Search NASA⌕ Search

SEARCH · Search NASA

Results for “WETLAND RESTORATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Detailed Hydrodynamic Feasibility Assessment for Leque Island and Zis a Ba Restoration Projects

Numerous restoration projects are underway in Puget Sound, Washington, USA with the goal of re-establishing intertidal wetlands that were historically lost due to dike construction for flood protection and agricultural development. One such effort is the restoration effort within the Stillaguamish Delta, benefitting from the cumulative effects from the Leque Island and zis a ba restoration projects. The preferred restoration design calls for the removal of perimeter dikes at the two sites and the creation of tidal channels to facilitate the drainage of tidal flows. A 3-D high-resolution unstructured-grid coastal ocean model based on FVCOM was developed to evaluate the hydrodynamic response of the estuary to restoration alternatives. A series of hydrodynamic modeling simulations were then performed to quantify the hydrodynamic response of the nearshore restoration project, such as periodic inundation, suitable currents, and desired habitat/salinity levels. Sediment impacts were also examined, including the potential for excessive erosion or sedimentation requiring maintenance. Simulation results indicate that the preferred alternative scenario provides the desired estuarine response, which is consistent with the planned design. A decrease in velocities and bed shear in the main river channels was noted for the restored condition associated with the increased inundation of tidal flat area and reduced tidal flows through the main channels. High bed shear near the restored tidal channel entrances indicates that the inlets may evolve in size until equilibrium is established.

hydrodynamics, feasibility assessments, nearshore ↗

Platte River Water Resources: Assessing Urban Flood Vulnerability to Select Restoration Sites for Urban Woods and Prairies in the Great Plains

In the Platte River Basin, wetlands provide ecosystem services such as flood mitigation and wildlife habitat. However, increasing urban development in the area has impacted natural floodplain processes, leading to a decline in wildlife habitat and an elevated flood risk for nearby communities. To address this issue, Audubon Great Plains’ Urban Woods and Prairies (UWP) Initiative focuses on restoring vital habitats within urban areas to protect bird species and reduce flood hazards. Our project used remotely sensed data, including Landsat 8 Operational Land Imagery (OLI), Sentinel-2 Multispectral Instrument (MSI), and Sentinel-1 Synthetic Aperture Radar (SAR), to assess land use and land cover from 2013 to 2023, as well as flood extent. Broad-scale analysis of the LULC showed some changes in land use patterns across the Central Platte River Basin, with the most notable being a decrease in Agricultural land coverage and an increase in Vegetation and Grassland coverage. Land use changes varied across 13 focal cities across the entire basin. In particular, developed land in Grand Island, NE, nearly tripled from 2019 to 2023, making it a good possible candidate for restoration efforts. We overlaid a flood extent map with the LULC classifications in Grand Island to identify possible restoration sites under UWP. This data will inform Audubon Great Plains in identifying potential restoration sites in key cities.

Jennifer Mathis↗

Applying cumulative effects to strategically advance large-scale ecosystem restoration

Programs restoring large terrestrial-aquatic ecosystems are expected to increase in area and number over the next decade. Factors ensuring long-term effectiveness at the program scale differ from those at the individual restoration project scale, necessitating a new synthesis. Here we contextualize hydrological, geomorphological, and biological effects of large-scale ecosystem restoration activities within a cumulative-effects paradigm. Evidence of eight modes of cumulative effects benefiting species and ecosystems was elucidated by reviewing restoration efforts in the greater Florida Everglades, Gulf Coast, lower Columbia River and estuary, Puget Sound estuary, Missouri River, northeastern coastal states, San Francisco Bay and Sacramento Delta. Additive and nonlinear cumulative effects of interacting restoration projects propagated across landscape and regional geographic scales, and throughout trophic levels, affecting population structures. Applying a cumulative-effects paradigm to planning, implementing, and evaluating large-scale restoration will avoid countervailing effects and capitalize on positive feedback, advancing evidence-based programs to recover priority species and ecosystems.

54 ENVIRONMENTAL SCIENCES↗

A Global Methane Observation System to Reduce Uncertainty for Anthropogenic and Natural Sources and Sinks for Detecting and Attributing Climate Feedbacks

