveling cheaply from system to system, rendezvousing, servicing, and refueling along the way. This paper presents examples of transfers between the Sun-Earth and Earth-Moon systems using a true ephemeris and perturbation model. It shows the (Delta)V costs associated with these transfers, including the costs to reach the staging region from the Earth. It explores both impulsive and low thrust transfer trajectories. Additionally, analysis that looks specifically at the use of nuclear power in libration point orbits and the issues associated with them such as inadvertent Earth return is addressed. Statistical analysis of Earth returns and the design of biased orbits to prevent any possible return are discussed. Lastly, the idea of rendezvous between spacecraft in libration point orbits using impulsive maneuvers is addressed.

Folta, David C.↗

Orbit Determination Error Analysis Results for the Triana Sun-Earth L2 Libration Point Mission

Using the NASA Goddard Space Flight Center's Orbit Determination Error Analysis System (ODEAS), orbit determination error analysis results are presented for all phases of the Triana Sun-Earth L1 libration point mission and for the science data collection phase of a future Sun-Earth L2 libration point mission. The Triana spacecraft was nominally to be released by the Space Shuttle in a low Earth orbit, and this analysis focuses on that scenario. From the release orbit a transfer trajectory insertion (TTI) maneuver performed using a solid stage would increase the velocity be approximately 3.1 km/sec sending Triana on a direct trajectory to its mission orbit. The Triana mission orbit is a Sun-Earth L1 Lissajous orbit with a Sun-Earth-vehicle (SEV) angle between 4.0 and 15.0 degrees, which would be achieved after a Lissajous orbit insertion (LOI) maneuver at approximately launch plus 6 months. Because Triana was to be launched by the Space Shuttle, TTI could potentially occur over a 16 orbit range from low Earth orbit. This analysis was performed assuming TTI was performed from a low Earth orbit with an inclination of 28.5 degrees and assuming support from a combination of three Deep Space Network (DSN) stations, Goldstone, Canberra, and Madrid and four commercial Universal Space Network (USN) stations, Alaska, Hawaii, Perth, and Santiago. These ground stations would provide coherent two-way range and range rate tracking data usable for orbit determination. Larger range and range rate errors were assumed for the USN stations. Nominally, DSN support would end at TTI+144 hours assuming there were no USN problems. Post-TTI coverage for a range of TTI longitudes for a given nominal trajectory case were analyzed. The orbit determination error analysis after the first correction maneuver would be generally applicable to any libration point mission utilizing a direct trajectory.

Marr, G.↗

A Comprehensive Survey of Earth-Moon Libration Orbits: Stationkeeping Strategies And Intra-Orbit Transfers

Cislunar space is a readily accessible region that may well develop into a prime staging area in the effort to colonize space near the Earth or to colonize the moon. While there have been statements made by various NASA programs regarding placement of resources in orbit about the Earth-Moon Lagrangian locations, there is no survey of the total cost associated with attaining and maintaining these unique orbits in an optimal fashion. Transfer trajectories between these orbits required for assembly, servicing, and positioning of these resources have not been extensively investigated. These orbits are dynamically similar to those used for the Sun-Earth missions, but differences in governing gravitational ratios and perturbation sources result in their having their own unique characteristics.

Folta, David↗

Autonomous NanoTechnology Swarm (ANTS) Prospecting Asteroid Mission (PAM), Asteroid Proximity Operations

The Autonomous NanoTechnology Swarm (ANTS) is a generic mission architecture based on spatially distributed spacecraft, autonomous and redundant components, and hierarchical organization. The ANTS Prospecting Asteroid Mission (PAM) is an ANTS application which will nominally use a swarm of 1000 spacecraft. There would be 10 types of "specialists" with common spacecraft buses. There would be 10 subswarms of approximately 100 spacecraft each or approximately 10 of each specialist in each swarm. The ANTS PAM primary objective is the exploration of the asteroid belt in search of resources and material with astrobiologically relevant origins and signatures. The ANTS PAM spacecraft will nominally be released from a station in an Earth-Moon L1 libration point orbit, and they will use Solar sails for propulsion. The sail structure would be highly flexible, capable of changing morphology to change cross-section for capture of sunlight or to form effective "tip vanes" for attitude control. ANTS PAM sails would be capable of full to partial deployment, to change effective sail area and center of pressure, and thus allow attitude control. Results of analysis of a transfer trajectory from Earth to a sample target asteroid will be presented. ANTS PAM will require continuous coverage of different asteroid locations as close as one to two asteroid "diameters" from the surface of the asteroid for periods of science data collection during asteroid proximity operations. Hovering spacecraft could meet the science data collection objectives. The results of hovering analysis will be presented. There are locations for which hovering is not possible, for example on the illuminated side of the asteroid. For cases where hovering is not possible, the results of utilizing asteroid formations to orbit the asteroid and achieve the desired asteroid viewing will be presented for sample asteroids. The ability of ANTS PAM to reduce the area of the solar sail during asteroid proximity operations is critical to the maintenance of orbiting formations for a period of time. Results of analysis of potential "traffic" problems during asteroid proximity operations will be presented.

