Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Optical attenuation mechanism upgrades, MOBLAS, and TLRS systems

This poster presentation describes the Optical Attenuation Mechanism (OAM) Upgrades to the MOBLAS and TLRS Crustal Dynamics Satellite Laser Ranging (CDSLR) systems. The upgrades were for the purposes of preparing these systems to laser range to the TOPEX/POSEIDON spacecraft when it will be launched in the summer of 1992. The OAM permits the laser receiver to operate over the expected large signal dynamic range from TOPEX/POSEIDON and it reduces the number of pre- and post-calibrations for each satellite during multi-satellite tracking operations. It further simplifies the calibration bias corrections that had been made due to the pass-to-pass variation of the photomultiplier supply voltage and the transmit filter glass thickness. The upgrade incorporated improvements to the optical alignment capability of each CDSLR system through the addition of a CCD camera into the MOBLAS receive telescope and an alignment telescope onto the TLRS optical table. The OAM is stepper motor and microprocessor based; and the system can be controlled either manually by a control switch panel or computer controlled via an EIA RS-232C serial interface. The OAM has a neutral density (ND) range of 0.0 to 4.0 and the positioning is absolute referenced in steps of 0.1 ND. Both the fixed transmit filter and the daylight filter are solenoid actuated with digital inputs and outputs to and from the OAM microprocessor. During automated operation, the operator has the option to overide the remote control and control the OAM system via a local control switch panel.

Eichinger, Richard↗

The Network Operations Control Center upgrade task: Lessons learned

This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

Sherif, J. S.↗

Criteria development for upgrading computer networks

Being an infrastructure system, the computer network has a fundamental role in the day to day activities of personnel working at KSC. It is easily appreciated that the lack of 'satisfactory' network performance can have a high 'cost' for KSC. Yet, this seemingly obvious concept is quite difficult to demonstrate. At what point do we say that performance is below the lowest tolerable level? How do we know when the 'cost' of using the system at the current level of degraded performance exceeds the cost of upgrading it? In this research, we consider the cost and performance factors that may have an effect in decision making in regards to upgrading computer networks. Cost factors are detailed in terms of 'direct costs' and 'subjective costs'. Performance factors are examined in terms of 'required performance' and 'offered performance.' Required performance is further examined by presenting a methodology for trend analysis based on applying interpolation methods to observed traffic levels. Offered performance levels are analyzed by deriving simple equations to evaluate network performance. The results are evaluated in the light of recommended upgrade policies currently in use for telephone exchange systems, similarities and differences between the two types of services are discussed.

Efe, Kemal↗

Thermal System Upgrade of the Space Environment Simulation Test Chamber

The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

Desai, Ashok B.↗

Marshall Space Flight Center's Tower Vector Magnetograph: Upgrades, Hardware, and Operations for the HESSI Mission

The Marshall Space Flight Center's (MSFC) solar group announces the successful upgrade of our tower vector magnetograph. In operation since 1973, the last major alterations to the system (which includes telescope, filter, polarizing optics, camera, and data acquisition computer) were made in 1982, when we upgraded from an SEC Vidicon camera to a CCD. In 1985, other changes were made which increased the field-of-view from 5 x 5 arc min (2.4 arc sec per pixel) to 6 x 6 arc min with a resolution of 2.81 arc sec. In 1989, the Apollo Telescope Mount H-alpha telescope was coaligned with the optics of the magnetograph. The most recent upgrades (year 2000), funded to support the High Energy Solar Spectroscopic Imager (HESSI) mission, have resulted in a pixel size of 0.64 arc sec over a 7 x 5.2 arc min field-of-view (binning 1x1). This poster describes the physical characteristics of the new system and compares spatial resolution, timing, and versatility with the old system. Finally, we provide a description of our Internet web site, which includes images of our most recent observations, and links to our data archives, as well as the history of magnetography at MSFC and education outreach pages.