Atmospheric methane (CH4) concentrations are accelerating global warming as net emissions increase. Observing systems that quantify sources remain too sparse and fragmented to detect trends—especially in remote regions where climate‐driven natural emissions may be rising. We provide a framework for quantifying uncertainty reductions through the implementation of a global ecosystem‐methane observing system designed to: (i) substantially lower uncertainty in sectoral and regional emissions, (ii) separate co‐occurring anthropogenic and natural fluxes, and (iii) trend detection at regional scales to verify mitigation progress and provide early warning of natural feedbacks. Using bottom‐up inventories and process‐model ensembles for 2014–2023, we show that anthropogenic emissions remain uncertain by ∼32% globally, while natural sources—tropical and boreal‐arctic wetlands, fires, and inland waters—carry far larger uncertainties (+ 70%) and trend uncertainties reaching ∼200%. Additional observations must match spatial emission structure to increase observability of emissions: high‐resolution satellite constellations for point sources combined with expanded flux networks and wetland mapping for diffuse sources, and denser ground‐based atmospheric column measurements to restore observability in under‐sampled tropics and high latitudes. Notional analyses indicate that targeted additions of flux towers and ∼20 in situ atmospheric column concentration instruments per key tropical region could reduce continental‐scale uncertainties at modest cost. Conceptual illustration of a Global Ecosystem Methane Observing System (GEM‐OS) integrating satellites, aircraft, atmospheric networks, and ecosystem measurements to quantify methane emissions from anthropogenic and natural sources. The multi‐scale observing framework improves source attribution, reduces uncertainty in regional methane budgets, and enables early detection of climate‐driven feedbacks from wetlands, fires, permafrost, agriculture, and fossil‐fuel emissions.

Ciais, P↗

A Levels-of-Evidence Approach for Assessing Cumulative Ecosystem Response to Estuary and River Restoration Programs

Even though large-scale ecological restoration programs are beginning to supplement isolated projects implemented on rivers and tidal waterways, the effects of restoration success often continue to be evaluated at project scales or by integration in an additive manner. Today our scientific understanding is sufficient that we can begin to apply lessons learnt from assessing cumulative impacts of anthropogenic stressors on ecosystems to the assessment of ecological restoration. Integration of this knowledge has the potential to increase the efficacy of restoration projects conducted at several locations but co-managed within the confines of a larger integrative program. We introduce here a framework based on a levels-of-evidence approach that facilitates assessment of the cumulative landscape effects of individual restoration actions taken at many different locations. It incorporates data collection at restoration and reference sites, hydrodynamic modeling, geographic information systems, and meta-analyses in a five-stage process: design, data, analysis, synthesis and evaluation, and application. This framework evolved from the need to evaluate the efficacy of restoration projects designed to increase rearing habitat for outmigrating juvenile salmonids, which are being implemented in numerous wetlands on the 235-km tidal portion of the Columbia River, U.S.A.

54 ENVIRONMENTAL SCIENCES↗

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

The Oncor Geodatabase for the Columbia Estuary Ecosystem Restoration Program: Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates

This Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates is designed to support the Oncor geodatabase for the Columbia Estuary Ecosystem Restoration Program (CEERP). The following data categories are covered: water-surface elevation and temperature, sediment accretion rate, photo points, herbaceous wetland vegetation cover, tree plots and site summaries, fish catch and density, fish size, fish diet, fish prey, and Chinook salmon genetic stock identification. The handbook is intended for use by scientists collecting monitoring and research data for the CEERP. The ultimate goal of Oncor is to provide quality, easily accessible, geospatial data for synthesis and evaluation of the collective performance of CEERP ecosystem restoration actions at a program scale.

54 ENVIRONMENTAL SCIENCES↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evidence-based evaluation of the cumulative effects of ecosystem restoration

Evaluating the cumulative effects of large-scale ecological restoration programs is necessary to inform adaptive ecosystem management and provide society with resilient and sustainable services. However, complex linkages between restorative actions and ecosystem responses make evaluations problematic. Despite long-term federal investments in restoring aquatic ecosystems, no standard evaluation method has been adopted and most programs focus on monitoring and analysis, not synthesis and evaluation. In this paper, we demonstrate a new transdisciplinary approach integrating techniques from evidence-based medicine, critical thinking, and cumulative effects assessment. Tiered hypotheses are identified using an ecosystem conceptual model. The systematic literature review at the core of evidence-based assessment becomes one of many lines of evidence assessed collectively, using critical thinking strategies and causal criteria from a cumulative effects perspective. As a demonstration, we analyzed data from 166 locations on the Columbia River and estuary representing 12 indicators of habitat and fish response to floodplain restoration actions intended to benefit threatened and endangered salmon. Synthesis of seven lines of evidence showed that hydrologic reconnection promoted macrodetritis export, prey availability, and fish access and feeding. The evidence was sufficient to infer cross-boundary, indirect, compounding and delayed cumulative effects, and suggestive of nonlinear, landscape-scale, and spatial density effects. On the basis of causal inferences regarding food web functions, we concluded that the restoration program has a cumulative beneficial effect on juvenile salmon. As a result, this evidence-based approach will enable the evaluation of restoration in complex coastal and riverine ecosystems where data have accumulated without sufficient synthesis.