Marr, Greg↗

Magellan Prelaunch Mission Operations Report

The Magellan spacecraft will be launched from Kennedy Space Center (KSC) within a 31-day overall launch period extending from April 28 to May 28, 1989. The launch will use the Shuttle Orbiter Atlantis to lift an Inertial Upper Stage (IUS) and the Magellan Spacecraft into low Earth orbit. After the Shuttle achieves its parking orbit, the IUS and attached Magellan spacecraft are deployed from the payload bay. After a short coast time, the two-stage IUS is fired to inject the Magellan spacecraft into an Earth-Venus transfer trajectory. The Magellan spacecraft is powered by single degree of freedom, sun-tracking, solar panels charging a set of nickel-cadmium batteries. The spacecraft is three-axis stabilized by reaction wheels using gyros and a star sensor for attitude reference. The spacecraft carries a solid rocket motor for Venus Orbit Insertion (VOI). A hydrazine propulsion system allows trajectory correction and prevents saturation of the reaction wheels. Communication with Earth through the Deep Space Network (DSN) is provided by S- and X-band telemetry channels, through alternatively a low, medium, or 3.7 m high-gain parabolic antenna rigidly attached to the spacecraft. The high-gain antenna also serves as the radar and radiometer antenna during orbit around Venus.

Source record↗

Transfer to the Collinear Libration Point L3 in the Sun-Earth+Moon System

The collinear libration point L3 of the sun-earth+moon system is an ideal place for some space missions. Although there has been a great amount of work concerning the applications of the other two collinear libration points L1 and L2, little work has been done about the point L3. In this paper, the dynamics of the libration points was briefly introduced first. Then a way to transfer the spacecraft to the collinear libration point L3 via the invariant manifolds of the other two collinear libration points was proposed. Theoretical works under the model of circular restricted three-body problem were done. For the sun-earth+moon system, this model is a good approximation. The results obtained are useful when a transfer trajectory under the real solar system is designed.

Hou, Xi-yun↗

Subregions of Motion and Elliptic Halo Orbits in the Elliptic Restricted Three-Body Problem

In this paper we present regions of motion and periodic orbits in the spatial elliptic restricted three body problem (ER3BP). Periodic orbits and regions of motion are fundamental keys to understand any dynamical system; for this reason the Hill's surfaces or the families of halo orbits have been extensively studied in the frame of the circular restricted three body problem. It is our opinion that their natural extensions to the ER3BP have not been studied enough. We divide the position space into forbidden subregions, subregions of motion and low-velocity subregions.We use these notions to define necessary condition for a transfer trajectory in the ER3BP. Also we compute branches of elliptic halo orbits bifurcating from halo orbits in the circular restricted three body problem. The new periodic orbits have principal periods and stability properties different from those of the originating halo orbit.

mission design↗

Fast Interplanetary Missions with Low-Thrust Propulsion Systems

A simple family of indirect transfer trajectories between circular orbits is used to evaluate the mass ratio required to complete round-trip interplanetary missions using low-thrust propulsion systems. The results indicate that indirect interplanetary trajectories yield substantial reductions in total round-trip time for low-thrust as well as high-thrust vehicles, and that space vehicles propelled with electric rockets may produce greater reductions in trip time, for a given initial weight, than those propelled by high-thrust nuclear rockets.

Moeckel, W. E.↗

Progress Report on Mars Pathfinder Project Approach

Mars Pathfinder, launching on December 2, 1996 and landing on Mars on July 4, 1997, will demonstrate a low-cost delivery system to the surface of Mars. Historically, spacecraft that orbit or land on a distant body carry massive amounts of fuel for braking at the planet. Pathfinder requires fuel only to navigate to Mars; the spacecraft aerobrakes into the Mars atmosphere directly from Earth-Mars transfer trajectory, deploys a parachute at 10 km above the surface and, within 100 m of the surface, fires solid rockets for final braking prior to deployment of airbags that cushion touchdown. After landing, petals open to upright the lander, followed by deployment of a small rover and several science instruments.

Mars↗

Navigating MarCO, the first interplanetary CubeSats

The NASA’s Mars Cube One (MarCO) probes are twin 6U CubeSats that were launched into space on May 5, 2018. The MarCOs shared a launch vehicle with NASA’s InSight mission, separating from the Atlas V Centaur upper stage after InSight. The MarCOs were injected into an Earth-Mars transfer trajectory and were independently navigated to the proximity of Mars. On 26 November, 2018 the MarCO probes flew by Mars as the InSight lander descended to the surface, providing real-time relay of InSight UHF data back to the Earth. This paper describes the approaches used to design the MarCOs’ trajectories and to navigate them to Mars, presenting the challenges of navigating and operating CubeSats in deep space, and the technological firsts achieved by the MarCO mission.

Young, Brian↗

Neural Network Based Optimal Control: Resilience to Missed Thrust Events for Long Duration Transfers

A growing number of spacecraft are continuing to adopt new and more efficient forms of in-space propulsion. One shared characteristic of these high-efficiency propulsion techniques is their limited thrust capabilities. This requires them to thrust continuously for long periods of time, making the spacecraft susceptible to potential missed thrust events. This work demonstrates how neural networks can autonomously correct for missed thrust events during a low-thrust long-duration transfer trajectory. The research applies and tests the developed method to au- tonomously correct a Mars return trajectory. Additionally, methods for improving the response of neural networks to missed thrust events are presented and further investigated.

Laipert, Frank E.↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Space Operations↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Karen Richon↗