Adams, M. L.↗

Habitat Demonstration Unit Medical Operations Workstation Upgrades

This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

Trageser, Katherine H.↗

Detection Performance of Upgraded "Polished Panel" Optical Receiver Concept on the Deep-Space Network's 34 Meter Research Antenna

Initial optical communications experiments with a Vertex polished aluminum panel have been described. The polished panel was mounted on the main reflector of the DSN's research antenna at DSS-13. The PSF was recorded via remotely controlled digital camera mounted on the subreflector structure. Initial PSF generated by Jupiter showed significant tilt error and some mechanical deformation. After upgrades, the PSF improved significantly, leading to much better concentration of light. Communications performance of the initial and upgraded panel structure were compared. After the upgrades, simulated PPM symbol error probability decreased by six orders of magnitude. Work is continuing to demonstrate closed-loop tracking of sources from zenith to horizon, and better characterize communications performance in realistic daytime background environments.

polished panel optical receiver↗

Mars Global Reference Atmospheric Model (Mars-GRAM) Upgrades

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering models of the Martian atmosphere is the Mars Global Reference Atmospheric Model (Mars-GRAM) developed and maintained by the NASA Marshall Space Flight Center (MSFC). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the planetary GRAMs in Fiscal Year 2018 and 2019. This poster summarizes the upgrades that have been made to Mars-GRAM, the release status of Mars-GRAM, the new GRAMs that are under development, and future Mars-GRAM upgrade plans.

Justh, H. L.↗

Upgrades to the Single Stage Axial Compressor and Fan Facility For Low Pressure Ratio and Boundary Layer Ingesting Fan Research

Next generation aircraft engine efficiency goals will be met through high bypass ratio engines. To achieve these goals, a combination of small core and low pressure ratio fan technologies will be necessary. Additionally, advanced propulsion air-frame integration concepts, such as boundary layer propulsion, and distributed electrically driven fans with short inlets or wing integration strategies, are beginning to be investigated for their potential fuel burn savings. In order to realize the potential fuel savings from these technologies, it is necessary to have testing capabilities for the components. The NASA Glenn Research Center (GRC) Single StageAxial Fan and Compressor Facility (also called the GRC W-8Facility) has recently undergone several significant upgrades in order to effectively test low pressure ratio fans and various inlet distortions. This paper will outline various challenges to testing low pressure ratio fans and the methods implemented to ensure that the W-8 facility is capable of performing these tests and acquiring high quality data. The upgrades include significant pip-ing upgrades to reduce pressure loss and turbulence, capability for inlet total pressure and swirl distortion, increased test section length including a longer shaft, a two component balance, an up-graded rotating data system, and a new temperature characterization to reduce uncertainties in thermocouple measurements

W-8 Facility↗

Upgrades to the Mars Global Reference Atmospheric Model (Mars-GRAM)

The inability to test planetary spacecraft in the flight environment prior to a mission requires engineers to rely on ground-based testing and models of the vehicle and expected environments. One of the most widely used engineering reference models of planetary atmospheres are the Global Reference Atmospheric Models (GRAMs). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the GRAMs since Fiscal Year 2018. The GRAM upgrades are being developed by NASA Marshall Space Flight Center and NASA Langley Research Center. This poster provides details regarding recent MarsGRAM upgrades.

atmospheric models↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

BETO 2021 Peer Review - Biological Upgrading of Sugars (BUS) 2.3.2.105

The Biological Upgrading of Sugars (BUS) project directly targets the anaerobic conversion of lignocellulosic feedstocks into intermediate molecules readily upgradeable to fuel precursors. Recent efforts on the BUS project have a particular emphasis on the biological production of butyric acid, an intermediate that can be readily upgraded to sustainable aviation fuel, diesel blend-stocks, and high value chemicals. The BUS project approaches this direction through a combination of strain engineering, fermentation process engineering, development of novel separations technologies, and the design and build of pilot scale systems. Our ultimate project goal is to develop an integrated cost-effective process at pilot scale to achieve DOE's MYPP targets of $2.50/GGE. The major thrust of the BUS project over the last project cycle was on the development of integrated processes surrounding the anaerobic production of carboxylic acids using diverse Clostridium species. We developed and expanded genetic tools for several Clostridium species and rewired microbial metabolism in an attempt to maximize substrate utilization and flux towards butyric acid. We designed and built novel bioreactors with an in situ product recovery system enabling the biological production and recovery of highly purified acids. We leveraged this system to generate 100s of grams of acid from corn stover hydrolysate. In this presentation we highlight data surrounding our proposed process and accompanying results from technoeconomic and life-cycle analyses of our integrated process. Finally, we detail plans of our pilot scale reactor system that is in process and discuss our future routes towards achieving economically viable and sustainable diesel and jet blendstocks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