54 ENVIRONMENTAL SCIENCES↗

Using Prescribed Fire to Manage the Fernald On-Site Disposal Facility Vegetated Cap - 17401

The Fernald Preserve is a former uranium processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425 ha (1,050 acre) tract of land, approximately 29 km (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and soil contamination was completed in 2006, but aquifer remediation is ongoing. Since 2007, the site has been managed by the US Department of Energy (DOE) Office of Legacy Management. Portions of the site are open to the public, with approximately 11 km (7 miles) of walking trails that are open year-round and a visitors center. Site remediation included the construction of an On-Site Disposal Facility (OSDF) for the long-term disposal of contaminated soil and building materials. The OSDF consists of eight disposal cells that encompass approximately 30 hectares (75 acres) on the eastern portion of the Fernald site. Cells are lined and capped, and each has a separate leak detection and leachate collection system. The integrated cap is vegetated with native grasses and forbs. Management of the Fernald Preserve includes the monitoring and maintenance of ecologically restored communities and the vegetated OSDF cap, as required by the site's institutional controls plan. Prescribed burning is recognized as the preferred method for prairie management. Prescribed fire has been used at the Fernald site since 2009 for established prairies in restored areas, but not on the OSDF cap. Stakeholders had reservations regarding the safety of using prescribed fire on the OSDF cap. Because of that, vegetation on the cap was managed as a grassland community. It was mowed, raked, and baled to remove thatch, and promote the continued establishment of native grasses and forbs. Since agricultural use is restricted at the site, the resulting hay bales were kept on property and reused as organic matter and mulch. Over time, more hay bales were being generated in a season than were reused. Therefore in 2015, DOE decided to revisit stakeholder acceptance of prescribed fire on the OSDF cap. Ongoing relationships with local stakeholders allowed for extensive discussions regarding the current management and proposed use of prescribed fire on the OSDF cap. The public was provided information about the planning and implementation of prescribed burns at the site and invited to observe the execution of a successful site burn. This approach led to stakeholder acceptance of DOE's proposal, and vegetation on the caps of cells 4, 5, and 6 was burned in late March 2016. The burn was successful and resulted in several benefits from a land stewardship and cost perspective. This paper details the stakeholder engagement approach and the resulting benefits from the use of prescribed fire on the OSDF cap. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior to release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Community Engagement Through Ongoing Services Provided by the Fernald Preserve Visitors Center - 17402

The Fernald Preserve is located on the site of a former uranium-processing plant that underwent extensive environmental remediation followed by comprehensive ecological restoration. It is managed by the US Department of Energy Office of Legacy Management and is located approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. Although the remediation of buildings and soil contamination was completed in 2006, site aquifer remediation is ongoing and remains a topic of interest to the community. Much of the site is open to the public, with approximately 11 km (7 miles) of year-round walking trails within the 425-hectare (1050-acre) site. The Fernald Preserve Visitors Center is open Wednesdays through Saturdays and site staff are available to accommodate program requests as needed. The Visitors Center was originally requested by stakeholders involved in developing recommendations for the site's final land use. Stakeholders requested a 'multi-use educational facility' that would recognize the site's history, serve as a source of site information, and recognize the contributions of energy workers during the Cold War. This building was converted from a warehouse built to support site cleanup and was ultimately awarded a Platinum rating by the U.S. Green Building Council. The Visitors Center was designed to accommodate site history exhibits, free meeting space for nonprofit groups, and public interpretive programs. It was opened to the public in 2008, and today's ongoing visitor services are continually adapted to meet the needs of current stakeholders. Over time, the interpretive services have evolved to include more diverse onsite cultural and natural history public programs, events, and activities. Today's community engagement efforts include public and private onsite programs and exhibits, public and private offsite programs and displays, meeting space, and regular open hours for the Visitors Center. This paper presents the various methods used to engage the greater Cincinnati community at the Fernald Preserve. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blue Carbon Stocks Along the Pacific Coast of North America Are Mainly Driven by Local Rather Than Regional Factors

Coastal wetlands, including seagrass meadows, emergent marshes, mangroves, and temperate tidal swamps, can efficiently sequester and store large quantities of sediment organic carbon (SOC). However, SOC stocks may vary by ecosystem type and along environmental or climate gradients at different scales. Quantifying such variability is needed to improve blue carbon accounting, conservation effectiveness, and restoration planning. We analyzed SOC stocks in 1,284 sediment cores along >6,500 km of the Pacific coast of North America that included large environmental gradients and multiple ecosystem types. Tidal wetlands with woody vegetation (mangroves and swamps) had the highest mean stocks to 1 m depth (357 and 355 Mg ha −1 , respectively), 45% higher than marshes (245 Mg ha −1 ), and more than 500% higher than seagrass (68 Mg ha −1 ). Unvegetated tideflats, though not often considered a blue carbon ecosystem, had noteworthy stocks (148 Mg ha −1 ). Stocks increased with tidal elevation and with fine (<63 μm) sediment content in several ecosystems. Stocks also varied by dominant plant species within individual ecosystem types. At larger scales, marsh stocks were lowest in the Sonoran Desert region of Mexico, and swamp stocks differed among climate zones; otherwise stocks showed little correlation with ecoregion or latitude. More variability in SOC occurred among ecosystem types, and at smaller spatial scales (such as individual estuaries), than across regional climate gradients. These patterns can inform coastal conservation and restoration priorities across scales where preserving stored carbon and enhancing sequestration helps avert greenhouse gas emissions and maintains other vital ecosystem services.

emergent marsh↗

Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis (Final Report)

The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Use of Ecological Restoration Principles To Achieve Remedy Protection At the Fernald Preserve and Weldon Spring Sites

At both the Fernald Preserve and the Weldon Spring Site, the development of ecological restoration goals and objectives was used to complement and even enhance achievement of selected remedies. Warm-season native grasses and forbs were used for revegetation of remediated areas. The hardiness and ability to establish in low-nutrient conditions make native grasses ideal candidates for reestablishment of vegetation in excavated areas. At the Fernald Preserve, native grasses were used for vegetative cover on an on-site disposal facility as well. Also at the Fernald Preserve, excavation footprints were optimized to increase the quantity and quality of created wetlands. Drainage features in a couple instances provide passive groundwater recharge, potentially accelerating groundwater remediation efforts. In addition, a number of clean materials and structures were beneficially reused as part of ecological restoration designs, including wood-chip mulch and woody debris, clean concrete, and a rail trestle. At the Weldon Spring Site, several methods were used to control erosion for three years after the initial seeding of native species. A field evaluation of soil conditions and general species diversity was performed in 2007 and it was determined that erosion at the site was typical and repairing naturally. These approaches resulted in 'win-win' strategies needed to successfully remediate and restore complex projects such as the Fernald Preserve and Weldon Spring. (authors)

54 ENVIRONMENTAL SCIENCES↗

Estimating Mangrove Aboveground Biomass from Airborne LiDAR Data: a Case Study from the Zambezi River Delta

Mangroves are ecologically and economically important forested wetlands with the highest carbon (C) density of all terrestrial ecosystems. Because of their exceptionally large C stocks and importance as a coastal buffer, their protection and restoration has been proposed as an effective mitigation strategy for climate change. The inclusion of mangroves in mitigation strategies requires the quantification of C stocks (both above and belowground) and changes to accurately calculate emissions and sequestration. A growing number of countries are becoming interested in using mitigation initiatives, such as REDD+ (reducing emissions from deforestation and forest degradation), in these unique coastal forests. However, it is not yet clear how methods to measure C traditionally used for other ecosystems can be modified to estimate biomass in mangroves with the precision and accuracy needed for these initiatives. Airborne Lidar (ALS) data has often been proposed as the most accurate way for larger scale assessments but the application of ALS for coastal wetlands is scarce, primarily due to a lack of contemporaneous ALS and field measurements. Here, we evaluated the variability in field and Lidar-based estimates of aboveground biomass (AGB) through the combination of different local and regional allometric models and standardized height metrics that are comparable across spatial resolutions and sensor types, the end result being a simplified approach for accurately estimating mangrove AGB at large scales and determining the uncertainty by combining multiple allometric models.We then quantified wall-to-wall AGB stocks of a tall mangrove forest in the Zambezi Delta, Mozambique. Our results indicate that the Lidar H100 height metric correlates well with AGB estimates, with R(exp 2) between 0.80 and 0.88 and RMSE of 33% or less. When comparing Lidar H100 AGB derived from three allometric models, mean AGB values range from 192 Mg ha(exp −1) up to 252 Mg ha(exp −1).We suggest the best model to predict AGB was based on the East Africa specific allometry and a power-based regression that used Lidar H100 as the height input with an R(exp 2) of 0.85 and an RMSE of 122 Mg ha(exp −1) or 33%. The total AGB of the Lidar inventoried mangrove area (6654 ha) was 1 350 902 Mg with a mean AGB of 203 Mg ha(exp −1) +/-166 Mg ha(exp −1). Because the allometry suggested here was developed using standardized height metrics, it is recommended that the models can generate AGB estimates using other remote sensing instruments that are more readily accessible over other mangrove ecosystems on a large scale, and as part of future carbon monitoring efforts in mangroves.

Fatoyinbo, Temilola↗

AmeriFlux CA-BCW Big Creek Watershed

This is the AmeriFlux version of the carbon flux data for the site CA-BCW Big Creek Watershed. Site Description - This flux tower is located in the Lower Big Creek Watershed on agricultural land restored by the Nature Conservancy of Canada. The tower is monitoring a 0.88 ha marsh dominated by rushes and open shallow water. This wetland was created in 2012.

Barreto, Carlos [Ontario Ministry of Natural Resou↗