It's All About the Envelope: Prioritizing Envelope Upgrades for Electrification of Cold Climate Homes

Building decarbonization via electrification on a clean grid is the most promising climate solution proposed to date for the building sector. In cold climate zones, building electrification will be driven in large part by moving from natural gas space heating to cold climate heat pumps (CCHPs). CCHPs are commercially available today, including economical cold climate air source heat pumps (ccASHPs). But there's one big problem - wide-scale adoption of ccASHPs will dramatically increase winter peak electricity demand, even with the highest efficiency ccASHP products. Furthermore, cold climate space heating loads will drive unprecedented electric system peaks during the lowest periods of renewable generation and are likely to overwhelm existing distribution systems. This scenario is avoidable by coupling electrification with building envelope upgrades to reduce peak heating loads. This paper presents a model, built from home energy audit and research data sets, that quantifies the above challenges. Results demonstrate how weatherization efforts coupled with additional high-performance envelope upgrade measures can prepare the building stock for electrification and show the benefit these measures can bring to future utility operations. Much of this envelope upgrade work is cost-effective, according to conservative cost-benefit testing and program successes to date, and is coupled with substantial non-energy benefits. However, persistent market barriers have made scaling of envelope retrofit work challenging for decades, suggesting additional policy support is required. Lessons learned from previous policy experience, combined with new technology and administrative support, create exciting potential for this decarbonization climate solution.

air sealing↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Control System Upgrade for Canal ARC SAW

Upgrading the specific components of the Arc Saw, such as the HMI, the components of the chassis involving the I/O modules, servo motor modules, and PLC modules offers numerous advantages. By enhancing the HMI, the operators will benefit having a user-friendly interface, enabling smoother control and monitoring of the ARC SAW’s functionality. Upgrading the modules will contribute to an improved precision and responsiveness in changing modes of the ARC SAW as well as the adjusting the saw blades position, further enhancing the system's overall performance. These upgrades, while maintaining the same functionality, enable the latest technological advancements without needing significant changes or disruptions to existing operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An upgraded frequency-selectable laser source (FLS) calibrator for CMB bandpass characterization

One of the biggest challenges for Cosmic Microwave Background (CMB) experiments comes from the uncertainty in instrument bandpass calibration. Uncertainties in bandpass can limit foreground removal and spectral fitting, which are critical for inflationary and galaxy cluster measurements. CMB experiments currently use Fourier Transform Spectrometers (FTSes) to measure instrument bandpasses. However, FTS systems are currently systematics-limited, so significant improvements in bandpass measurements require novel calibrators. To this end, we developed a Frequency-selectable Laser Source (FLS) calibrator, which uses a laser with adjustable frequency coupled to a system that allows for laser power attenuation. Following initial testing with the first FLS prototype, we developed an upgraded version of the calibrator with improved performance. We present the upgrades to the FLS calibrator, the characterization of the upgraded calibrator and new laser source, and plans for testing with microwave instruments in the field.

Saunders, Lauren J. [Fermilab] (ORCID:000000016367↗

Upgrade of the mechanically pumped CO 2 two-phase cooling system for the alpha magnetic spectrometer on the international space station

This study describes the successful upgrade of a mechanically pumped CO 2 two-phase cooling system in space by designing a new pump module for the Alpha Magnetic Spectrometer-02 on the International Space Station. Key factors for mission success are emphasized, including achieving high coolant filling accuracy within 10% of the target and maintaining system stability within ±1 °C. The impact of adding radiators to improve cooling efficiency is examined, and it is found that operating multi-radiators out-of-phase does not significantly affect system reliability. The centrifugal pump design is shown to allow for better lubricant circulation, while the in-house designed controller incorporates protective measures to prevent cavitation, overheating, and over-current. Further, this research advances the understanding of circulation loop systems and their upgrades in space and demonstrates the potential for extending the lifetime of space-borne mechanically pumped two-phase cooling systems.

42 ENGINEERING↗